ML20212G838
| ML20212G838 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 01/14/1987 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Mitchell S COMPUTERIZED INTERFERENCE ELIMINATION, INC. |
| References | |
| NUDOCS 8701210198 | |
| Download: ML20212G838 (2) | |
Text
.
o
,- : 6 JA,*J 141937 Docket No. 50-454 Docket No. 50-455 Mr. Schuyler R. Mitchell, President Computerized Interference Elimination, Inc.
2129 - 152nd Avenue Redmond, WA 98052
Dear Mr. Mitchell:
This letter confirms our plans to meet with you on January 26, 1987. The meeting will begin at 1:00 p.m. (CST) in the NRC's Region III Office located in Glen Ellyn, Illinois. During this meeting w plan to discuss the scope, results', and conclusions of our inspection effort related to your concerns regarding as-built drawings at the Byron Station. We look forward to meeting with you, a
Oe!9fnal siened by A. Ear: BavIn James G. Keppler Regional Administrator 4
See Attached Distribution 4
i RI Iy RII II RIII RII Ne ler i rrison/jk Pa lo L
s B sn Da s 01/14/87 01/lf/87 01/ /87
/ f -7 01/N/87 01//)487 k/
i
_ RED 8
~
0701210198 870114 PDR ADOCK 05000454 O
e a
JA:l l41987 Mr. Schuyler R. Mitchell 2
Distribution L.'W. Zech, Chairman, NRC Dr. Terry R. Lash, Director, IDNS Mary Bushnell, Illinois Connerce Commission Cordell Reed, Vice President T. J. Maiman, Vice President and Manager of Projects D. L. Farrar, Director of Nuclear Licensing V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DCS/RSB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis-Dunton, Attorney General's Office, Environnental Control Division D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public Utilities Division Diane Chavez, DAARE/ SAFE L. 01shan, LPM, NRR H. S. Taylor, Quality Assurance Division bcc:
V. Stello, E00 W. Brock, EDO D. Humenansky, OCM J. H. Taylor, IE E. L. Jordan, IE S. Ebneter, P.I