October 23, 1997 Ms. trene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company.
Executive Towers West 111 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE STAFF'S EVALUATION OF THE THIRD 10-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF - ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOP. M94924 AND M94925)
Dear Ms. Johnson:
The staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL) has reviewed and evaluated the information provided by the Commonwealth Edison Company (Comed), in its letter dated March 1,1996. regarding requests for relief (CR 13, Revision 1, and CR 23) from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, requirements for the Zion Nuclear Power Station, Units 1 and 2. Comed provided additional information in its "A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid.(5).Authorization to Use Partial Insp Coverage Requested|letter dated August 13,1997]]. The staff found Comed's request for relief, CR 13, Revicion 1, unacceptable and its evaluation and conclusions will be addressed in separate correspondence.
The staff requires the enclosed additionalinformation to complete its evaluation of Relief Request CR-23.
Sincerely, ORIGINAL SIGNED BY:
Clyde Y. Shiraki, Senior Project Manager Project Directorate lil 2 Division of Reactor Projects -lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-295 and 50 304 gl $ h "E b"[~d b N~ ~' f
~'"
Enclosure:
RAI l ll l.h. l.lI ll DISTRIBUTION:
'O.
? Docket.
PUBLIC PDill-2 r/f ~
. EAdensam RCapra CShiraki-CMoore.
OGC,015818 ACRS, T2E20 MGalloway, Rill-j Li $
f [
v2
. DOCUMENT NAME: G:\\CMNTJR\\ ZION \\Zl94924.RAI To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy (N
AM2/I2 6
D:PD3-2 le OFFICE :
PM:PD3-2 '
NAME CSH'RAKI 6
@DORNE RCAPRA v DATE~
10&f97 104%97 100/97 9711040228 971023 TFICIAL RECORD COPY PDR ADOCK 05000295 i
F PDR
_J
If Octcber 23, 1997
\\
Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 500 Downers Grove, IL 60515 -
SUBJECT:
REQUEST FOR ADDITIONAL 'NFORMATION FOR THE STAFF'S EVALUATION OF THE THIRD 10-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF - ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. M94924 AND M94925)
Dear Ms. Johnson:
The staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL) has reviewed and evaluated the inf ormation provided by the Commonwealth Edison Company (Comed), in its let'.er dated March 1,1996, regarding requests for relief (CR 13, Revision 1, and CR-23) from the American Gociety of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, requirements for the
' Zion Nuclear Power Station, Units 1 and 2. Comed provided additional information in its "A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid.(5).Authorization to Use Partial Insp Coverage Requested|letter dated August 13,1997]]. The staff found Comed's request for relief, CR 13, Revision 1 unacceptable and its evaluation and conclusions will be addressed in separate correspondence.
The staff requires the enclosed additionalinformation to complete its evaluation of Relief Request CR-23.
Sincerely, ORIGINAL SIGNED BY:
Clyde Y. Shiraki, Senior Project Manager Project Directorate 1112 Division of Reactor Projects - til/IV Office of Nuclear Reactor Regulation Docket Nos. 50-295 and 50-304
Enclosure:
RAI cc: See next page DISTRIBUTION:
Docket PUBLIC PDill-2 r/f EAdensam RCapra CShiraki CMoore OGC,015818 ACRS T2E26 MGalloway, Riti l
i DOCUMENT NAME: G:\\CMNTJR\\ ZION \\Zl94924.RAI To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy (N
OFFICE '
PM:PD3-2 D
_A:W2 ti -
D:PD3 2 NAME CSHIRAKI 6 f44DORE RCAPRA v DATE 10&f97 10E497 10c/97 OFFICIAL RECORD COPY l
l L
f* **~%4 UNITED STATES p'
P I et i
NUCLEAR RECULATORY COMMISSION
\\
WASHINGTON, D.C. 300eH001 October 23, 1997 Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West lll
-1400 Opus Place, Su te 050 i
Downers Grove,IL 60515.
i
SUBJECT:
REQUEST FO's ADDITIONAL INFORMATION FOR THE STAFF'S EVALUATION OF THE THIRD 10-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF - ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. M94924 AND M94925)
Dear Ms. Johnson:
The staff, with technical assistance from its contractor, the Idaho National Engineering and -
Environmental Laboratory (INEEL) has reviewed and evaluated the information provided by the
- Commonwealth Edison Company (Comed), in its letter dated March 1,1996, regarding requests for relief (CR 13, Revision 1, and CR 23) from the American Society of Mechanical e
Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, requirements for the Zion Nuclear Power Station, Units 1 and 2. Comed provided additional information in its "A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid.(5).Authorization to Use Partial Insp Coverage Requested|letter dated August 13,1997]]. The staff found Comed's request for relief, CR 13, Revision 1, unacceptable and its evaluation and conclusions will be addressed in separate correspondence.
The staff requires the enclosed additional information to complete its evaluation of Relief
- Request CR 23.
Sincerely, dy.
tyde Y. Shiraki, Senior Project Manager Project Directorate 111-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50 295 and 50 304 4
Enclosure:
RAI cc: See next page 4
e v-."in.e#w..,,
=w
-- - 4.ve ee.e+m 9 mm,.w +
ma, -
g-w.,
-ss-y i-y w
w w.
w
- -.- -..... - ~ _.-- - -
[.
X-
, 1. Johnson
. Zion Nuclear Power Station.
+
Commonwealth Edison Company..
Unit Nos.1 and 2 i
~
- oc
Michael I.- Miller, Esquire r
Sidley and Austin
~ One First National Plaza Chicago, Illinois 60603 or.s Ai u Hing Drector of Research and Development Metropoldan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 i
Mayor of Zion Zion, Illinois 60099 lilinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 4
U.S. Nuclear Regulatory Commission Zion Resident inspectors Office 105 Shiloh Blvd.
Zion, Illinois 60099
' Regional Administrator U.S. NRC, Region lli 801 Warrenville Road Lisle, Illinois 60532-4351
- Station Manager
- Zion Nuclear Power Station
- 101 Shiloh Blvd.
' Zion Illinois 600942797 Document Control Desk-Licensing 4
Commonwealth Edison Company 1400 Opus Place, Suite 400 -
Downers Grove, Illinois 605i5 9.".A%t V i ag.s W md d,JW.4 pm
..sewp e+' Wh 6wp
_...mw
=wy=w a s-
..e y
c m.,,
e..w g, gsqh.
.w. g 3-.
.. -.... - ~
- m. -...
4+-
BEQUEST FOR ADDITIONAL INFORMATION itEQUEST FOR RELIEF CR 23
- Relief Request CR 23: The American Society of Mechanical Engineers (ASME) Boiler and Pressere
-Vessel Code (Code),Section XI Table IWC-25001, Examination Category C-C, items C3.10, C3.20,
.and l':3.30, requires a 100 percent surface examination of integrally wolded attachments to Class 2 vess sis, piping, and pumps, as defined by Figure IWC 2500-5. Pursuant to 10 CFR 50.55a(g)(5)(iii), -
- the licensee requested relief from performing the Code-required surface examination to the extent ;
_ required by the Code.
Commonwealth Edison Company'(Comed) proposed the following as an altemative to the Code
- requirements:
"For those supports with inspection limitations listed in Table CR 23.1, sunce examinations will be performed on the accessible areas and a VT-1 visual examination will be performed on the remaining areas. The limitation will be documented on the surface examination data sheet and the percentage will be recorded in addition to the actual measured weld length for the accessible areas. The limitation will be documented in the ISl summary report and the NIS 1 report.-
"For future inspections, integrally welded attachments with limited accessibility will be subject to the criteria stated above. All suspected limitations will be identified prior to the inspections and will be verified during the inspections. The verified limitations will then be identified in the ISI Program and will be categorized separately for future inspections."
The Code requires a 100 percent surface examination of the integrally welded attachments selected
- for examination. Relief Request CR 23 is generic in nature without a listing of the specific-components for which relief is requested along with a description of the interference and the percentage of the Code-required examination that can or will be performed for each component.
Comed has estimated that approximately 43 integrally welded attachments for Unit 1 and approximately 40 integrally welded attachments for Unit 2 are expected to be covered by Relief Request CR 23. Comed has also estimated that as much as 62 percent of each weld may not be accessible for surface examination. The regulations do not provide for the granting of generic relief requests.
In the submittal dated August 13,1997, it is also noted that the magnetic particle testing method is being used to perform the surface examination of the subject integrally welded attachments. Comed I
has not addressed the possibility of using the liquid penetrant testing method to achieve 100 percent examinat!on of the Code required surface area.
E For the staff to complete its review, the following additional information is required.
4
-1
~ A list of the specific components for which relief is being requested.
' 2. -A description of the interference with the Code required inspection.
3.
The percentage of the Code-required examination that can or will be performed forcach ~
component.
4.
The possibility of using the liquid penetrant testing method to achieve 100 percent examination of the Code required surface area.