ML20212G294
| ML20212G294 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/24/1999 |
| From: | Emch R NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20212G297 | List: |
| References | |
| NUDOCS 9909290188 | |
| Download: ML20212G294 (8) | |
Text
t0 RECO p
i UNITED STATES g
,j NUCLEAR REGULATOHY COMMISSION e
WASHINGTON, D.C. 20565-0001 j
'*...+*f v
SOUTHERN NUCLEAR OPERATING COMPANY. INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA DOCKET NO. 50-321 EDWIN 1. HATCH NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 217 License No. DPR-57
- 1. The Nuclear Regulatory Commission (the Commission) has found that.
A. The application for amendment tc the Edwin I. Hatch Nuclear Plant, Unit 1 (the facility)
Facility Operating License No DPR-57 filed by Southern Nuclear Operating Company, Inc. (Southern Nuclear), acting for itself, Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated July 29,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter ll D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part Si of the Commission's regulations and all applicable requirements have been satisfied.
I l
9909290188 990924 l
PDR ADOCK 05000321 p
i e
1 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-57 is hereby amended to read as follows:
(2) -Technical Soecifications The Technical Specifications contained in Appendix A a' nd the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 217, are hereby incorporated in the license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Richard L. Emch, Jr., Chief, Section 1 Project Directorate ll Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of issuance: September 24, 1999 4
i l
1 L
ATTACHMENT TO LICENSE AMENDMENT NO. 217 FACILITY OPERATING LICENSE NO. DPR-57 DOCKET NO. 50-321 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3.1-21 3.1-21 i
)
SLC System 3.1.7 3.1 REACTIVITY. CONTROL SYSTEMS
.3.1.7 Standby Liquid Control (SLC) System LCO 3.1.7-~
Two SLC subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS-CONDITION REQUIRED ACTION COMPLETION TIME A.
Sodium pentaborate A.1 Restore sodium 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> solution not within-pentaborate solution Region A limits of to within Region A E
. Figure 3.1.7-1 or limits.
3.1.7-2, but within 10 days from l
the Region B limits.
discovery of failure to meet the LC0 B.
One SLC subsystem B.1 Restore SLC subsystem 7 days inoperable for reasons to OPERABLE status, other than M
Condition A.
10 days from discovery of failure to i
meet the LC0 C.
Two SLC subsystems C.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for reasons subsystem to OPERABLE other than status.
-Condition A.
'D.
Required Action and D.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
HATCH UNIT 1 3.1-21 Amendment No. 217
l 1
o urg 1
UNITED STATES g
Ij NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20556-0001
- /
SOUTHERN NUCLEAR OPERATING COMPANY. INC.
GEORGIA POWER COMPANY l
O_GLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA l
i DOCKET NO. 50-366 i
EDWIN l. HATCH NUCLEAR PLANT. UNIT 2 l
l AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 158 License No. NPF 5
- 1. The Nuclear Regulatory Commission (the Commission) has fcund that:
l A. The application for amendment to the Edwin 1. Hatch Nuclear Plar.t, Unit 2 (the facility) l Facility Operating License No. NPF-5 filed by Southern Nuclear Operating Company, Inc. (Southern Nuclear), acting for itself, Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated July 29,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 1
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
I l
J
E
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.158 are hereby incorporated in the license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Richard L. Emch, Jr., Chief, Sectio 1 Project Directorate il Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of issuance: September 24, 1999
ATTACHMENT TO LICENSE AMENDMENT NO.158 FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 l
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove insert i
3.1-21 3.1-21 i
i i
l a
I.
SLC System 3.1.7
- 3.1 ' REACTIVITY CONTROL SYSTEMS
. 3.1.7-Standby Liquid, Control.(SLC)~ System.
. LCO'~3.1.7 Two SLC subsystems.shall be'0PERABLE.
~
1 APPLICABILITY:
MODES-l'and 2..
ACTIONS CONDITION-REQUIRED ACTION COMPLETION TIME
~ A.' Sodium pentaborate A.1 Restore sodium 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s-solution not within pentaborate solution Region A' limits of to within Region A E
Figure 3.1.7-1 or limits.
3.1.7-2, but within 10 days from l
the. Region B limits, discovery of failure to meet the LC0 p
B.
One SLC subsystem B.1 Restore SLC subsystem 7 days
. ~ inoperable for reasons.'
to OPERABLE status.
other than M
Condition A.
10 days from discovery of failure to meet the LCO C.
Two SLC subsystems.
C.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable'for reasons-subsystem to OPERABLE other than.
status.
Condition A.
D.,: Required' Action and-D.I.
Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
- associated Completion Time not met.-
HATCH. UNIT 2-3.1-21 Amendment No.158 3