____-_ - _

i Octcber 22. 1997

_ Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services

- Commonwealth Edison Company Executive Towers West 111 -

1400 Opus Place, Suite 500 Downers Grove,IL 60515

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE EVALUATION OF THE THIRD 10-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUEST FOR RELIEF NO. CR-25 ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. M99429 AND M99431)

Dear Ms. Johnson:

h its "A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid.(5).Authorization to Use Partial Insp Coverage Requested|letter dated August 13,1997]], Commonwealth Edison Company (Comed) requested relief from certain requirements of Article IWA-5243(a) of the American Society of i

l Mechanical Engineers (ASME) Boller ar,d Pressure Vessel Code (Code),Section XI,1989 a

Edition, for the Zion Nuclear Power Station, Units 1 and 2. The staff has reviewed the data in the submi'tal and concluded that additional information is required to complete its review.

Enclosed is the request for additional information.

Sincerely, ORIGINAL SIGNED BY:

Clyde Y. Shiraki, Senior Project Manager Project Directorate 111-2 g'

Division of Reactor Projects -lil/IV

-Office of Nuclear Reactor Regulation Docket Nos. 50-295 and 50-304

Enclosure:

- RAI 23b fhE@D@QDU t

tm.: See next page ll111.lll.llillLllll' DISTRIBUTION:

Docket File : PUB!!C-PDill-2 r/f EAdensam RCapra CShiraki.

CMoore OGC,015B18 ACRS, T2E26 MGalloway, Rill DOCUMENT NAME: G:\\CMNTJR\\ ZION \\Zl99429.RAI-Tt receive a copy of this document, indicate in the box; *C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy OFFICE PM:PD3-2 l_APDI-2 L

D:PD3-2 l F NAME CSHIRAKI DfATOltE RCAPRA P DATE 101/97 10A%97 10b/97 9711040175 971022 OFFICIAL RECORD COPY PDR ADOCK 05000295 4

PDR

i

_L.

Octeber 22, 1997-

. Y Ms. Irene Johnson,' Acting Manager Nuclear Regulatory Services

. Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 500 ~

Downers Grove,IL 60515 9

SUBJECT:

_ REQUEST FOR ADDITIONAL INFORMATION FOR THE EVALUATION OF THE THIRD 10 YEAR INTERVAL INSPECTION PROGRAM PLAN REQUEST FOR RELIEF NO. CR ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. M99429 AND M99431) -

Dear Ms. Johnson:

J in its "A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid.(5).Authorization to Use Partial Insp Coverage Requested|letter dated August 13,1997]], Commonwealth Edison Company (Comed)

C requested relief from certain requirements of Article IWA 5242(a) of the American Society of i

Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI,1989 4

Edition, for the Zion Nuclear Power Station, Units 1 and 2. The staff has reviewed the data in

^ the submittal and concluded that additional information is required to complete its review.'

Enclosed is the request for additional information.

4 l

l Sincerely, ORIGINAL SIGNED BY:

Clyde Y. Shiraki, Senior Project Manager Project Directorate 111-2 i

Division of Reactor Projects lil/IV Office of Nuclear Rsactor Regulation Docket Nos. 50-295 and 50-304 L

Enclosure:

RAI

)J cc !See'next page <

i' DISTRIBUTION.

Docket File PUBLIC.

PDill 2 r/f -

EAdensam RCapra C8hiraki CMottrs OGC,015B18 ACRS,T2E26 MGalloway, Rill 4 -

DOCUMENT NAME: G:\\CMNTJR\\ ZION \\Zl99429.RAI g

Ta receive a copy or this doeurrtent, indicale in the bou "C" = Copy without enclosures *E* = Copy with enclosures *N" = No copy OFFICE ^

PM:PD3-2 J

PDj-2 L

D:PD3-2 S

h NAME-CSHIRAKI B19tYOhtE RCAPRA P n

DATE 10//97 10A497 10kN97 i

OFFICIAL RECORD COPY

1

' c ar:c, y

t UNITED STATES s

g NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, T5 C,30se6 0001 e

'N..,. /

October 22, 1997

. Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company-Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE EVALUATION OF THE THIRD 10 YEAR INTERVAL INSPECTION PROGRA'.; Pl.AN REQUEST FOR 4

RELIEF NO. CR ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS, M99429 AND M994311

Dear Ms. Johnson:

In its "A97010, Requests Authorization for Alternative to One Time Augmented Insp of RPV Shell Welds Set Forth in 10CFR50.55a(g)(6)(ii) (A)(2) Per [[CFR" contains a listed "[" character as part of the property label and has therefore been classified as invalid.(5).Authorization to Use Partial Insp Coverage Requested|letter dated August 13,1997]], Commonwealth Edison Company (Comed) requested relief from certain requirements of Article IWA-5242(a) of the American Society of Mechanical Engineers (ASME) Boller and Pressure Vessel Code (Code),Section XI,1989 Edition, for the Zion Nuclear Power Station, Units 1 and 2. The staff has reviewed the data in the submittal and concluded that additional information is required to complete its review.

Enclosed is the request for additional information.

4 Sincerely, 2

Cly e Y. Shiraki, Senior Project Manager Project Di actorate 111-2 Division of Reactor Projects N

Office of Nuclear Reac:oi bgulation Docket Nos. 50-295 and 50-304

Enclosure:

RAI L

cc: See next page I

i t

,w:p+ r,-

e

_,-w--,-e-

me.,

'I liJohnson:

Zion Nuclear Power Station Commonwealth Edison Company-Unit Nos.1 and 2 oc: -

Michael I. Miller, Esquire -.

Sidley and Austin -

~ One First Natloaal Plaza Chicago, Illinois 60603 4 -

Dr. Cecil Lue-Hing -

Director of Research and Development Metropolitan Sanitary District -

of Greater Chicago 100 Eest Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esquire Sedley and Austin One First National Plaza L-Chicago, Illirnsl60603 -

Mayor of Zion Zion,tilinois 60099 tilinois Department of Nuclear Safety-Office of Nuclear Facility Safety 1035 Outer Park Drive' Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Zion Resident inspectors Office ji

- 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator

.U.S. NRC, Region lil 801 Warrenville Road '

Lisle, Illinois 60530-4351-

Station Manager Zion Nuclear Power Station 101 Shiloh Blvd.-

Zion, Illinois 60099-2797 Document Control Desk-Licensing Commonwealth Edison Company '

1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 -

I i

~.

o

  • ., ~

7 REQUEST FOR ADDITIONAL INFORMATIONI 4

1.L or both units, specify the types of inspections (magnetic prticle, v!sual, liquid penetrant or -

F ultrasonic) that were performed on studs or stud assemblies, the total number of studs or

+

- stud assemblies, the number that were inspected and the results of those inspections.

0

- 2. Describe any inspections on borated systems that_ are required for reactivity control that are

' performed during Plant shutdown or startups or during presso e increases or decreases and the most rac9td results of those inspections on both units.

3. During the most recent plant shutdowns, verify that the reactor vessel flange leakage -

detection systems were operable and that they did not indicate the presence of any leakage during the shutdowns, j

4.'

Describe the qualifications and experience of the personnel who performe4 the most record reactor vessel head disassemblies, and provide some assurance that any bonc acid crystai l

buildup would have been documented and reported.

l-

. 5.- Describe any inspections that are performed after the reactor vessel head is detensioned.

L

- State the purpose of the inspections, qualifications of the personnel performing the E

laspections, Cie results of the inspections, and provide some assurance that any boric acid crystal b'illdup would have been documented and reported.

6. Verify that tho' inspections of the reactor vesse! flanges were tiie only Code-required b

inspections that were omitted during the most recent disassembles of the reactor vessel

-heads.

i ENCLOSURE 1

y.,,..,.,,

_.