ML20212G674
| ML20212G674 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/12/1987 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8701210121 | |
| Download: ML20212G674 (2) | |
Text
.
-r JAN 12127 No.87-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee: Boston Edison Company Name of Facility:
Pilgrim Nuclear Power Station Docket No.:
50-293 Time and Date of Meeting:
1:30 p.m., January 20, 1987 Location of Meeting:
Region I Office, Main Conference Room Purpose of Meeting:
Discuss Fire Protection Program Weaknesses NRC Attendees:
W. F. Kane, Director, Division of Reactor Projects S. D. Ebneter, Director, Division of Reactor Safety W. V. Johnston, Deputy Director, Division of Reactor Safety (DRS)
S. J. Collins, Deputy Director, Division of Reactor Projects (DRP)
J. P. Durr, Chief, Engineering Branch, DRS A. R. Blough, Chief, Projects Branch No. 1, DRP C. J. Anderson, Chief. Plant Systems Section, EB, DRS J. T. Wiggins, Chief, Reactor Projects Section 18, PS1, DRP M. H. McBride, Senior Resident Inspector Licensee Attendees: J. Lydon, Chief Operating Officer R. Bird, Senior Vice President - Nuclear Operations A. Oxsen, Vice President - Nuclear Operations R. Swanson, Nuclear Engineering Manager
~~
A. Pedersen, Plant Manager K. Roberts, Director, Outage Management F. Wazniack, Fire Protection Group Leader Note: Attendance by NRC personnel at this meeting should be made known by January 16, 1987, via telephone call to J. Wiggins, Region I, at FTS 8-488-1128 or 215-337-5128.
Prepared by:
)
J/ T. Wt'g s, Chief Wactor ects Section IB 8701210121 870112 g
D PDR ADOCK 05000293
/
F PDR
/
e.
- p 2
Distribution:
Victor Stello, Jr., Executive Director for Operations James Sniezek, Deputy Executive Director for Regior.al Operations and Generic Requirements-James M. Taylor, Director, Office of Inspection and Enforcement James G. Partlow, Director, Division of Inspection Programs, IE Jane Axelrad, Director, Enforcement Staff, IE J. Lieberman, Assistant General Counsel for Enforcement, OGC R. Bernero, Director, Division of Boiling Water Reactor Licensing, NRR R. Auluck, Licensing Project Manager, BWR Project Directorate No. 1, NRR J. Zwolinski, Director,.BWR Project Directorate No. 1, NRR Public Document Room (PDR)
Local Public Document Room (LPDR)
~, _.
_