ML20212D343
| ML20212D343 | |
| Person / Time | |
|---|---|
| Site: | 07109268 |
| Issue date: | 09/14/1999 |
| From: | Fuller E External (Affiliation Not Assigned) |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| BFS-NRC-99-091, NUDOCS 9909230076 | |
| Download: ML20212D343 (3) | |
Text
71-92 b i BNFL FuelSolutions Corporation BNFL 1 Victor Square FuelSolutions Scotts Valley, CA 95066 a (33y 438 6444 Fax: (831)438 5206 September 14,1999 BFS/NRC 99-091 Docket No. 71-9268 File No. SNC-109 Director, Office of Nuclear Material Safety and Safeguards US Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Schedule for Submittal of the Impact Limiter Drop Test Report
Reference:
BFS letter, Revised Schedule for Submittal of the Impact Limiter Drop Test Report, BFS/NRC 99-086, dated August 26,1999
Dear Sir,
In the referenced letter, BNFL Fuel Solutions (BFS) committed to provide the results of the impact limiter drop test by the end of September 1999. That schedule was predicated upon satisfactory comparison f the corresponding analyses of the TranStor baskets to the successful results of the impact limiter tests. Those analyses are ongoing; therefore, BFS will not issue the results of the impact limiter drop tests by the end of September 1999. When the basket analyses are sufficiently completed, BFS will inform the NRC of the submittal date for the Impact Limiter Drop Test Report.
The new commitments made in this submittal are identified on Page 3.
If there are any questions, please contact Wayne Massie at (831) 438-6444.
Sincerely, E
'. Ib er f
President & CEO ga
..... Fi 9909230076 990914 PDR ADOCK 07109268 C
Pt U.S. Nuclear Regulatory Commission BFS/NRC 99-091 Page 2 -
cc w/ attachments) -
Larry Eisenstatt -
Westinghouse Electric Company ESBU -
4350 Northern Pike Monroeville PA 15146
]
]
)
cc w/o attachments)
Mr. L.G. Dusek Ms. Marilyn Meigs 3
Portland General Electric BNFL Inc.
J 71760 Columbia River Hwy.
600 New Hampshire Ave NW, Suite #1200 Rainier, OR 97048 Washington DC 20037 Mr. Dan Gildow Mr. Max DeLong
' Portland General Electric Project Engineer 71760 Columbia River Hwy.
Private Fuel Storage, LLC Rainier, OR 97048 c/o NSP,512 Nicollet Mall Minneapolis, MN 55401 Mr. John Broschak Mr. John Donnell Consumers Energy Stone & Webster Palisades Nuclear Plant 7677 E. Berry Ave.
27780 Blue Star Memorial Hwy.
Englewood, CO 80111-2137 Covert, MI 49043-0930 Mr. Steve Guthrie i
Consumers Energy Big Rock Point 10269 U.S. 31 North Charlevoix, MI 49720 i
I I
l 1
I i
l
1
. +,
l U.S. Nuclear Regulatory Commission i
BFS/NRC 99-091 Page 3 List of Commitments 99-091-01 When the basket analyses are sufficiently completed, BFS will inform the NRC of the submittal date for the Impact Limitu Drop Test Report.
I 1
l l
j