ML20212H083

From kanterella
Jump to navigation Jump to search
Forwards Description of Scope & Objectives for 1987 Facility Emergency Exercise.Exercise Scheduled for April 1987 & Will Involve Participation by Charlevoix & Emmet Counties & State of Mi
ML20212H083
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/16/1987
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8701210275
Download: ML20212H083 (4)


Text

e

=

@rewaums Consumers Power MKMN5 PnoEREss General offices: 1945 West Parnall Road, Jackson, MI 49201 * (517) 788-0550 January 16, 1987 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

1987 BIG ROCK POINT EMERGENCY EXERCISE SCOPE AND OBJECTIVES (75 DAY LETTER)

Attached is a description of the scope and objectives for the 1987 Big Rock Point Plant emergency exercise. The exercise is scheduled for April 1987 and will involve participation by Charlevoix and Emmet Counties and the State of Michigan.

Should you have questions on the exercise, the contact individual within j

Consumers Power Company-is Anthony P Katarsky Senior Nuclear Emergency Planner 1945 W Parnall Road Jackson MI 49201 (517) 788-2405

._I,s_

Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point Attachment Oh 8701210275 870116 PDR ADOCK 05000155 Y

PDR OC0187-0001-NLO2 l

=,.. _ -

I

? J

o y.

- 9 e-ATTACHMENT-Consumers Power Company Big Rock Point Plant Docket 50-155 1987 EMERGENCY EXERCISE SCOPE AND OBJECTIVES January 16, 1987 m

6 t

l l

3 Pages I

i AT0187-0001-NLO2

d o

1.0 SCOPE AND OBJECTIVES 1.1 SCOPE BREX 87 is cesigned to meet exercise requirements specified in 10CFR50, Appendix E, Section IV.F.

It will postulate events which would require activation of major portions of the site emergency plan and response by offsite authorities. The exercise will be unannounced to Consumers Power Company, State of Michigan, and County emergency response personnel. It will also occur during the areas's winter season. Real time activation of Company and offsite Emergency Response Facilities will occur.

Specific details on the conduct of the exercise will be closely coordinated with your staff.

1.2 OBJECTIVES The exercise will demonstrate:

1.

Assessment and Classification a.

Recognition of emergency conditions b.

Timely classification of emergency conditions in accordance sith emergency action levels 2.

Communication Initial notification within specified time constraints (state and a.

local - 15 minutes, NRC - I hour) b.

Subsequent notification in accordance with procedure c.

Notification and coordination with other organizations, as required (other utilities, contractors, fire or medical services) d.

Provision of accurate and timely information to support news release activity e.

Provision of rumor control support 3.

Radiological Assessment and Control a.

Calculation of dose projection based on sample results or monitor readings b.

Performance of in-plant and offsite field surveys c.

Collection and analysis of a post-accident primary coolant sample d.

Trending of radiological data Formulation of appropriate protective action recommendations e.

AT0187-0001-NI.02

t o

i f.

Contamination and exposure control 4.

Emergency Response Facilities a.

Activation, staffing and operation at appropriate classifications and within specific.d time constraints b.

Adequacy of emergency equipment and supplies c.

Adequacy of emergency communication systems d.

Access control 5.

Emergency Management a.

Command and control with transfer of responsibilities from Control Room to Technical Support Center to Emergency Operations Facility b.

Assembly and accountability within 30 minutes c.

Coordination with State of Michigan emergency organization d.

Mitigation of operational and radiological conditions e.

Mobilization of emergency teams 6.

Reentry and Recovery a.

Assessment of damage and formulation of recovery plan b.

Identification of constraints, requirements and organization to implement the plan 7.

Exercise Control a.

Provision for maximum free play b.

Accurate assessment of player performance AT0187-0001-NLO2