Order Imposing Civil Monetary Penalty in Amount of $2,500. Licensee Should Pay Civil Penalty within 30 Days of Date of Order
ML20212C544
Person / Time
Site: 15000005
Issue date: 10/28/1997
From: Lieberman J
NRC OFFICE OF ENFORCEMENT (OE)
To:
COLORADO, STATE OF
Shared Package
ML20212C542 List:
References
EA-96-459, NUDOCS 9710300003
Download: ML20212C544 (8)


Text

-..

4 UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Western Colorado Testing, Inc.

)

Docket No. 150-00005 Grand Junction, Colorado

)

License No. Colorado 580-1

)

EA 96-459 ORDER IMPOSING civil MONETARY PENALTY l

Western Colorado Testing, Inc., (WCTI or Licensee) is the holder of a Generai License pursuant to the provisions of 10 CFR 150.20(a). This authorizes any person who holds a specific license from an Agreement State to conduct the same activity in non-Agreement States subject to the provisions of 150.20(b). WCTl holds a specific license from the state of Colorado, an Agreement Stato, License No. 580-1.

ll An inspection of the Licensee's activities was conducted from October 11,1996, through February 3,1997, and an investigation was conducted from August 14,1996, through January 8,1997. The results of the inspection and investigation indicated that the Licensee had not conducted its activities in full compliance with NRC requirements. A written Notice of Violation and Proposed imposition of Civil Penalty (Notice) was served upon the Licensee by letter dated June 13,1997. The Notice states the nature of the violation, the provisions of NRC requirements that the Licensee had violated, and the amount of the civil pent!ty proposed for the violation.

l 9710300003 971028 PDR STPRG ESOCO PDR l

4 4

4 The Licensee responded to the Notice in a letter dated July 16,1997. In its response, the Licensee stated that facts of the case warrant a reconsideration of both the characterization of the violation (as willful) and the proposed civil penalty.

Ill i:

J After consideration of the Licensee's response and the arguments for mitigation or I

reconsideration of the civil penalty contained therein, the NRC staff has determined, as set forth in the Appendix to this Order, that the violation occurred as stated and that the penalty-proposed for the violation designated in the Notice should be imposed.

i.

f l

iv In view of the foregoing and pursuant to Section 234 of the Atomic Energy Act of 1954, as p.

amended (Act),42 U.S.C. 2282, and 10 CFR 2.205, IT IS HEREBY ORDERED THAT:

i; The Licensee pay a civil penalty in the amount of $2,500 within 30 days of the date of this Order,' by check, draft, money order, or electronic transfer, payable to the Treasurer of the United States and mailed to Mr. m os Lieberman, Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, One White Flint North,11555 l

- Rockville Pike, Rockville, MD 20852-2738.

J-i IF 9

7,,...

.c J

t V

1 I=

The Licensee may regt.ast a hearing within 30 days of the date of this Order. Where good cause is shown, consideration will be given to extending the time to request a hearing. A i'

request for extension of time must be made in writing to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, and include a statement of good cause for the extension. A request for a hearing should be clearly marked as a " Request -

l' for an Enforcement Hearing" and shall be addressed to the Director, Office of Enforcement,

- U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a copy to the

. Commission's Document Control Desk, Washington, D.C. 20555. Copies also shall be sent to l

the Assistant General Counsel for Hearings and Enforcement at the same address and to *.he Regional Administrator, NRC Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011.

i if a hearing is requested, the Commission will issue an Order designating the time and place of the hearing. If the Licensee fails to request a hearing within 30 days of the date of this Order

~

i L

- (or if written approval of an extension of time in which to request a hearing has not been i

~

granted), the provisions of this Order shall be effective without further proceedings. If payment has not been made by that time, the matter may be referred to the Attomey General for -

r collection.

in the event the Licensee requests a hearing as provided above, the issue to be considered at i

such hearing shall be:

(

,---..-_.-_.-----..-.-_-,.-n.--..----._-

i x APPENDIX f

EVALUATION AND CONCLUSIONS On June 13,1997, a Notice of Violaticr. and Proposed Imposition of Civil Penalty (Notice)'was i

. issued for the violation identified during an NRC inspection and investigation! Westem l

CrhMo Testing, Inc., (WCTI or Licensee) responded to the Notice in a letter dated July 16, i:

107, Jn its response, the Licensee stated that facts of the case warrant a reconsideration of l

both the characterization of the violation (as willful) and the proposed civil penalty However,

[

the Licensee did not dispute the violation in its response and, in its April 1,1997_ letter j

respondirig to the inspection report, admitted the violation. The NRC's evaluation of the Licensee's request and conclusion regarding the Licensee's requests are as follows:

F:

Summarv of Licensee's Raanaat for Mitiaation l

1WCTI stated ths.t although management was aware of the requirement to infoim the NRC prior i

to working in areas under NRC jurisdiction, this fact alone does not justify designation of the

' violation as willful, and the corresponding penalty of $2,500. In support of its position, the l

Licensee stated that the Radiation Safety Officer (RSO), who was "not as honest and forthright" as WCTI's president, had represented to WCTI's president that he filed the required Form 241; I

and that WCTI's president made every effort to ensure compliance with NRC requirements.

.WCTI also noted that its compliance efforts are reflected by the fact that there has never been any previous escalated enforcement action against it. WCTl pointed out that, according to the l

NRC's Enforcement Policy, previous escalated enforcement is a factor that is considered in j-assessing a civil penalty, and that this factor was not considered in the proposed assessment of the civil penalty, f=

l

- WCTI noted that, in cases where the NRC concludes that no willful violation has occurred, and no escalated enforcement action has been taken within the two prior years or during the two prior inspections, generally no penalty assessment is even proposed. WCTl maintained that its situation was distinguishable from that of other testing companies that had been " fined" by the i

NRC for willful violations of the same regulations, in thic regard, WCTI claimed that it should not be classified together with those testing firms in which the principals were deliberately-ignoring compliance requirements.-

Finally, the Licensee argued that, upon being notified that Form 241 had not been filed, WCTI took prompt corrective action to ensure compliance and effective comprehensive action to prevent recurrence of the violation.

NRC Evaluafbn of Licensee's Raouest for Mitiaation L

Section VI.A.- of the Enforcement Policy provides that, in general, licensees are held j.

responsible for the acts of their employees. The Commission formally considered the responsibility issue between a licensee and its employees in its decision concerning the Atlantic Research Corporation case, CLI 80-7, dated March 14,1980. In that case, the Commission stated, in part, that "a division of responsibility between a licensee and its employees has no place in the NRC regu! story regime which is designed to implement our obligation to provide i

adequate protection to the_ health and safety of the public in the commercial nuclear field."

~

a

.~

S-p Appendix -

2-Not holding the licensee responsible for the actions of its employees, whether such actions result from negligence or will'lul misconduct, is tantamount to not holding the licensee

- responsible for the use or maession of licensed material if the NRC adopted this position, there would be less incer;tive for licensees to monitor their own activities to assure compliance because licensees could attribute noncompliance to employee negligence or misconducti

- Therefore, notwithstanding WCTl's argument that the blame for the violation rests with the former company RSO, under long-established Commission Policy and case law, the company la still responsible for the actions of its former RSO. Further, the NRC nc4M ist the violation continued to exist in 1996, after the assignment of a newly trained RSO. M detracts from the Licensee's argument that the blame lay with one particular former RSO.-

As WCTI noted,Section VI.B.2 o' f the NRC's Enforcement Policy provides for consideration of-previous escalated enforcement in the civil penalty assessment process. However, the civil-

- penalty assessment process considers several factors, including whether the violation is willful.

If any one of these considerations applies, the policy states that the NRC should normally F

consider identification in addition to corrective action in the civil penalty assessment process

- (regardless of the licensee's previous escalated enforcement). In this case, the NRC considered both identification and corrective action in determining the civil penalty because the m

NRC concluded that the violation was willful.-

f' The term " willfulness," as oefined by Section IV.C. of the NRC Enforcement Policy embraces a spectrum of violations ranging from deliberate intent to violate or falsify, to and includina -

, careless disreaard for reauirements (emphasis added), in this case, as described in the NRC's Notice, the NRC concluded that WCTI (not its president), through the action of one or more of j.

Its representatives, committed a violation with careless disregard for NRC regulations, a condition that clearly meets the NRC's (5finition of a willful violation. As described in the Notice, the NRC's, conclusion was based on several grounds, including the fact that WCTI had e

knowledge of the requirement to file NRC Form 241 (which WCTI admits in its response).

6 As to Licensee's discussion of the NRC Enforcement Policy, civil penalties are not normally

. proposed in cases where the NRC concludes that no willful violation has occurred and no escalated enforcement action has been taken within the two prior years or two prior inspect ons, provided that prompt and comprehensive corrective action is taken. However, the policy provides for consideration of civil penalties in cases involving willfulness.

' The NRC reviews each case being considered for enforcement action on its own merits to L

ensure that the severity of a violation and enforcement sanction are best suited to the significance of the particular vic!ation. In this case, as noted above, the NRC concluded that

- the violation was willful. Therefore, in accordance with Section VI.B of the Enforcement Policy, i

the NRC concluded that: (1) no credit was warranted for identification because the NRC '

p

. identified the violation; and (2) credit was warranted for WCTI's prompt and comprehensive corrective action (had the NRC concluded otherwise, a civil penalty of $5,000 would have been proposed).

{

i 4

l i -

4-

. -,. -. ~, -

n

~~-,

Appendix In its response, WCTI claimed that its case was "readily distinguishable" from other similar enforcement actions such as EA 95-270, "Foley Construction Services," EA 95-101, "Testco, Inc;,' and EA 93-241, "S. K. McBryde, Inc." The NRC agrees that WCTI's case is distinguishable from the cases cited by WCTl in that the cases cited involved deliberate i

violations, not violations involving careless disregard. However, WCTI's cormarison of the civil penalty in this case to that in the cases cited in flawed in that: (1) the civil penalty in the Foley Construction Services case was based on the civil penalty assessment process described in an earlier Enforcement Policy'; (2) the enforcement action taken against Testco, Inc., involved an Order Prohibiting involvement in NRC-Licensed Activities to President of the company, as well as a civil penalty to the licensee, whicn was initially based on Jnforcement discretion and

- subsequently reduced from $5,000 to $1,000; and (3) the S. K. McBryde case did not involve an NRC Form-241 violation, it involved a Severity Level IV violation for failure to maintain -

complete and accuf ste records and a civil penalty that was based on the civil penalty assessment process described in the earlier Enforcement Policy. Furthermore, the 4

enforcement action against WCTI is consistent with other recent cases involving careless disregard by testing companies to submit Form 241 where corrective action credit was warranted. For example, penalties of $2,500 were assessed in enforcement actions involving EA 96-382, " Energy Technologies, Inc.," EA 96-382, "Grandin Testing Lab, Inc.," and EA 96-447, " Testing Laboratories, Inc.'8 NRC Conclusion The NRC concludes that the violation occurred as stated and that the Licensee has not provided adequate justification for reconsideration of the characterization of the violation as

" willful' or for mitigation of the civil penalty. Consequently, the proposed civil penalty in the amount of $2,500 should be imposed.

1 in this earlier Enforcernent Policy, the base amount for a Seventy Levellit was $500 and the civil penalty assessment process involved consideration of 6 factors. Under the current Enforcement Policy, the base amoun' for a Severity Level lli is

$2,500 and the civil penalty assessment process involves consideraten of 2 factors.

2 These cases are available on the NRC web site at "httpWwww.nre govloel", which is maintained by the Office of Enforcement.

4 Whether on the basis of the violation admitted by the Licensee, this Order should be sustained.

FOR THE NUCLEAR REGULATORY COMMISSloN W- --

<]

~

James Lieberman, Director Office of Enforcement Dated at Rockville, Maryland this 28thay of October 1997 i!

4 Western Colorado Testing, Inc.

bec w/

Enclosure:

f

~

PDR I

7 LPOR NU OCS SECY.

EC's: RI, Ril, Riti 4

- CA-PA (0-2G4)

EDO (0-17G21)

OlG (T-5D28)

DEDO (0-17G21) 01 (0-3E4)-

OE:EAFile (0-7HS)

OE (0-7H5).

OGC (0-15B18)

OGC (0-15B18) b8 MSS (T-8A23)

NMSS (T-8FS)

OC/DAF (T-9E10) -

OC/LFDCB (T-9E10) -

RIV RA Reading File GSanbom-EAFile RWise-Allegation File DNMS Files r

MIS Coordinator

,RIV Files

.' PAO /Henderson.

RSLO/ Hackney

~

LWilliamson, OI E-Mall DISTRIBUTION:

' OEMAIL.

JDyer (JED2)

WBrown (WLB)

' EWMerschoff (EWM)

GSenborn (GFS)

GMVasquez (GMV) e s

. BHenderson (BWH)

MHammond (MFH2)

CHackney (CAH)

DKunihiro (DMK1)

- RScarano (P.AS1)

CCain (CLC)

LHowell (LLH)

FWenslawski(FAW)

DSpitzberg (DOS)

JCruz (JXC2) br dh OGC SF RA:RIV c.,s D;Oi (

OE-n, n

a NMamish JGoldberg EMerschoff JLieberman lb 3/97-1 tolt l97 so l2497 i

Io 12Ll97 nuo sg c-w t Doc. Narr.e: G:\\OECASESWP459REV.NM 9h L.

~ ~ - '

^ - '

DOCUMMY DMDVR INSERTED BY DOCUMENT RECEIPT & PROCESSING kUDOCS FORM-123

CATEGORY 2

. REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9710300155 DOC.DATE: 97/10/22 NOTARIZED: NO DOct; T.I' f FACIL:

030340Ci AUTH.NAME AUTHOR AFFILIATION BECHHOEFER,C.

Atomic Safety & Licensing Board Panel RECIP.NAME RECIPIENT AFFILIATION Office of the General Counsel (Post 860701)

SUBJECT:

Memorandum & order (staff motion for delay of proceeding).*

Request for 120 day delay,:r.easured f rom 970930,date of staff C

motion, granted.N/ Certificate of Svc. Served on 971022.

h ENCL d SIZE:

A DISTRIBUTION CODE: DS02D COPIES RECEIVED:LTR TITLE: SECY/DSB Dist: Non-Antitrust Issuances (Orig &/or Served by NRC Other T

NOTES:

g RECIPIENT COPIES RECIPIENT COPIES U

ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL LA 1

PD L

1 PM 1

O R

INTERNAL: ASLBP 01 1

CAA-16B-13 1

NUDOCS-ABSTRACT 1

OGC/PSB 1

]

1 Y

RGN....g EXTERNAL: NRC PDR W 16 2

D 0

C 1 i

U M

E N

T NOTE TO ALL ' RIDS' RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUM3ER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2003 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 24

_