MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] |
Text
..
January 7, 1987 Docket No. STN 50-456 DISTRIBUTION 50-457 ,6#
NRC PDR MEMORANDUM FOR: Thomas M. Novak, Acting Director PD#3 Rdgr Division of PWR Licensing-A C. Vogan J. Stevens Frank J. Miraglia, Director S. Varga Division of PWR Licensing-B Robert Bernero, Director Division of BWR Licensing William T. Russell, Director Division of Human Factors Technology Themis Speis, Director Division of Safety Review and Oversight THRU: Steven A. Varga, Director Project Directorate #3 Division of PWR Licensing-A FROM: Janice A. Stevens, Project Manager
! Project Directorate #3 Division of PWR Licensing-A
SUBJECT:
DRAFT NRR SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) REPORT FOR COMMONWEALTH EDIS0N COMPANY'S BRAIDWOOD STATION, UNITS 1 AND 2, FOR DECEMBER 1, 1985 TO NOVEMBER 30, 1986 Enclosed is a draft NRR SALP report for Braidwood Station, Units I and 2, in which Comonwealth Edison Company is rated Category 2 for licensing activities.
This draft report is based partly upon input solicited from selected staff personnel who have had substantial contact and involvement with Commonwealth Edison licensing material. Also enclosed is a sumary of SALP results for the two previous rating pericds.
Please review the draft evaluation and provide any comments you feel appropriate by January 9, 1987. The initial typed draft to the SALP Board is due January 12, 1987; the SALP Board meeting is scheduled for January 30, 1987. The SES Leader
,- for this SALP is Steven A. Varga.
hI
$w Nf
<' 8701090624 870107 PDR ADOCK 05000456 0 PDR _
i
7 P
1 Any specific connents you may have regarding enforcement history, reporting and analysis of reportable events, and plant cleanliness and housekeeping, should be provided.
1 I
Janice A. Stevens, Pro,iect Manager Project Directorate #3 Division of PWR Licensing-A 1
Enclosures:
As stated cc: H. Denton 4
l 4
! I l
I l PD#3 PD#3[' a
. CVogan JStev#ns:mak 1/ 7/87 1 87 l
- 1/ ( /87 l
l l
l l
1 1
i
_ .._ __._I
/ 'o
~,, UNITED STATES
[' g NUCLEAR REGULATORY COMMISSION l
.5 p WASHINGTON, D. C. 20555 1
\...+/
Docket Nos. STN 50-456 _,
and STN 50-457 '-
FACILITY: Braidwood Station Units 1 and ?
LICENSEE: Comonwealth Edison Company EVALUATION PERIOD: December 1, 1985 to November 30, 1986 PROJECT MANAGER: Janice A. Stevens I. INTRODUCTION ,
This report presents the results of an evaluation of the licensee, Commonwealth Edison Company (CECO), in the functional area of licensing activities and other related areas. It provides NRR's input to the SALP review process as described in NPC Manual Chapter 0516. The review covers the period December 1, 1985 to November 30, 1986.
The approach used for this evaluation was in accordance with Office Letter No.
44 which requires that each organization responsible for developing Safety Evaluation Reports also provide a SALP input with their evaluation. Additional inputs were solicited for selected review areas of particular significance. The Project Manager also provided inputs on selected licensing actions. In most cases the staff applied the SALP evaluation criteria for the perfonnance attributes based on first hand experience with the licensee or with the licensee's submittals.
The individual SALP evaluations for each rated licensee issue were assenbled into a matrix which was then used, with appropriate weighting for the importance to safety of the licensing issue, to develop the overall evaluation of the licensee's performance.
I This approach is consistent with. NRC Manual Chapter 0516 which specifies that each functional area evaluated will be assigned a performance category based on a composite of a number of attributes. The single final rating is to be tempered with judgment as to the significance of the individual elements.
II.
SUMMARY
OF RESULTS Based on the apprcach described above, the performance of Ceco in the functional area of licensinq c ctivities is rated Catecory 2.
, III. CRITERIA The evaluation criteria given in NRC Manual Chapter 0516, Table 1, were used.
Weighting to safety.
was used depending upon the individual licensing ac,tions' importance IV. PERFORMANCE ANALYSIS Generally, the licensee's performance was evaluated using the criteria specified in Manual Chapter 0516. There was not sufficient information to allow NRR to evaluate two of the evaluation criteria, enforcement history and reporting and analysis of reportable events.
During the evaluation period there was a significant level of activity.
Substantial effort was expended for the Braidwood OL hearing, which was completed on November 26, 1986.
The hearing for the emergency preparedness contention spanned four days, and the hearing for the contention concerning harassment, intimidation, retaliation and other discrimination spanned 97 days.
A license authorizing fuel loading and precritical testing for Braidwood Unit I was issued on October 17, 1986. The Technical Specifications and two Supplemental SERs were prepared in support of licensing.
A. Management Involvement and Control in Assurino Quality The overall rating for this attribute is 2.
is usually at a level that ensures adequate management review.The The licensee's submittals needed to support licensing of Braidwood Unit I were generally timely, thorough and technically sound. However, certain issues pertaining to fire protection, technical specifications, and the initial test program should have been resolved by the licensee earlier in the review process.
, Therefore, management involvement could be improved.
. B. Approach to Resolution of Technical Issues from a Safety Standpoint The overall uting for this attribute is 2. The licensee understands the technical issues and responses are generally sound and thorough. Conservatism is generally exhibited and approaches are viable. In several instances, the licensee challenged staff positions, but only when it believed safety would not be compromised.
C. Responsive to NRC Initiatives The overall rating for this attribute is 2. In the weeks prior to the issuance of the zero power license for Braidwood Unit 1, the licensee responded to many NRC initiatives in a short period of time. The licensee's responses were generally timely, sound and thorough, however, certain issues should have been resolved by the licensee earlier in the review process.
l l
l
. D. Staffing The overall rating for this attribute is 1. Key positions are clearly identified and responsibilities and authorities are well.. defined for both the plant staff and the licensing department. The security organiza-tion positions and responsibilities are well defined; the security staff is considered to be more than ample to implement the facility physical protection program.
E. Trainino and Qualification Effectiveness The overall rating for this attribute is 1. The licensee has developed a comprehensive Shift Experience Program for Braidwood Station. The program is designed to give senior operators on shift additional supervisory training at an operating PWR. The licensee has an ample number of experienced senior operators to provide on-shift operating experience which satisfies the hot participation requirements of Generic Letter 84-16. .
F. Housekeeping and Control Room Behavior ,_
The overall rating for this attribute is 2. Although housekeeping and control room behavior is discussed elsewhere in the NRC evaluation, NRR has continuing interest in this area since good housekeeping practices are an indication that the licensee takes pride in its facilities. Visits by the Project Manager and discussions with the Resident Inspectors indicate that the licensee's housekeeping practices have improved over this SALP c review period due to increased management attention.
V. CONCLUSIONS
~
Based on our evaluation of licensing activities, an overall rating of 2 is assessed for Comonwealth Edison's licensing performance for the period December 1, 1985 to November 30, 1986.
VI. RECOMMENDATIONS The licensee's best areas of performance were staffing and training and qualification effectiveness. Due to the rapidly approaching low and full power licensing dates for Braidwood Unit 1, the licensee's management should continue to maintain a high level of involvement in licensing activities and should also ensure that plant cleanliness and housekeeping practices continue to improve.
ENCLOSURE 1 v
Previous SALP Cycle Ratings Rating SALP. 4 RatinoSALP 5 SALP 5 l Functional Areas Trend !
A. Plant Operations X NR ---
B. Radiological Controls 2 2 Improved C. Preoperational Testing 2 2 Same D. Fire Protection X NR ---
c E. Emergency Preparedness X 2 ---
F. Security X NR ---
G. Quality Programs and 3 2 Improved Administrative Controls Affecting Quality .
H. Licensing Activities 2 2 Same I. Containment, Safety- 2 2 Same Related Structures, and Major Steel Supports J. Piping Systems 3 2 Improved and Supports i
K. Safety-Related 3 2 Improved Components - Mechanical L. Auxiliary Systems 2 2 Same M. Electrical Equipment 2 2 Same and Cables N. Instrumentation 2 2 Improved O. Braidwood Construction X 1 Improved Assessment Program P. Housekeeping and X 3 Same Equipment Protection X = Not Rated Last Report NR = Not Rated because of lack of activity in the area.
5 l
l
m' i
3 ENCLOSURE 2 SALP INPUTS.
(DECEMBER 1, 1985 - NOVEMBER 30,1986) i I
BRANCH MANAGEMENT APPROACH TO RESPON-REVIEWER LICENSING ACTION INVOLVEMENT RESOLUTION SIVENESS STAFFING TRAINING OVERALL E0B, Romney Reactor Trip System --
1 1 -- --
1 Reliability, 4/21/86 EICSB, Kramer Post-Trip Review, 2 --
2 -- --
2 4/28/86 EICSB, Burrows Charging Pump Dead- --
1 3 -- --
2 heading, 5/6/86 ETCSB, Lasher Review of GL 83-78, --
1 1 -- --
1 Item 2.1, 6/27/86 F08, Samworth Review of FSAR Amend. 1 --
1 -- --
1 47, 8/20/86 PSB, Katze Envir. Effects of 3 3 1 -- --
3 HELB, 8/21/86 PSB, Li Envir. Effects of --
1 1 -- --
1 MSLB, 9/25/86 ,
F08, Hickman Initial Test Program, 2 2 2 -- --
2 9/25/86 F08, Orr, Lapinsky Procedure Gen. Package, 1 1 1 -- --
1 10/2/86 ,
EB, Bagchi Seismic / Dynamic Qual. --
2 1 -- --
2 of Mech. & Elec.
Equip., 10/3/86
G' D a
s .
1 i
BRANCH MANAGEMENT APPROACH TO RESPON-REVIEWER LICENSING ACTION INVOLVEMENT RESOLUTION SIVENESS STAFFING TRAINING OVERALL EB, Johnson, Lee Preservice Inspec., -- ? I -- -- 2 10/7/86 PSB, Singh Fire Protec., 10/8/86 3 2 3 -- --
3 F0B, Hickman Initial Test Program, -- 3 2 -- --- 2 10/10/86 EB, Elliot Eval. of Compliance w/ 1 1 1 2 --
1 4 10 CFR 50.55a(a)(3),
10/15/86 EICSB, Walker Envir. Qual., 10/15/86 --
? 2 -- -- 2 EICSB, Weiss Human Factors Eng., 2 2 2 -- -- 2 10/17/86 RSB, Chatterton Core Physics TS, ? 2 1 -- -- 2 l 10/23/86 NMSS, Skelton Physical Security, 1 2 1 1 --
1 11/10/86 j.