ML20212F281
| ML20212F281 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/17/1987 |
| From: | Noonan V Office of Nuclear Reactor Regulation |
| To: | Grimes B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20210M767 | List: |
| References | |
| NUDOCS 8703050058 | |
| Download: ML20212F281 (1) | |
Text
- ------
Fchruary 17, 1987 Docket Nos.: 50-498 and 50-499 MEMORANDUM FOR:
Brian K. Grimes, Director Division of Ouality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement FROM:
Vincent S. Noonan, Director PWR Pro.iect Directorate No. 5 Division of PWR I.icensing-A
SUBJECT:
RES01.UTION OF l.IVE I.0 ADS ISSUE FROM THE ENGINEERING ASSURANCE PROGRAM FOR THE SOUTH TEXAS PROJECT On September 15, 1986, NRR was requested to resolve with the applicant the issue of whether South Texas Pro. ject was correctly accounting for all the live-load combinations in the structural analysis. Enclosed is the copy of an evaluation by the Engineering Branch, Division of PWR I.icensing-A which indicates that the applicant's analytical procedure is acceptable to NRR. The evaluation will be included with the staffs final assessment of the Engineerino Assurance Program. The applicant is scheduled to submit the final report on the Program on March 31, 1987, it is reauested that the SER on it be transmitted to DPl.-A by May 1, 1987.
/s/
Vincent S. Noonan, Director PWR Pro. ject Directorate No. 5 Division of PWR licensino-A Enclosure as stated:
,D'str'bJtion
- 'si m q ve _,
NRC PDR I.ocal PDR PD#5 Readino File
?.",?*""".s.
r _3.:
&' X.
T
- m.,:.
. N2ydb Prolect Manager M. Rushbrook
- w, y
PD#5 h DIR:PDf5/V PKadambi:ss VSNoona#
?/p/87 2/ / /87 0703050050 070217 PDH ADOCK 05000490 A