Comments on Draft Low Power License.Item 6(a) Should Be Clarified to State That Water Would Drain Freely (as Spent Fuel Pool Pumped Down) & Items 6(c)-6(d) Should Be Revised as Listed
ML20212G057
Person / Time
Site: Vogtle 
Issue date: 01/05/1987
From: Bailey J
GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GN-1290, NUDOCS 8701120256
Download: ML20212G057 (2)


Text

L Georgit Power Company Fbst Offica Box 282 Waynesboro, Georgis 30830 Telephone 404 554 9961 404 724-8114 Southern Company Services, Inc.

Fbst Office Box 2625 Birmingham, Mabama 35202 Telephone 205 870-6011 VOgtie Project January 5, 1987 Director of Nuclear Reactor Regulation File:

X7BC35 Attention:

Mr. B. J. Youngblood Log:

GN-1290 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC DOCKET NUMBER 50-424 CONSTRUCTION PERMIT NUMBER CPPR-108 V0GTLE ELECTRIC GENERATING PIANT - UNIT 1 COMMENTS TO DRAFT LOW-POWER LICENSE

Dear Mr. Denton:

Georgia Power Company has reviewed the Vogtle Unit 1 draft license, as requested in the referenced letter, and hereby provides the following comments:

Page 4, Item 6(a):

Clarification may need to be added to this item to state that "... water would drain freely (as the spent fuel pool is pumped down)..."

No provisions exist for draining the pool without the use of pumps.

Page 5, Items 6(c)-6(d):

Please revise item (c) to read as follows:

No more than one fuel assembly shall be out of its shipping container or storage location at any given time during receipt inspection and storage prior to core loading.

Change the present item (d) to item (e).

Insert a new item (d) to read as follows:

During core loading, no more than one fuel assembly shall be out ot its shipping container or storage rack at any given time in the Fuel Handling Building.

No more than two fuel assemblies shall be out of the reactor vessel at any given time in the Containment Building.

As presently worded, these items pose unnecessary constraints.

8701120256 870105 ESccl PDR ADOCK 05000424 A

PDR "

]O

U.S Nuclear Regulatory Commission File:

X7BC35

- January 5,1987 Page 2 Page 5, Item (11):

Ventilation will be provided for the Alternate Radwaste Building to establish an overall.in-leakage of air from the outside. Ventilation will. exhaust through HEPA filters already installed in the Auxiliary Building HVAC System and be discharged through the plant vent stack. This will be accomplished through an intertie with the Auxiliary Building HVAC System through the Radwaste Transfer Building. Testing of the Auxiliary Building HVAC System is described in the FSAR. Testing will be performed using smoke to assure an overall in-leakage of air from the outside into the Alternate Radwaste Building., Page 3, Item 6:

The TDI Owner's Group has stated (reference letter NOR-01033, dated 12/30/86) that addition of this Dresser coupling is not necessary. Therefore, GPC requests that this item be deleted.

If your staff requires any additional information, please do not hesitate to contact me.

Sincerely, J. A. Bailey Project Licensing Manager JA3/caa xc:

R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig j

B. W. Churchill, Esquire R. W. McManus M. A. Miller (2)

L. T. Gucwa B. Jones, Esquire Vogtle Project File G. Bockhold, Jr.

0978V

.m

, -,.... - ~ -

. e

- -