Forwards Revised Erpips,Including Rev 3 to Erpip 102, Superintendent-Nuclear Operations, Rev 3 to Erpip 202, Plant General Manager & Rev 4 to Erpip 501, Site Emergency Coordinator
ML20212H403
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/22/1998
From: Forgette T
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212H407 List:
References
NUDOCS 9804270262
Download: ML20212H403 (1)


Text

.

CAIArRT CLirrs NUCLEAR POMER PLANT Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 April 22,1998 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk SUIUECT:

Calvert Cliffs Nuclear Power Plant; Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation Docket No. 72-8 Changes to the Emergency Resnonse Plan Imnlementation Procedures As required by 10 CFR Part 50, Appendix E, V, " Implementing Procedures," and 10 CFR 50.4(b)(5),

changes to the Er..ergency Response Plan Implementing Procedures are enclosed.

Should you have questions regarding this matter, please contact me (410-495-4996) or Mr. John Osborne (410-495-2252).

Very truly rs, Y

'(

Q T. E. Forgmte Director-Emergency Planning TEF/JMO/bjd

Enclosures:

ERPIP 102, Revision 3 ERPIP 202, Revision 3 ERPIP 501, Revision 4 f a !; '

cc:

(Without Enclosures)

.[3 R. S. Fleishman, Esquire

11. J. Miller, NRC J. E. Silberg, Esquire Resident inspector,NRC Director, Project Directorate 1-1, NRC R.1. McLean, DNR A. W. Dromerick, NRC J. II. Walter, PSC 9804270262 980422 PDR ADOCK 05000317 F