Forwards Revs to Epips,Including Rev 26 to EP-002-100,rev 25 to EP-002-102 & Rev 20 to EP-003-040.Noted That EP-002-100, Rev 26 & EP-002-102,rev 25 Contain Changes Which Will Be Incorporated Into Next Revision of Emergency Plan
ML20212G742
Person / Time
Site: Waterford 
Issue date: 11/05/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212G748 List:
References
W3F1-97-0251, W3F1-97-251, NUDOCS 9711070076
Download: ML20212G742 (2)


Text

_ _ _ _.

~..

../ ~ N

?

he Itg/

Er e gy operations,Inc.

Killona. LA 70006 Tel 504 739 6242 Early C. Ewing, lil ic ety & Regdawy Afan W3F1-97-0251 A4.05 i

PR Novembe-5,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SF.S Docket No. 50-382 License No. NPF-38 Emergency Plan Implementing Procedures Gentlemen:

Enclosed are the latest issues of three recently revised Waterford 3 Emergency Plan Implementing Procedures. This submittalis being made in accordance with Appendix E of 10CFR50. These cnanges were reviewed in accordance with 10CFR50.54 requirements and were determined not to decrease the effectiveness of the emergency plan.

Included in this submittal are the following procedures:

1.

EP-002-100 (Revision 26), Technical Support Center (TSC) Activation, i

Operation and Deactivation. This revision involves TSC organization changes and administrative changes affecting transfer activities and addition of the Control Room Intercom Circuit

/

2.

EP-002-102 (Revision 25), Emergency Operations Facility (EOF) Activation, Operation and Deactivation. This revision involves EOF organization changes j

and administrative changes affecting transfer activities and addition of the h, /!g Contiol Room Intercom Circuit.

3.

EP-003-040 (Revision 20), Emergency Equipment Inventory. This revision provides clarification of existing requirements and adds guidance to ensure emergency equipme nt is inventoried.

(NOTE:

EP-002-100, Revision 26 and EP-002-102, Revision 25 contain changes which will be incorporated into the next revision of the

'pnq' Emergency Plan.)

~

H 9711070076 971105 PDR ADOCK 05000382 F

PDR

s..

Emergency Plan implementing Procedures W3F1-97-0251 Page 2 -

November 5,1997 Should you have any questions concerning these procedures, please contact J.J. Lewn, Emergency Planning Manager, at (504) 739-6624.

Very truly yours, E.C. Ewing Director Nuc' ear Safety & Regulatory Affairs ECE/ssf Enclosures cc:

(w/ Enclosures)