ML20212F344
| ML20212F344 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/23/1997 |
| From: | Alexion T NRC (Affiliation Not Assigned) |
| To: | Clifford J NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9711040261 | |
| Download: ML20212F344 (5) | |
Text
_ _ _ _ _ - _ _ _ - _ - _ - _ - _ - _ -
October 23, 1997 MEMORANDUM 10: James W. Clifford, Acting Director-1 Project Dircctorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation ORIGINAL SIGNED BY FROM:
Thomas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
SUBJECT:
MEETING WITH HOUSTON LIGHTING & POWER I
DATE & TIME:
Wednesday, November 5, 1997 8:00 a.m. - 10:00 a.m.
j LOCATION:
U.S. Nuclear Regulatory Commission Two White Flint North j
1 11555 Rockville Pike, Room T-7Al Rockville, Maryland PURPOSE:
The licensee will update the staff on their plans for steam generator replacement at South Texas Project, Unit 1.
Agenda i
is attached.
1 PARTICIPANTS:* EC UTILITY J. Tsao-M. McBurnett, et al.
M. Shuaibi J. Rajan M. Hartzman l
C. Hinson
)
i B. Thomas L. Campbell
{
T. Alexion, et'al.
~
Docket Nos.-50-498 and F9-499
~
'cc: See neEt page
(
l e
' CONTACT: Tom Alexion 301-415-1326
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" b9 Federal Reaister 48340,9/20/94.
DISTRIBUTION:
See next page
)\\
Document Name:
STPil597.MTR OFC PM/P d I
NAME TAlexiN DATE 10/ %S 97 Mnp PiC PDF"M (["ffi ddM iEw du~="
COPY
[YET)fN0 0FFICIAL W CORD COPY ff N %=
II. l.lli II,ll.ll ll w
.- _ _ ~ ~ _
pa aeco O
UNITED STATES y
c s
NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20066 4 001 y
October 23, 1997 MEMORANDUM TO: James W. Clifford, Acting Director t
Project Directorate IV-I Division of Reactor Projects III/IV f, Office of Nuclear Reactor Regulation FRON:
omas W. Alexion, Project Manager 4
roject Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
SUBJECT:
MEETING WITH HOUSTON LIGHTIhG & POWER DATE A TIME:
Wednesday, November 5, 1997 8:00 a.m. - 10:00 a.m.
LOCATION:
U.S. Nuclear Regulatory Commission Two White Flint North 11555 Rockville Pike, Room T-7Al Rockville, Maryland PURPOSE:
The licensee will update the staff on their plans for steam j
generator replacement at South Texas Project, Unit 1.
Agenda is attached.
4 PARTICIPANTS:* EG UTILITY J. Tsao M. McBurnett, et al.
M. Shuaibi J. Rajan M. Hartzman C. Hinson B. Thomas L. Campbell T. Alexion, et al.
Docket Nos. 50-498 and 50-499 cc: See next page CONTACT: Tom Alexion 301-415-1326
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.
i 1
L
.1l:
T"T l
~
~
I Houston Lighting & Power Company South Texas, Units 1 & 2 cc:
Mr. David P. Loveless Jack R. Newman, Esq.
I Senior Resident Inspector Morgan, Lewis & Bockius U.S. Nuclear Regulatory Comission 1800 M Street, N.W.
P. O. Box 910 Washington, DC 20036-5869 Bay City, TX 77414 Mr. Lawrence E. Martin Mr. J. C. Lanier/M. B. Lee General Manager, Nuclear Assurance Licensing City of Austin Houston Lighting and Power Company Electric Utility Department P. O. Box 289 721 Barton Springs Road Wadsworth, TX 77483 Austin, TX 78704 Rufus S. Scott Mr.-M. T. Hardt Associate General Counsel Mr. W. C. Gunst Houston Lighting and Power Company City Public Service Board P. O. Box 61867 P. O. Box 1771 Houston, TX 77208 San Antonio, TX 78296 Joseph R. Egan, Esq.
Mr. G. E. Vaughn/C. A. Johnson Egan & Associates, P.C.
Central Power and Light Company 2300 N Street, N.W.
P. O. Box 289 Washington, DC 20037 Mail Code: N5012 Wadsworth, TX 74483 Office of the Governor ATTN:
Andy Barrett, Director INP0 Environmental Policy Records Center P. O. Box 12428 700 Galleria Parkway Austin, TX 78711 Atlanta, GA 30339-3064 Arthur C. Tate, Director Regional Administrator, Region IV Division of Compliance & Inspection U.S. Nuclear Regulatory Commission Bureau of Radiation Control 611 Ryan Plaza Drive, Suite 400 Texas Department of Health Arlington, TX 76011 1100 West 49th Street Austin, TX 78756
.Dr. Bertram Wolfe 15453 Via Vaquero Texas Public Utility Commissica Monte Sereno, CA 95030 ATTN: Mr. Glenn W. Dishong 7800 Shoal Creek Blvd.
Judge, Matagorda County Suite 400N Matagorda County Courthouse Austin, TX 78757-1024 1700 Seventh Street Bay City, TX 77414 Mr. William T. Cottle Executive VP & General Manager Nuclear Houston Lighting & Power Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483 m
m-m
4 tieetino Notice for Meetino dated I
Hard Cooy Docket File PUBLIC-PD4-1 r/f OGC-ACRS TAlexion Receptionist (OWFN and TWFN)
E-Mail S. Collins R. Zimmerm/F. Miraglia (SJC1/FJM) an (RPZ)
E. Adensam J. Clifford(EGAl)
(JWC)
T. Alexion (TWA)
C. llawes (CMH2)
B. Sheron (e-mail to SLM3)
J. Tsao (JCT)
M. Shuaibi (MAS 4)
J. Rajan (JRR)
M. Hartzman (MXH)
C. Hinson
- 8. Thomas ((CSH)
BET)
L. Campbell (LLC 3)
T. Gwynn (TPG), RIV T. Hiltz (TGH)
B. Henderson (GWH), RIV PMNS
?
Y
- s
+:
h
i AGENDA FOR SOUTH TEXAS PROJECT 11/05/97 SG BRIEFING Introduction replacement outage schedule; critical path Questions Generated During Last Briefing reanalysis results to address increased replacement SG mass Unit I tube degradation pitch diagram; broached TSP; other Delta 94 basics RCP Piping and Supports brief overview of methodology summary; describe scope of work (cut
& replace) with sketches / diagrams; temporary support design and
'50.59; cutting / welding /templating design and 50.59; support removal / replacement design and 50.59 Large Bore Secc.
.y Systems show original and new FW/AF piping routing; discuss results of pipe analyses, number and configuration of new supports, and qualification of existing supports; describe sequencing of installation; baseplates (IRE 08), piping and supports (1RE09);
discuss main steam pipe stress analysis and pipe support loads, i
Pressure / Temperature Analysis Results Non-LOCA Analysis - _
j brief description of what was analyzed and what was evaluated; discuss results with respect to meeting acceptance criteria.
Structural Mechanics brief overview of methodology and conclusions for RCS piping &
support stiffness, loop piping analysis, primary loop support 1
analysis, primary equipment nozzle load evaluation, and primary -
loop leak-before-break reconciliation.
NSSS/ BOP Systems Evaluations
.brief overview of ' methodology and conclusions.
Reactor Coolant Pump Evaluation brief overview of methodology and conclusions of BHP and axial thrust load analysis, RCP pressure boundary components evaluation, r
j and control rod drive mechanism pressure boundary components evaluation.
f-A l
e
,, ~,,
. ~,- :
~,L
.,,,,,..ni,
,,..~,,.,