Forwards Insp Rept 50-341/97-13 on 970811-0922 & Nov. Improvements Were Noted in Conduct of Plant Operations Due to Effective Implementation of Operational Excellence Plan
ML20212F406
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/27/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20212F411 List:
References
50-341-97-13, EA-97-201, EA-97-242, NUDOCS 9711040276
Download: ML20212F406 (4)


See also: IR 05000341/1997013

Text

'"

  1. "'49

UNn ED STATES

$$,

NUCLEAR RE20LATORY COMMISSION

.

S

REGION til

S

4j

801 WARRENVILLE HoAD

f

I

/

\\

l~

UsLE. ILUNolS 6o532-4351

.....

October 27, 1997

.

EA 97 201

EA 97 242

-

Mr. D. R. Gipson

Senior Vice President

Nuclear Generation

The Detroit Edison Company

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: NRC NOTICE OF VIOLATION AND INSPECTION REPORT NO. 50-341/97013

Dear Mr. Gipson:

.

On September 22,1997, the NRC completed an inspection at your Fermi 2 reactor facility. The

enclosed report presents the results of that inspection.

During the 5 week period covered by this inspection period, improvements were noted in the

conduct of plant operations due to effective implementation of the Operational Excellence Plan.

The results of self assessment activities by your quality assurance department were similar to

the results of our inspection activities regarding the effectiveness of performance improvernent

initiatives associated with the Operational Excellence Plan. Also during this period, adverse

trends in personnel errors during the conduct of work activities and equipment deficiencies

associated with solenoid valves were identified. You promptly recognized these problems and

took immediate corrective actions, in contrast, corrective actions to address Reactor Core

isolation Cooling system oilleaks identified during surveillance testing were not promptly

implemented, resulting in the unnecessaryinoperability of this Engineered Safety Feature system

for three days.

Based on the tesults of the August 6,1997, Pre-decisional Enforcement Conference, the NRC

has determined that a violation of NRC requirements occurred. The violation is cited in the

enclosed Notice of Violation (Notice) and the circumstances surrounding it are described in detail

'in Inspection Report No. 50-341/97002. Your staff failed to follow the requirements of the

corrective action program for documenting and reporting this type of issue promptly. By not

documenting this issue in a Deviation Event Report, the significance was not promptly evaluated,

nor was management aware of the issue until the NRC became involved much later, We

determined that your staffs corrective actions were adequate to prevent recurrence and tMt

escalated enforcement action was not appropriate for this issue. We are therefore issuing a

Notice for a Severity Level IV violatio.n for failure to follow procedures.

b

QL

9711040276 971027'

<-

PD*R

ADOCK 05000341

alililiggsp

=

_

..

.

.

. . .

..

.

..

..

__

_ - __ _ _

p'

l

l

!

D. R. Gipson

2-

r

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necassary to ensure compliance with regulatory

requirements.

,

In accordance with 10 CFR Part 2.790 of the NRC's * Rules of Practice," a copy of this letter and

its enclosures, and your response, will be placed in the NRC Public Document Room.

~

Sincerely,

6'1f

W

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50 341

License No. NPF 43

Enclosures:

1. Notice of Violation

,

2. Inspection Report No. 50-341/97013(DRP)

cc w/encis:

N. Peterson,

Licensing Director

P. A. Marquardt, Corporate

Legal Department

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Monroe County, Emergency

Management Division

.

w -

_ _ _ _ _ _ _ _ __ _ _ _ _ _ _ - _ _

_______ -____-____--__ - __ __-___ __ _ _ _ _ _-_

V

6

,

D. R. Gipson

2-

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

i

determine whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures, and your response, will be placed in the NRC Public Document Room.

b

- Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

3

Division of Reactor Projects

Docket No. 50 341

License No. NPF 43

Enclosures:

1. Notice of Violation

2. Inspection Report No. 50-341/97013(DRP)

cc w/encis:

N. Peterson,

Licensing Director

P. A. Marquardt, Corporate

Legal Department

James R. Padgett, Michigan Public

- Service Commission

Michigan Department of

Environmental Quality

Monroe County, Emergency

Management Division

Docket File w/encls

Project Manager, NRR w/enets

'

PUBLIC IE-01 w/encls

DRP w/encls

OC/LFDCB w/encls

Rlli PRR w/encls

~ SRI Fermi w/encls

A. B. Beach w/encls

Rill Enf Coordinator w/encls

Deputy RA w/encls

CAA1 w/encls (E Mail)

TSS w/encls

DRS w/encls (2) .

DOCDESK(E mail)

.

J. Lieberman, OE w/encls

R. Zimmerman, NRR w/encls

J. Goldberg, OGC w/encls

. De .umentf R:\\insprpts\\ powers \\ferm\\fer97013.drp

To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci "E"

= Copy with attach /enct "N" = No copy

OFFICE

Rlli

Rlli

Rlli

Rlli

Rlli

NAME

DuPont:dp

Leach Sec 05.1

Gardner

Jordan

Grant /

s

Sec E2.2,

E2.3

DATE

10/ /97

10/ /97

10/ /97

10/ /97

10 4 7

OFFICIAL RECORD COPY

i

i

..

T*r'-

g

e-v

s

v.

-m

.

,,,e

-

f-.-

.w

i*-

w

-pm

y

g-

g

p.i

>r7--t i sp yr--r?-

.

,e

A

D. R. Gipson

2-

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice " a copy of this letter and its

enclosures, and your response, will be placed in the NRC Public Document Room.

Sincerely,

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50-341

License No. NPF-43

Enclosures:

1. Notice of Violation

2. Inspection Report No. 50-341/97013(DRP)

cc w/encts:

N. Peterson,

Supervisor of Compliance

P. A. Marquardt, Corporate

Legal Department

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Monroe County, Emergency

Management Division

Docket File w/encls

Project Manager, NRR w/encls

PUBLIC IE-01 w/encls

DRP w/encls

OC/LFDCB w/encls

Rlli PRR w/encls

SRI Fermi w/encls

A. B. Beach w/encls

Rill Enf Coordinator w/encls

Deputy RA w/encls

CAA1 w/encls (E-Mail)

TSS w/encis-

DRS w/encls (2)-

DOCDESK (E mail)

J. Lieberman, OE w/encls

R. Zimmerman, NRR w/encls

- J. Goldberg, OGC w/encls

Document: R:\\insprpts\\ powers \\ferm\\fer97013.drp

To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci "E"

= Copy with attach /enci "N" = No copy

N

OFFICE

Rlll

Rlli

Rlli

Rlll

Rlli

NAME

DuPon-)

Leach Sec 05.1

Gardner

Jor

-

Grant /Dapas

3

'

DATE

10/i/97

10/f/97

10$/97

10$9 L 10/ /97

OFFICIAL RECORD COPY

_ _ _ _ _ _