Ltr Contract:Task Order 3 Entitled, Review MC&A in NRC Mixed-Oxide, Std Review Plan Under Contract NRC-02-98-008
ML20212G179
Person / Time
Issue date: 09/27/1999
From: Pool S
NRC OFFICE OF ADMINISTRATION (ADM)
To: Mcdowell S
AFFILIATION NOT ASSIGNED
References
CON-FIN-J-5295, CON-NRC-02-98-008 NUDOCS 9909290139
Download: ML20212G179 (6)


Text

,J M

- A ntioq p

UNITED STATE 3 s

j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 20eeH001

%*ss**+

SEP 2 41996 21st Century Industries, Inc.

Attn: Sam McDowell 444 North Frederick Ave., Suite 317 Gaithersburg, MD. 20877 l

SUBJECT:

TASK ORDER NO. 3 ENTITI.ED " REVIEW MC&A IN NRC MIXED-OXIDE' STANDARD REVIEW PLAN UNDER CONTRACT NO. NRC-02-98-008 Dear Mr. Brenner.-

In accordance with Section G.5, Task Order Procedures, of the subject contract, this letter definitizes Task Order No. 3. This effort shall be performed in accordance with the enclosed Statement of Work.

Task Order No. 3 shall be in effect from September 27,1999 to November 30,1999. The total cost plus fixed fee for this task order is $15,204, in which the amount of $14,480 represents the reimbursable costs, and the amount of $724 represents the fixed fee. Funds in the amount of

$12,500 are obligated to incrementally fund this task order. Of this $12,500, $11,905 represents

{

funds for the estimated cost and $595 represents funds for the fixed fee.

Accounting data for this task order is as follows-B & R N o.: 95015201105 t

BOC:

252A JCN.:

J5295 A P P N N o.: 31X0200 FFS:

5099R142 OBLIGATED AMOUNT THIS ACTION: $12,500 l

The following individual (s) are considered to be essential to the successful performance of the work hereunder l

l James Lovett l

The Contractor agrees that such personnel'shall not be removed from the effort under the task order without compliance with Contract Clause H.2, Kev Personnel.

Your contacts during the course of this task order are:

Technical Matters:

Donna Umbel-Project Officer 301/415-7819 I

Yen-Ju Chen-Task Order Technical Monitor

[j')

{

301/415-5615 t

9909290139 990927 PDR CONTR NRC-02-98-OOS PDR

TCl 'A Any contractual matters should be referred to me on 301/415-8168. The issuance of this task order does not amend any terms or conditions of the subject contract. Please indicate your acceptance of this task order by having an official who is authorized to bind your organization, execute three copies of this document in the spaces provided below and return two fully executed copies to me. You should retain the third copy for your records.

Sincerely,

)

f t

ool, ontr ing ( fficer Division of Contracts and Property Management

Enclosure:

As stated ACCEPTED T.O. #3 NRC-02-98-008 p;,

--<c-F % [:- "

TITL[EX CC-V.V.

.DATE g,a x 1 g, (%9

..e-STATEMENT OF WORK

. PROJECT TITLE:

Technical Assistance to Review Material Control and Accounting in NRC Mixed-Oxide (MOX) Standard Review Plan TYPE OF CONTRACT:

Full Cost Fee Recoverable, Full Scope Task PROPOSED CONTRACTOR: Twenty-First Century industries, Inc. (TCl)

. JOB CODE:

J5295 B&R CODE:

5015201105 (99) 5015201125 (00)

DOCKET NUMBER:

70-3098

. TAC NUMBER:

..TBD NRC OFFICE /DIVISIONi NMSS/FCSS NRC PROJECT OFFICER:

Donna Umbel (301) 415-7819 NRC TECHNICAL PROJECT MANAGER:

Yen-Ju Chen (301) 415-5615

1.0 BACKGROUND

The Defense Authorization Bill for Fiscal Year 1999 amended the Energy Reorganization Act to give the U.S. Nuclear Regulatory Commission authority over "Any facility under contract with and for the account of the Department of Energy that is utilized for the express purpose of fabricating mixed plutonium-uranium oxide nuclear reactor fuel for use in a commercial nuclear reactor heensed under such Act, other than any such facility that is utilized for research, development, demonstration, or analysis purposes."

In March 1999, the Department of Energy (DOE) contracted with the consortium of Duke Engineering, Cogema Inc., and Stone & Webster, commonly referred to as DCS, for the design, construction and operation of a mixed-oxide (MOX) fuel fabrication facility to generate fuel for a select number of nuclear power reactors in the U.S. The NRC will have regulatory

. authority for this facility and expects to receive a license application from DCS at the end of

. Fiscal Year 2000.

The NRC anticipates licensing the construction and operation of a MOX fuel fabrication facility under 10 CFR Part 70, which is currently under revision (see 64 Federal Reoister 41338). To

_ prepare for the license application, the NRC is preparing guidance in the form of a facility

' specific MOX standard review plan (SRP). The MOX SRP will be used to assist NRC staff in its review of the license application.

Material Control & Accounting (MC&A) is one area that will be covered in the MOX SRP.

Technical assistance is required in the area of MC&A to review the material that NRC prepares

.for the MOX SRP.

2.0; OBJECTIVE.

The objective of this work is to provide the NRC with technical assistance to review and comment on the MC&A area of the MOX SRP.

LI'.

u t

2 1

3.0 STAFFING The use of experienced personnel for the key positions on this project is considered essentia{

to the success of the project. At a minimum, key personnel willinclude the Project Manage and the Task Leader overseeing or performing the actual work. Key positions may not be assigned or approved without the prior approval of the NRC Technical Project Manag The Project Manager sha'l have broad experience in MC&A and general knowledge of the application of MC&A at fuel fabrication facilities. The Task Leader shall have in-depth exp in MC&A,' 10 CFR Part 70 (including proposed revisions), and MC&A issues associated with weapons grade Pu processing. The Task Leader shall also be familiar with NRC guidance on the licensing and operation of fuel fabrication facilities. The Task Leader shall have extensive experience in the technical and regulatory aspects of evaluating MC&A.

4.0 SCOPE OF WORK AND DELIVERABLES The scope of work under this Task shallinvolve the review of the MC&A Area of the MOX SRP. As part of the review, the contractor shall review and evaluate material provided NRC. The contractor shall provide both general comments and section specific comments on the MC&A section from the MOX SRP. When applicable, comments shal! reference the section and page line number. Each contractor comment shall be justified, i.e., the contractor shall provide the basis for the comment. Each comment shall be accompanied with a proposed resolution. The contractor shall provide the comments in a Letter Report format, and any section specific comment shall be accompanied by a recommendation for specific word changes.

The first deliverable for this Task is a Draft Letter Report due to the NRC 15 business days after the Task is initiated.

After the NRC responds to the contractor's Draft Letter Report, the contractor shall revise the l

i letter report to incorporate the NRC's comments. The Final Letter Report is due to the NRC 10 business days after receipt of the NRC's comments. Refer to Section 12.0 of this SOW for other deliverable format requirements.

The deliverables for this Task are:

Deliverable Schedule Draft Letter Report 15 business days after the NRC initiates the Task.

Final Letter Report 10 business days after NRC provides comments on the Draft Letter Report

'~

m 3

5.0 PROJECT MANAGEMENT Maintain Effective Communication with NRC Staj_

integrate work under this Task. For the duration p coordinate and

' Task Leader and TPM will participate in a meeting c or will participate in a ontractors contractors findings.

ask to discuss the Other Communication than the NRC's TPM and Project Officer through the entities other NRC Comments The contractor shall resolve all NRC comments when making revi under this Task.

i y e verable 6.0 ACCEPTANCE CRITERIA deliverables and maintains all appropriate record ne n supported by appropriate tables and graphics. The contractors del c or deliverable is technical detail that the NRC may verify any of the contractors u c ent applicable.

7.0 LEVEL OF EFFORT The estimated level of effort for this T'ask is 0.1 FTE.

- 8.0 MEETINGS AND TRAVEL The contractors Task Leader shall meet with the NRC T offices in Rockville, Maryland. The NRC technical staff may periodic ask in NRC contractor in the contractors offices to review progress and provid necessary and desirable. Meetings requiring contractor travel are summa s

Topic

_ Location _

Trrips Days Stag Task Conclusion Rockville, MD 1

3 2

For calculation purposes, assume the number of days includes 2 days

r l

4 9.0 NRC FURNISHED MATERIAL MOX SRP, a copy of proposed 10 CFR Part 70, and r 10.0 CONTRACTOR ACQUIRED MATERIAL The contractor is not expected to acquire material under this Task.

11.0 PERIOD OF PERFORMANCE The deliverables and schedub for work conducted under this Ta 4.0, Work on this Task is expected to proceed on schedule, contingent on the NRC's preparation of the draft MOX SRP.

The deliverables for work conducted under this task shat! be completed within the initiation of the effort.

12.0 REPORTS The deliverables shall be submitted in hard copy, in an electronic medium form c the word processor in use at the NRC (Word Perfect 8.2), and in an electronic ed The contractor shall also provide a hard copy of each deliverable to the NRC's and TPM. Reports on any assessment by the contractor shall be in letter report form.

i Deliverables that are revisions of previous submittals willinclude markings to indica the contractor changed the text, tables, or graphics.

13.0 TECHNICAL DIRECTION The NRC TPM for this Task is Yen-Ju Chen. Donna Umbelis designated the NR Officer. Technicalinstructions may be provided to the contractor during this Task. Te instructions shall not constitute new assignments of work or changes of such a nature justify an adjustment in cost or period of performance Directions if any for h of work, cost, or period of performance will be issued by the NRC Contracting Officer.c an

,