OPERATING DATA REPORT 50'228 DOCKET NO.

DATE

/~6-R 7 COMPLETED BY G /+v s b o TELEPHONE

'N6 N'/

OPERATING STATtJS

1. Unit Name:
2. Reporting Period M /# o/ 0000 fo #6 ' 7 J' *2 V#

s M '3

3. Licensed Theriaal Power (MWt):

/o#5

4. Nasneplate Rating (Gross MWe):

N#

5. Design F'ectrical Rating (Net MWe):
6. Maxhaum Dependable Capacity (Gross MWe): ' OPS'
7. Maxhaum Dependable Capacity (Net MWe):

'o90

8. If Changes Occur in Capacity Ratings (Items Number 3 ThrougL 7) Since last Report, Give Reasons:

AsA

9. Power level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

M This Month Yr..to Date Cumulative 7YY O F700 O

//3,970 0

11. Mours In Repeedng Period
12. Number Of Hours Reactor Was Cr'itical
6. O 599/ d 79 462 9 i
13. Reactor Resern Shutdown Hours M. O M. O 162/, f l
14. Hour Generator On-Line
d. O SV52, O 77 oST,2 1s. Unit Reser= Shutdown Hours
o. 6
d. D
d. d
16. Gross Theresal Emergy Generated (MWH)

O

/5FR7956 J/9.Vo/ 2/8

17. Gross Electrical Energy Generated (MWH)

O f15/ 'd59 70J76257

18. Not Electrical Energy Geasseted (MWH)

"3032 4' 96V 6/aY 7a VdV. V52

19. Unit Service Factor C.O b 4. 3 6 7. D
20. Unit AvellaWitty Factor O. O 62.2 67,6,
21. Unit Capacity Factor (Using MDC Net)

S, V 5 3. F 59,7

22. Unit Capacity Factor (Using DER Net)

- d. V 53.9 R7

23. Unit Forced Outage Rate O. O
7. 3

/3, /o

24. Ebendowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Eacht:

e

25. If Shut Down At End Of Report Period.Esthmated Date of Startup.
26. Units la Test Status (Prior to Commercial Operation):

Forecast Achieved 4

INITIAL CRITICAUTY INITIAL ELECTRICITY COMMERCIAL OPERATION 8701120116 861231 PDR ADOCK 05000295 (4/77)

R PDR _

Y.Y i

'll

AVERAGE DAILY UNIT POWER LEVEL oocxErNo.

3D-295 EJON A Y UNIT

~ ~O DATE

$h/k/

COMPLETED BY

?Y(O'$0S'f TELEFNONE noNsuj utmbdR DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

~b

~

I 17

-V

-7 2

-k

-Y 19 3

-Y

~

4 20

~Y

-Y 21

-3 22 6

-Y 23 7

~Y

- t/

24 8

~Y

-3 25 9

-k

-Y 26 10

-Y

~Y 11 27

~

12 28

-Y

-Y 13 29

'Y

',f I4 30

'Y

'7 15 31

~~h 16 J

INSTRUCIlONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

50- $5 DOCKET NO.

UNITSHU1 DOWNS AND POWER REDUCDONg UNIT NAME Lon doit L 1

DATE

/%- Er 7 N RE N SY G"ri htirl REPORT MONM4 TELEPMONE 35 t 7% 20W i

~

}.icensee Ew Cause & Corrective

.{I "g

}Ij F{

n's jgr5g Report #

N f

r.

(

5 ac Ewns u

Action to No.

Date Prevent Recurrence 6

9 960 6Y 3

wV e

</

Mn AIR

& & ii,/ g,x -j

^V$ '"*9'-

I I

2 3

4 l

F: Forced Reason:

M**h'd Exhibit G Instructions l

S: Scheduled A Equipment Failure (Explain) t-Manual I"' P'*Paration of Data B-Maintenance of Test 2-Manual scran Entry sheets for Licensee

c. Refueling 3-Aute seram Event ReporI(LER) File (NUREG-D-Ragulatory Restriction 4-continued 0161)

E4perator Training & IJeanse Examination f_l*U*d'**d F Administrattw 5

G4perational Error (Explain)

Exhibit I Same Source i

- 19/77)

Hether(Explain)

50-295 DOCKETNO.

UNITSMUTDOWNS AND POWER REDUCDONg INTMAl0E Lon (10it 1.

l DATE

/%~ Ef 7 REPORT 900NTil Re 000ft21ED sy Csceri Aeart TELEP900NE 3n 74920tf4 l

4 l

3

}.icensee g,

Cause & Correcttw

}Q

.{ ~I g

gg Ewas aj Action so i

No.

Date k

i d

a'l jdi g R8Purt #

Au fO Prewna Recurrence F

]

)

6 i

f Sd> O9OY

]

'7W 0

Y W

Y 5hlld lN ~

Y W#Y

  • I I

i 1

1 i

I i

i 2

3 4

*

  • d i

F: Forced Reason:

Exhibit G. Instructions l

S: Scheduled A Equipment Failure (Emplain) s.n.nvat for Preparation of Data N of Test 2-Manual seram Entry Sheets for Licensee i

C Refueling 3-Au4e Scras Ewnt Report (LER) File (NUREG-D Regniatory Restriction 4-centinued 0161) l E4perator Training & IJcense Esamination j"$8'dL**d F.Administrathe 5

i G4perational Error (Emplain)

Exhibit 1 Some Source

- P8/77)

H4ther(Emplain) 4

OPERATING DATA REPORT N'

DOCKET NO.

DATE N "8 7 COMPLETED BY GhuSho-TELEPHONE MN OPERATING STATUS

1. Unit Name:
2. Reporting Pened. m /:2 a ano to #4 n_5/ 2Voo MO
3. Licensed Thennal Power (MWt):

/OM

4. Nansepiste Rating (Gross MWe):

/oVD

5. Design Electrkal Rating (Net MWe):

/oF5

6. Maxhaum Dependable Capacity (Gross MWe):
7. Maxhaum Dependable Capacity (Net MWe):

/No

8. If Changse Occur in Capacity Ratings (Items Number 311mough 7) Since Last Report. Give Reasons:

A/4

^/8

9. Power Level To Which Restricted. lf Any (Net MWe):

AIA

10. Reseoes For Restrictions.lf Any:

This Month Yr to.Dete Cumulative I

'7VV O E700'O

/d'/ 689.d

11. Hours la RePerting Period

- 12. Number Of House Reactor Was Cb 7 9 9. O 7733.5 79 Ao 2.O

13. Reactor Reserw shutdown Hours OO O. O

'226. /

14. Hours Generator On Line 7W. O Z372 O 7/o 97 F. 7
15. Unit Reserw Shutdown Hour.

D. O O. O O. O

16. Gross Thwusal Emergy Generated (MWH)
  1. Yeo4/5 -

JQ,946,29/

.79163F, 7E

17. Gross Electrical Energy Generated (MWH) 79&554 7 64F,76/a 4f.7(/R</.$o
18. Not Electrical Easrgy Genessted (MWW) 748 Wo?

7 334' V37

/ef d)fff/

19. Unit Servies Facter

/do, o fy,R.

72 5

20. Unit Availability Factor

/oo o

/9. 2 7/,5

21. Unit Capacity Factor (Using MDC Net) 99.3 86.5

/A 7

22. Unit Capacity Factor (Using DER Net) 99 3 Fo.5

/47

23. Unk Forced Outage Rate
6. O
4. 5

/5. C

24. Shutdowns Scheduled Over Next 6 Months (Type. Pate,and Duration of Eschi:
25. If 5 hut Down At End Of Report Period. Estimated Date of Startup:
26. Units la Test Seetus (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/77) i

AVERAGE DAILY UNIT POWER LEVEL IO~M DOCKET NO.

'O^I YAllb $

UNIT DATE COMPLETED BY

/5 5 nob TELEPHONE MONTH I[ M N

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(Mwe. Net)

/0.36

/03 1,

s

/05h

/05D 18 2

/d33

/ 3/

19 3

/OE

/O b 20 4

/O32 21 5

/03hl

/032 22 s

lbbb l0bl 23 7

/032

/D35 2<

s

/633

'lbb3 25 9

/633

/05Y 26 10 ON

/ 31 27 II

/O33

/O33 28 12 l03Y

/ 05 1 19 13

/O31

/O3[

30 I4

!O3d

/ 3d 31 15 lb3Y l6 l

INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

__=.

l I

5d'3 00CERTNO.

UNITSHUTDOWNS AND POWER REDUCDONg UfGT NARGE 2/ #^/ d M t' J.

DATE

/% -87 REPORTDIONTII

~ # r r m /2t p Cotel2TED BY Grd &G, TELEPIIONE 3/2*74 2aFV l

4 i

I 3

.gI

  • gg

'u.ensee g

L ca a Cw,ecilw i

~

} s as Ewat j

Action to No.

Dese I-

)

N k

al jdg R8Pwt #

y Prewns Rosweence 3

6 M LUOY. 00 3 Of Q)171$

orpaoer adueboos e/uh l

$0/)Y

  • i I

i l

i i

l 1

i 2

3 4

Ma*d F: Forced Reason:

Exhibit G-lestructions l

5: Scheduled A Equipnesat Falkne(Emplain) s.pganual rw Preparation of Dess 3.pdsintenanos of Test 2-Manuel scram Entry Sheets for Licensee C-Refueling 3-Auto seram Ewas Repwt (LER) File (NUREG-ter Usense Emanninesion F Adaginistrattw 5

t G4perational Ertw(Explain)

Exteit I Sanie Sowce 19/77)

Hether(Emplain) i

F

'a DECEMBER MAJOR SAFETY RELATED MAINTENANCE Eauipment Name Work Performed 1A Residual Heat Removal Removed old valve and Relief Valve replaced with new valve.

1B Residual heat Removal Replace Seal Pump 18 Main. Steam Isol.

Reconnected operator, Valve Drain valve remove limitorque motor and valve.

Reinstall new valve and motor.

Loop Drain Line Isol. Valve Reconnected or.erator and replace broken seal, removed limitorque rnotor and valve. Reinstall new motor and valve.

i 4

i 1109t 0591A

Unit 1 - Answers 1.

Zion Unit 1 2.

In current refueling outage since September 4, 1986. Next refueling outage scheduled to begin December 3', 1987.

4_

3.

February 11, 1987 is the scheduled date for initial criticality following refueling.

4.

Technical Specification changes are required to permit tube sleeving as a method of steam generator repair. A reload safety evaluation review took place April 1,1986 and identified no unreviewed safety questions.

However, because the current cycle has run longer than assumed in the reload analysis, a second reload safety review was held in December to discuss the changes. The station On site Review is held after the reload safety review.

5.

The onsite approval of the sleeving Tech. Spec. change is still pending.

6.

None 7.

The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool from Zion Unit 1 is 556.

8.

The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 2112 fuel _ assemblies.

The installation of the new storage racks has been completed.

9.

In 1995, Zion Station will lose full core discharge capability. This date is based on a December, 1985 study.

t Page 2 of 3 1109t 0591A

i

\\

Unit 2 - Answers 1.

Zion Unit 2 2.

March 5, 1987 is the scheduled date for the next refuelir.g outage.

3.

June 4,1987 is the approximate date for initial criticality after refueling.

4.

No Technical Specification changes have been identified. A reload safety evaluation review was held in December 1986. The station On site Review is held after the reload safety review.

5.

None 6.

None.

7.

The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool from Zion Unit 2 is 512.

8.

The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies. The installation of the new storage racks has been completed.

9.

In 1995, Zion Station will lose full core discharge capability. This date is based on a December,1985 study.

t J

Page 3 of 3 1109t 0591A

'e DECEMBER

SUMMARY

OF OPERATING EXPERIENCE UNIT 1 The unit entered.the reporting period off-line for the Continuation of Cycle IX, X Refueling Outage. The unit remained off-line the entire month.

Unit 2 The unit. entered the reporting period at a power level of 1080 NWe (99%

reactor power). The unit remained on line the entire reporting period ending at a power level of 1075 MWe (99% reactor power) and having an availability factor of 100%.

l l

l 4

l 1109t 0591A l

es 1.

REFUELING INFORMATION REQUEST

~

Questions:

1.

Name of facility.

2.

Scheduled date for next refueling shutdown.

4 3.

Scheduled date for restart following refueling.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

-If answer is.yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

5.

Scheduled date (s) for submitting proposed licensing action and supporting information, i

6.

Important licensing considerations associated with refueling, e.g., new or dif ferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

8.

The present licensed spent fuel pool storage capacity and the-size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

4-Page 1 of 3 1109t 0591A

i Commonw:rith Edi:on Zion G:n:rr. ting Station 101 Shiloh Blvd.

Zion, Illinois 60099 Telephone 312/746-2084 January 6, 1987 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir,

Enclosed please find the Operating Status Report for the month of December, 1986 for Zion Generating Station.

Sincerel

ours, J

Pliml Sta ion Manager Zion Station G.TP/GLA/rmm Enclosure cc:

D.

P.

Galle J.

G.

Keppler (NRC)

L.

D.

Butterfield H.

E.

Bliss INPO L.

J.

Anastasia Divison of Env. Health State of Illinois Tech Staff File Director, Office of Inspection and Enforcement

((0f h