ML20212F291
| ML20212F291 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/20/1997 |
| From: | Skinner P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mccoy C SOUTHERN NUCLEAR OPERATING CO. |
| Shared Package | |
| ML20212F296 | List: |
| References | |
| 50-424-97-09, 50-424-97-9, 50-425-97-09, 50-425-97-9, NUDOCS 9711040252 | |
| Download: ML20212F291 (6) | |
See also: IR 05000424/1997009
Text
_ _ _ - _ _ _ _ _
m .-
4'
J
.,7
October 20,.
1997
Southern Nuclear Operating Company, Inc.
ATTN:
Mr.-C. K. McCoy
Vice President
-Vogtle Electric' Generating Plant
P. O. Box 1295
' Birmingham. AL -35201
SUBJECT:
NRC-INTEGRATED--INSPECTION REPORT 50-424/97-09. 50 425/97-09 AND
-Dea _r Mr. McCoy:
On September 20. 1997, the NRC completed an inspection at your Vogtle Units 1
and 2 reactor' facilities.
The enclosed report presents the results of that
-inspection.
-
During-the seven-week period. your conduct of activities at the Vogtle
facility was generally characterized by safety-conscious operations, sound
engineering and maintenance practices, and appropriate radiological work
' controls.
However, three violations were identified. The first violation dealt with
corrective maintenance performed on a safety-related piece of equipment
without a proper work order.
The second violation was for-a failure of
security personnel to conduct a. search of materials prior to entry into a
vital area. The third violation was in the area of- fire )rotection. We are
concerned with-the violation concerning fire protection w11ch may indicate a
decline in performance in this area.
' The violations are cited in the enclosed Notice of Violation (Notice), and the -
circumstances surrounding the violations are described in detail in the
enclosed report.
Please note that you are required to respond _to this letter
and should follow the _ instructions specified in the enclosed Notice when
preparing your response.
The NRC will use your response, in part, to
t
determine whether further enforcement action is necessary to ensure complia1ce
with regulatory requirements.
-
9711040252 971020
ADOCK 05000424
e
I
lllE ElEllljl(lllIllllll
\\
L
.
.
-
M
_ _ _ _
._
.,
i: ,,
,
??;
_SNC
2
- In accordance with:10 CFR 2.790 of the NRC's-" Rules of Practice." a copy of
this letter. its enclosures. andlany reply will be placed in the NRC Public
-Document Room.
S.incerely,
(Original signed by Pierce H. Skinner)
'
Pierce H. Skinner. Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50-424 and 50-425
License Nos.-NPF-68 and NPF-81
-
< Enclosure:::
1.
2.
NRC Integrated Inspection Report
-50-424/97-09, 50-425/97-09-
,,
a
\\
.h,
ih
m er
,, we .1
A #'
onm) \\' u
dLa
o n-
on.m
!
SIGNATURE
d
-
NAME
RFCar 10n:dka
M Widmann
KF0'Donohue
TRFarlholt2-
GBruzo
'
HL atten
'DATE
10 /
/ 97
10 /
! 97
10 /
/ 97
10 /
/ 97
to /
97
10 /:FO / 97
COPY 7
YES
NO -
VES
NO
YES
NO
VES
NO
k YES)
NO
VES
NO
urt iCIAL htuAi> UJFY
UUCtMtNi NAMt: A;\\vuiuvliR.0H
I
_
_ _ _ - _ _ _ _ _ . . _ _ _ _ _ _
l
OCT-20-19W 17i11
UStRC VOGTLE
i .'?O6 554 9548
P.02
,
ll
'
'
2
In accordance with 10 CFR 2.790 of the NRC's ' Rules of Practice." a copy of
this letter, its enclosures, and any reply will be placed in the NRC Public
Document Room.
Sincerely.
Pierce H. Skinner. Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50 424 and 50-425
License Nos. NPF-68 and NPF-81
Erclosures:
1.
2.
NRC Integrated Inspection Report
50 424/97 09, 50-425/97-09
f#ffff
Af f M9
ttt1 DRA
Rf f *fl9
Rf f M8
R'l- fAs
B?? MS
s!EhATURE
w
RMaerton sta
W 0encrue
TFarmolta
Gera20
MLWhitener
s , w
, .,
, , ,
, ,,
,, ,
, ,,
, , ,
, , ,
,, ,-
, ,,
-,
,. ,
, . ,
com
us
e
'vtr
ho
vis
e
vrs
e
its
no
vis
e
GFh444 Hr.LUKU CiFT
UULUMthi MAP.
A;WU/ JW11R.0F I
TOTAL P.02
l
.
.
_ _ - _ _ _ _ _ _ _ _ _ - _ _
_ _ _ - - _ _ _ _ _ - _ - _ - _ . - - _ - _
. . _
.
D
.
30*d.19101
.' ,
-
.3
'
,
ors'rr
att far
its .1a,
art has
e t' nas
att fat
n't .nat
119dM
yy
teWE
WCarHan da
14cm
K20'Omncha
twe%)t2
m an_
MLWiterr_v
et*t
Mi
1 97
1$ /
/F
10 /
/ 97
10 ft ) # 97
13 /
/ 97
to i
tM
cyn
e
e
ns
w
vis
e
ns
2
vts
e
its
e
QFFICIA P.ECORD CQPY
00CG E R W i: A:WD7091!R.JT
i
i
30 'd
LS899PS808
83440s
WU93:ll L6-13-100 '3ft1
a
!
('.
.
.
cc w/encist
J. D. Woodard
Execo ive Vice President
Southern Nuclear Operating Company. Inc.
- P. - D. Box 1295 -
Birmingham. AL 35201-1295
J. B. Beasley
General Manager. Plant Vogtle
Southern Nuclear Operating Company. Inc.
P. O. Box 1600-
Waynesboro, GA 30830
J. A. Bailey
Manager.-Licensing
Southern Nuclear Operatir.g Company. Inc.-
P. O. Box 1295
-Birmingham AL 35201-1295
i
Jim Hurt. Director-
Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King. Jr. Drive
Plaza-Level - East: Suite 356
Atlanta, GA 30334-4600
Office of Planning and Budget
Room 615B
270 Washington Street. SW
..
Atlanta, GA 30334
-Office of the County Commissioner
1
Burke County Commission
Waynesboro. GA 30830-
Harold Reheis. Director
i
Department of Natural Resources
205 Butler Street. SE. Suite 1252
Atlanta, GA 30334
Thomas Hill, Manager
Radioactive Materials Program
-Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
Attorney General
Law Department
132' Judicial Building
Atlanta, GA' 30334
cc w/encls cont'd:
'
_ _ _ _ _ _ _ _ _ _
_
- T
3
.
.
.:
- cc w/encls: Continued
R. D. Barker
Program Manager
4
Fossil & Nuclear Operations
Oglethor>e Power Corporation
2100 E.
Exchange Place
Tucker. GA 30085-1349
Charles A. Patrizia. Esq.
'
Paul. Hastings. Janofsky & Walker
- 10th Floor
1299 Pennsylvania Avenue
Washington D. C.
20004-9500
Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
1470 P.1veredge Parkway NW
Atlanta, GA- 30328-4684
Distribution w/ encl:
P. Skinner. RII ,
R. Carrion. RII
.
. W. P. Kleinsorge RII
!
i
- M. E. Ernstes. RII
L. Wheeler. NRR
PUBLIC
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission-
8805 River Road
Waynesboro. GA 30830
b
.
A-
________.
_