Text
'"
- "'49
UNn ED STATES
$$,
NUCLEAR RE20LATORY COMMISSION
.
S
REGION til
S
4j
801 WARRENVILLE HoAD
f
I
/
\\
l~
UsLE. ILUNolS 6o532-4351
.....
October 27, 1997
.
EA 97 201
EA 97 242
-
Mr. D. R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT: NRC NOTICE OF VIOLATION AND INSPECTION REPORT NO. 50-341/97013
Dear Mr. Gipson:
.
On September 22,1997, the NRC completed an inspection at your Fermi 2 reactor facility. The
enclosed report presents the results of that inspection.
During the 5 week period covered by this inspection period, improvements were noted in the
conduct of plant operations due to effective implementation of the Operational Excellence Plan.
The results of self assessment activities by your quality assurance department were similar to
the results of our inspection activities regarding the effectiveness of performance improvernent
initiatives associated with the Operational Excellence Plan. Also during this period, adverse
trends in personnel errors during the conduct of work activities and equipment deficiencies
associated with solenoid valves were identified. You promptly recognized these problems and
took immediate corrective actions, in contrast, corrective actions to address Reactor Core
isolation Cooling system oilleaks identified during surveillance testing were not promptly
implemented, resulting in the unnecessaryinoperability of this Engineered Safety Feature system
for three days.
Based on the tesults of the August 6,1997, Pre-decisional Enforcement Conference, the NRC
has determined that a violation of NRC requirements occurred. The violation is cited in the
enclosed Notice of Violation (Notice) and the circumstances surrounding it are described in detail
'in Inspection Report No. 50-341/97002. Your staff failed to follow the requirements of the
corrective action program for documenting and reporting this type of issue promptly. By not
documenting this issue in a Deviation Event Report, the significance was not promptly evaluated,
nor was management aware of the issue until the NRC became involved much later, We
determined that your staffs corrective actions were adequate to prevent recurrence and tMt
escalated enforcement action was not appropriate for this issue. We are therefore issuing a
Notice for a Severity Level IV violatio.n for failure to follow procedures.
b
QL
9711040276 971027'
<-
PD*R
ADOCK 05000341
alililiggsp
=
_
..
.
.
. . .
..
.
..
..
__
_ - __ _ _
p'
l
l
!
D. R. Gipson
2-
r
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necassary to ensure compliance with regulatory
requirements.
,
In accordance with 10 CFR Part 2.790 of the NRC's * Rules of Practice," a copy of this letter and
its enclosures, and your response, will be placed in the NRC Public Document Room.
~
Sincerely,
6'1f
W
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No. 50 341
License No. NPF 43
Enclosures:
,
2. Inspection Report No. 50-341/97013(DRP)
cc w/encis:
N. Peterson,
Licensing Director
P. A. Marquardt, Corporate
Legal Department
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Environmental Quality
Monroe County, Emergency
Management Division
.
w -
_ _ _ _ _ _ _ _ __ _ _ _ _ _ _ - _ _
_______ -____-____--__ - __ __-___ __ _ _ _ _ _-_
V
6
,
D. R. Gipson
2-
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
i
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures, and your response, will be placed in the NRC Public Document Room.
b
- Sincerely,
/s/ Marc L. Dapas for
Geoffrey E. Grant, Director
3
Division of Reactor Projects
Docket No. 50 341
License No. NPF 43
Enclosures:
2. Inspection Report No. 50-341/97013(DRP)
cc w/encis:
N. Peterson,
Licensing Director
P. A. Marquardt, Corporate
Legal Department
James R. Padgett, Michigan Public
- Service Commission
Michigan Department of
Environmental Quality
Monroe County, Emergency
Management Division
Docket File w/encls
Project Manager, NRR w/enets
'
PUBLIC IE-01 w/encls
DRP w/encls
OC/LFDCB w/encls
Rlli PRR w/encls
~ SRI Fermi w/encls
A. B. Beach w/encls
Rill Enf Coordinator w/encls
Deputy RA w/encls
CAA1 w/encls (E Mail)
TSS w/encls
DRS w/encls (2) .
DOCDESK(E mail)
.
J. Lieberman, OE w/encls
R. Zimmerman, NRR w/encls
J. Goldberg, OGC w/encls
. De .umentf R:\\insprpts\\ powers \\ferm\\fer97013.drp
To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci "E"
= Copy with attach /enct "N" = No copy
OFFICE
Rlli
Rlli
Rlli
Rlli
Rlli
NAME
DuPont:dp
Leach Sec 05.1
Gardner
Jordan
Grant /
s
Sec E2.2,
E2.3
DATE
10/ /97
10/ /97
10/ /97
10/ /97
10 4 7
OFFICIAL RECORD COPY
i
i
..
T*r'-
g
e-v
s
v.
-m
.
,,,e
-
f-.-
.w
i*-
w
-pm
y
g-
g
p.i
>r7--t i sp yr--r?-
.
,e
A
D. R. Gipson
2-
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice " a copy of this letter and its
enclosures, and your response, will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No. 50-341
License No. NPF-43
Enclosures:
2. Inspection Report No. 50-341/97013(DRP)
cc w/encts:
N. Peterson,
Supervisor of Compliance
P. A. Marquardt, Corporate
Legal Department
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Environmental Quality
Monroe County, Emergency
Management Division
Docket File w/encls
Project Manager, NRR w/encls
PUBLIC IE-01 w/encls
DRP w/encls
OC/LFDCB w/encls
Rlli PRR w/encls
SRI Fermi w/encls
A. B. Beach w/encls
Rill Enf Coordinator w/encls
Deputy RA w/encls
CAA1 w/encls (E-Mail)
TSS w/encis-
DRS w/encls (2)-
DOCDESK (E mail)
J. Lieberman, OE w/encls
R. Zimmerman, NRR w/encls
- J. Goldberg, OGC w/encls
Document: R:\\insprpts\\ powers \\ferm\\fer97013.drp
To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci "E"
= Copy with attach /enci "N" = No copy
N
OFFICE
Rlll
Rlli
Rlli
Rlll
Rlli
NAME
DuPon-)
Leach Sec 05.1
Gardner
Jor
-
Grant /Dapas
3
'
DATE
10/i/97
10/f/97
10$/97
10$9 L 10/ /97
OFFICIAL RECORD COPY
_ _ _ _ _ _