Forwards Revs to Epips,Including Rev 26 to EP-002-100,rev 25 to EP-002-102 & Rev 20 to EP-003-040.Noted That EP-002-100, Rev 26 & EP-002-102,rev 25 Contain Changes Which Will Be Incorporated Into Next Revision of Emergency Plan
ML20212G742
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/05/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212G748 List:
References
W3F1-97-0251, W3F1-97-251, NUDOCS 9711070076
Download: ML20212G742 (2)


Text

_ _ _ _ . __ . - ~ . . -

1

../ ~ N l

? he I

tg/ Er e gy operations,Inc.

Killona. LA 70006 Tel 504 739 6242 Early C. Ewing, lil ic ety & Regdawy Afan W3F1-97-0251 A4.05 i PR Novembe- 5,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SF.S Docket No. 50-382 License No. NPF-38 Emergency Plan Implementing Procedures Gentlemen:

Enclosed are the latest issues of three recently revised Waterford 3 Emergency Plan Implementing Procedures. This submittalis being made in accordance with Appendix E of 10CFR50. These cnanges were reviewed in accordance with 10CFR50.54 requirements and were determined not to decrease the effectiveness of the emergency plan.

Included in this submittal are the following procedures:

1. EP-002-100 (Revision 26), Technical Support Center (TSC) Activation, i Operation and Deactivation. This revision involves TSC organization changes
and administrative changes affecting transfer activities and addition of the Control Room Intercom Circuit

/

2. EP-002-102 (Revision 25), Emergency Operations Facility (EOF) Activation, Operation and Deactivation. This revision involves EOF organization changes j and administrative changes affecting transfer activities and addition of the Contiol Room Intercom Circuit. h, /!g
3. EP-003-040 (Revision 20), Emergency Equipment Inventory. This revision provides clarification of existing requirements and adds guidance to ensure emergency equipme nt is inventoried.

(NOTE: EP-002-100, Revision 26 and EP-002-102, Revision 25 contain

'pnq'

~

changes which will be incorporated into the next revision of the Emergency Plan.)

9711070076 971105 PDR ADOCK 05000382 H

s ..

Emergency Plan implementing Procedures W3F1-97-0251 Page 2 -

November 5,1997 Should you have any questions concerning these procedures, please contact J.J. Lewn, Emergency Planning Manager, at (504) 739-6624.

Very truly yours, E.C. Ewing Director Nuc' ear Safety & Regulatory Affairs ECE/ssf Enclosures cc: (w/ Enclosures)