october 21, 1997 Mr. Steven A. Toelle, Manager -
Nuclear Regulatory Assurance and Policy U. S. Enrichment Corporation 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817
SUBJECT:
MODIFICATION OF THE AUTOCLAVE INTERLOCK CONTROLS COMPLIANCE PLAN ISSUE 3, ACTION 8
Dear Mr. Toelle:
Your September 29,1997, letter requested the NRC's acknowledgment of a proposed change to the Commitment section of the Paducah Compliance Plan, Issue 3. Action 8 of issue 3 required modification of the C 360 autoclave controls to prevent the autoclaves from Doing inadvertently opened when an autoclave High Pressure isolation System containment signalis present. USEC has determined that the existing system installation already performs this function and plans to revise the Safety Analysis Report to reflect this situation. The text of SAR section 3.6.7.5 is also contained in the Commitment section of Complianca Plan, Issue 3 and, therefore, NRC acknowledgment is necessary before the section can be revised.
We have reviewed your letter and the applicable SAR and Compliance Plan sections and have coordinated our review with the Department of Energy. We have no objection to the proposed change to the Commitment section of Issue 3 of the Compliance Plan, if you have any questions, please contact Ms. Merri Horn of my staff at (301) 415 8126.
Sincerely, Original Signed By Robert C. Pierson, Chief Special Projects Branch Division of Fuel Cycle Safety end Safeguards, NMSS Docket No. 70 7001 Certificate GDP 1
!bb bkE H MPY cc:
Randall DeVault, DOE Steve Polston, PGDP DISTRIBUTION REQ on til Docket 70-7ool NRC File Center PUBUC i
d (IDg NMSS r/f FCSSr/f SPDr/t K'OBrien, Rlli FCOB PHiland, Rlll
'See previous concurrence i
OFC-
'SPD C
'SP8 C
'SPD C
S brson f
NAME MHorn:lj DHoadley oMartin DATE 1o/1o/97
- 1o/1o/97 t o/In/97 O/D97 C = COVER E = COVER & ENCLOSURE N = NO COPY g:toope3.mh OFFICIAL RECORD COPY W Mst 348%
C PDR
Vr. Steven A. Toelle, Manager N lear Regulatory Assurance and Policy U,
nrichment Corporation 2 Dem acy Center 6903 Roc ge Drive Bethesda, M 0817
SUBJECT:
MODIFl TlON OF THE AUTOCLAVE INTERLOCK CONTROLS COMPLlANCE PLAN ISS 3, ACTION 8
Dear Mr. Toelle:
Your September 29,1997, letter quested the NRC's acknowledgment of a proposed change to the Commitment section the Paducah Compliance Plan, issue 3. Action 8 of issu 4 3 required modification of the C-O autoclave controls to prevent t ie autoclaves from being inadvertently opened when a utoclave High Pressure isolation System containment signalis present. USEC has d rmined that the existing system installation already performs this function and plans to re ' e the Safety Analysis Report to reflect this situation. The text of SAR section 3.6.7.5 is als contained in the Commitment section of Compliance Plan, Issue 3 and, therefore, NRC ackn ledgment is necessary before the section can be revised.
We have reviewed your letter and the applicable SAR and mpliance Plan sections and we have no objection to the proposed change to the Commitmen section of issue 3 of the Compliance Plari, if you have any questions, please contact Ms. Merri Horn of my staf (301)410 8126.
Sincercly, Robert C. Pierson, Chief Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70 7001 Certificate GDP-1 cc:
Randall DeVault, DOE Steve Polston, PGDP DISTRIBUTION Docket 70-7o01 NRC Filo Center PUBLIC Region lli NMSS r/l FCSS t/f SPBt/f K'OBrien, Rlli FCOB PHiland, Ritt OFC SPB b
g SPD h
- SPB, SPB NAME orn.lj Td Hoadley artin RPierson DATE
/N/Mf7 l O f 10M
//[N
/ /97 C = COVER E = cover & ENCLOSilRE i