ML20212E589
| ML20212E589 | |
| Person / Time | |
|---|---|
| Issue date: | 02/18/1987 |
| From: | Cukor P, Wiggins E NRC OFFICE OF ADMINISTRATION (ADM), TEKNEKRON TRANSPORTATION SYSTEMS, INC. (FORMERLY |
| To: | |
| Shared Package | |
| ML20212E532 | List: |
| References | |
| CON-FIN-B-6985-7, CON-NRC-02-81-026, CON-NRC-2-81-26 NUDOCS 8703040383 | |
| Download: ML20212E589 (3) | |
Text
_ _ _ _ _ _ _
e
~
p ~_.. swTse--__
- eve== w -
AMENDMENT OF SOUCITATION/M00lFICATION OF CONTRACT l
1 g
3
- 3. AME PeDansE NT /WODsF IC Al EON NO.
- 3. EF FECT svL DATE
- 4. REQueSil sONpuRCHAEL REQ. MO.
- l. PROJEC T NO Of ePpasseers
. Seventeen (17) 1/23/87 NHS-81-026 dtd 1/6/87
- s. essvED Sv
- p. ADes Nist t RED e y est other chan seem 4 s
[
U.S. Nuclear Regulatory Comission Division of Contracts Washington, DC 20555
- 8. PI AML AND ADDRESS OF CONT R AC T OR (No.. orreet. county. asete end 117 Codes SA. AMLNDMENT OF SOLeC6T AleOh eel C rStar Research Inc.
os. oaf tD ear srau ssi 2121 Allston Way B;rkley, CA 94704 8 0 A.
DiF eC ATION OF CONT R ACT/ ORDER NRC-02-81 -026 109. OATLD 18EE STEN 83)
CODE l FACILITY CODE 9/15/81 11 THIS ITEM ONLY APPLIESTO AMENDMENTS.0F SOLICITATIONS The above numbered solicitation is amended as set forth in item 14 The hour and date specifed for receipt of Offers O is e. tend.d.
is no e..
=ned.
Offer must och nowledge receipt of this amendment prior to the hour and date specified in the sotecitation or es amerded, by one ef the following rnethods (el By completing items 8 and 15. and returning copies of the amendment. Ibl By acknowledging receipt of this amendment on each copy of n oHe-submitted or ict By separate letter or telegram which includes a reference to the soticitation and amendment numbers FAILURE OF YOUR ACKNO%EDG-MENT TO BE RECElVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OF FE R. If by virtue of this amendment you desire to change en offer already submitted,such change may be made by toleram or Liter. provided each teleg em or lette makes reference to the solicitat.on and this amendment, and is received prior to the opening hour and date specifie
- 12. ACCOUNT eNG AND APPHOPRtATION DAT A (J/ reewared)
B& 50-19-03-01 FIN B6985-7 Obligated : $264,000.00
- 13. THIS ITEM APPLIES ONLY TO MDDIFICATIONS OF CONTRACTS / ORDERS.
IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
VI "N'C$"ORDE R NO.'". $ $NE """*"*"' '"' '8"'u> e=enoners T HE CHANGts st T F RTH in nEM 24 ARE MADt eN THE CO+
S. THE ASOVE NUMBE RE D CONTR ACT/OR'OER l$ MODIFIED TO REFLECT THE ADMINISTR ATIVE CHANCES (such as th nges in paydns efface, approprestion dest.ese J 5ET FORTH IN ITEM 14. PURSUANT TO THE AUTHORITY OF F AR 43.303(D).
C. THIS SUPPLEMENT AL AGREEMENT 46 ENT ERED INTO PURSUANT TO AUTHO6411Y OFs X
" Changes" Clause and mutual agreement
- o. OT nt R apraat, F>n et medstatenon end.. user,u,>
E. IMPORTANT: Contractor is not, is required to sign this document and return 2
Copies to the issuing of fsCe.
- 84. DESCRIPTION OF AMENDMENT /MODIF #C AT 60N (Organued 6y UcF sernon heads.ss. sneludsas schedserion/contruet sukeet m.f ter as,here fees 6m )
SEE PAGE TWO 0703040303 070210 026 PDR O
E e as prov6ded herein, att terms and condit6ons of One document referenced in llem 9A of 10A es heretofore thanged, remains untaansed and in full sorte ISA. NAME AND 16TLE OF $6GNER (Type or print)
I6A.NAML AND isT LE OF CONT R ACTING OF FICER (Type or pnasi Peter M. Cukor Elois J. Wiggins 16.CONTPt AC T ON/OF F L RO fa a nc. DAtt 58GNED 8 6e. UNsT E TATE F AME 4A 16C. D ATE UGNEc hff N
O
>L H
A ff BY _
tsinerum orconry Ottseero essener.n orperson.sseruid twnT --
. MSN MDRQ-QMKp0 __ _ _.
.CMOD_____._________________________
FDEFERW22Dfmm
l i-
).-
4 NRC-02-81-026 Modification No. 17 Page 2
~ The purpose of this modification is to revise the contract
. Statement of Work to include delivery schedule and monetary adjustments necessary due to delays in the contractor's receipt of Government-f urnished materials.
Theref ore, in accordance with the contractor 's proposal dated November 4, 1986, and revised proposal dated December 22, 1986, incorporated herein by ref erence, the parties agree to the f ollowing changes A.
Article I, Section 8.0 List _g[_Deliyerablys, is revised to change the delivery schedule established f or tasks 4, 5 and 6 as follows:
/
DeliyeCeble Delivety_Date Tasks 4&5 Siting Codes Final Report 3/31/87 Tasks 4&5 Repository Design Codes Draf t Report 3/31/87 Tasks 4&5 Repository Design Codes Report Review 4/30/87 Tasks 4&5 Repository Design Codes Final Report 5/31/87 3
Tasks 4&5 Waste Package Codes Draf t Report 4/30/87 Tasks 4&5 Waste Package Codes Report Review 5/31/87 Tasks 4&5 Waste Package Codes Final Report 6/30/87 Task 6 Microcomputer Codes f or Repository Design 1/31/87 Task 6 Microcomputer Codes f or Waste Package 1/31/87 Task 6 Microcomputer Codes f or Radiological 6/30/87 Assessment Task 6 Transf er of Codes and Users Manuals 6/30/87 F
1.
Task 6 is modified to delete the requirement for perf ormance of "DA Lessons Learned" ef f orts.
n 3
r "I
nac-O-31 026 Modification No. 17,
' s Page 3 4
t B.
Article II - Ggepipetetipo_gep_l'gymeet, paragraphs A.1 and 2,'
are revised to read f
" Ef t immigd _Gpp t, _E t u gq _ Egg _ag d _Qb l ig e t ign 1.
It is estimated that the total cost to the Governmen't f or _ f ull perf ormance of Phase 1 (Tasks 1, 2 and. 3).,
Phase 11 (Tasks 4 and 5) and Phase III (Tasks 7 and 8) of this contract will be $3,993.750.13, of which the sum j.
$3,669,833.34 represents the estimated reimbursable costs, and of which,t323,924.79 represents the fixed fee.
j
.~
2.
Total f unds currently available f or paym'ont.and allottod to this contract are increased by $264,000.00 f rom i
$3,719,758.13 to $3,993,758.13, of wh1ch $3,669,033.34 represents the estimated reitaburseb.\\e costs ten increase of $246,643.16 f rom $3,423,190.18)', and of which
$323,924.79 represents the fixed fee (en increase of
$17,356.04 from $306,567.95).
j FI L
f v
p 1
i
,.. - - -, - - - -. - -,, -. -,,, - ~., - - _ - - -. - -
--.>----.-,,--..-p,-.
-+w,
,,