Georgia Pbwer Company Post Office Box 282 Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Cornpany Services, Inc.
Post Office Box 2625 b
Birmingham, Alab ma 35202 reiennone 205 870-e "
Vogtle Project August 5, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Mr. B. J. Youngblood Log:
GN-1029 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 REF: BAILEY TO DENTON, GN-978, 7/2/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 43: TMI ITEM III.D.l.1
Dear Mr. Denton:
Pursuant to the telephone request by your staff on July 24, 1986 the following change to item 5 of the attachment to the referenced letter is submitted:
Item 5:
Provide a plan for report-*ng leak rate testing results to the NRC.
Response: During the power ascension test phase, prior to achieving 5 percent rated thermal power, all the leakage assessment procedures will be performed to collect system baseline leakrate data. This data will be included in a report to the NRC 90 days after the final leak rate test is completed. Af ter commercial operation, a copy of the leakage assessment test results will be forwarded to the NRC as a Special Report. This report would be sent to the NRC at the end of the refueling outage in which the testing takes place.
Items 1 through 4 of the' referenced letter attachment are not affected by this submittal.
If your staff requires any additional information, please do not hesitate to contact me.
Sincerely, e
J. A. Bailey I
Project Licensing Manager 01 ko 1
B608130305 860005 PDR ADCCK 05000424 E
. o Director of Nuclear Reactor Regulation File: X7BC35 August 5, 1986 Log:
GN-1029 Page 2 JAB /sm xc:
R. E. Conway R. A. Thomas J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller (2)
B. Jones, Esquire G. Bockhold, Jr.
NRC Regional Administrator NRC Resident Inspector D. C. Teper W. C. Ramsey L. T. Gucwa Vogtle Project File 0638V i
_