ML20212E152

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,changing Tech Specs to Support Operation After Reload 7/Cycle 8 Refueling Outage & Proprietary NEDC-31317P Re Safer/Gestr Loca.Rept Withheld (Ref 10CFR2.790).Fee Paid
ML20212E152
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/23/1986
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Muller D
Office of Nuclear Reactor Regulation
Shared Package
ML19292G521 List:
References
JPN-86-63, NUDOCS 8701050264
Download: ML20212E152 (2)


Text

.

123 Main Street

. White Plains, NewYork 10rf) 914 681.6240

  1. > NewYorkPbwer P""2";"s.n, 4# Authority "-'o- -

Dece@er 23, 1986 JPN-86-63 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. Daniel R. Muller, Director BWR Project Directorate No. 2 Division of BWR Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Recardina Reload 7/ Cycle 8 (JPTS-86-023)

Dear Sir:

This application for an amendment to the James A.

FitzPatrick Technical Specifications proposes the changes necessary to support plant operation after the Reload 7/ Cycle 8 refueling outage. During this outage, 188 fuel bundles are to be removed from the reactor core and replaced by new fuel. This represents a replacement of approximately 1/3 of the fuel bundles now in the FitzPatrick core. As part of a program to qualify Westinghouse Nuclear Energy Systems as a vendor of nuclear fuel for FitzPatrick, four (4) demonstration lead test assemblies of their QUAD + design are included in Reload 7.

The changes to the Technical Specifications involve deleting specifications associated with the discharged fuel and with Cycle 7 specific analyses. These specifications are replaced I. with ones appropriate for the new fuel and based on Cycle 8 specific analyses. Other changes involve correcting pg typographical or other similar administrative errors.

MOQ l N81 These changes to the Technical Specifications are required gg for the startup following the 1987 refueling outage. Tnerefore, mo the Authority requests that this application be approved by eg April 15, 1987.

40 SO Enclosed for filing are three (3) signed originals and 84 nineteen (19) copies of a document entitled " Application for g Amendment to Operating License" together with forty (40) copies No of Attachments I, II, III, and IV thereto, comprising a m statement of the proposed changes to Appendix A of the Technical h : h fl0S Of **

CSy % ! % p,. 8,e $200 r)S16

Specifications, the associated Safety Evaluation, and two (2) j reports from the General Electric Company. These two reports are entitled: " Supplemental Reload Licensing Submittal for James A. FitzPatrick Nuclear Power Plant Reload 7" and " James A.

FitzPatrick Nuclear Power Plant SAFER /GESTR - LOCA Loss-of-Coolant Accident Analysis."

The General Electric report, " James A. FitzPatrick Nuclear Power Plant SAFER /GESTR - LOCA Loss-of-Coolant Accident Analysis," included as Attachment IV to this application

, contains information which General Electric customarily maintains in confidence and withholds from public disclosure.

This information has been handled and classified as proprietary i

to General Electric as indicated in the attached affidavit (Attachment V), and the Authority hareby requests that this report be withheld from public disclosure in accordance with the provisions of 10 CFR 2.790.

l In accordance with 10 CFR 170.12, a check in the amount of i

$150.00 is enclosed as payment of the application fee for the review of the proposed changes to the Technical Specifications.

In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the

{ designated New York State official.

Should you or your staff have any questions regarding the proposed changes, please contact Mr. J. A. Gray, Jr. of my staff.

Very truly yours, hn C. Brons Senior Vice President Nuclear Generation cc: Office of the Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 136 Lycoming, New York 13093 Mr. J. D. Dunkelberger Division of Policy Analysis and Planning New York State Energy Office Agency Building 2, Empire State Plaza Albany, New York 12223 Attachments: as stated