Requests NRC Re Util Piping Insp Plan for Fall 1986 Refueling Outage Be Modified to Remove Ref to Induction Heating Stress Improvement.Mechanical Stress Improvement Process Will Be Used.Util Confusing
ML20212G644
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 01/14/1987
From: Allen C
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
2598K, GL-84-11, NUDOCS 8701210105
Download: ML20212G644 (2)


Text

,-.

g J

>m

{v One Fwst Nabonal Plaza. CNcago, IEnois Z

) Aggtfrees Reply tz Post Omco Box 767

/ Chca00. lEncis 60590 0767 January 14, 1987 Mr. Harold R. Denton, Director Office of, Nuclear Reactor Regulation U.S. Nuclear Regulatory Comunission J

Washington, DC 20555

Subject:

LaSalle County Station Unit 2 Stainless Steel Piping Inspection Plan, Fall 1986 Refueling Outage NRC Docket No. 50-374 References (a): Letter from J. A. Zwolinski to D. L.

Farrar dated January 7, 1986 (b): Letter from C. M. Allen to H. R. Denton dated September 14, 1986 (c): Letter from Dr. A. Bournia to D. L. Farrar dated December 16, 1986

Dear Mr. Denton:

In accordance with Reference (a), we provided our piping inspection plan for the LaSalle County Station Unit 2 Refueling Outage in Reference (b).

The inspection plan was prepared consistent with the guidance in Generic Letter 84-11.

Reference (c) transmitted acceptance of that inspection plan.

Statement 1 in Attachment A to Reference (b) was confusing in that it could-be (and was as indicated in Reference (c)) read that we intended to perform the Induction Heating Stress Improvement (IHSI) on approximately 40 additional welds. Our stess improvement planned for these welds will be done using Mechanical Stress Improvement Process (MSIP) rather than IHSI.

Conunonwealth Edison is aware that MSIP is not an approved stress improvement process at present.

Commonwealth Edison requests that the letter of December 16, 1986 be modified to remove reference to IHSI being done this outage. We apologize for the confusion caused by the poor choice of words used in Reference (b).

S 8701210105 870114 PDR ADOCK 05000374 G

PDR

r.

Mr. H. R. Denton January 14, 1987 If you have any additional questions regarding this matter, please address them to this office.