ML20212B209

From kanterella
Jump to navigation Jump to search
Informs That CAW-85-059, Westinghouse Setpoint Methodology for Protection Sys,Millstone Nuclear Power Station Unit 3, Withheld Per 10CFR2.790,in Response to 850920 & 24 Submittals
ML20212B209
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/29/1986
From: Doolittle E
Office of Nuclear Reactor Regulation
To: Wiesemann R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8608060258
Download: ML20212B209 (4)


Text

.

l

>2 UGg y Ig UNITED STATES y )s.( g NUCLEAR REGULATORY COMMISSION

'j WASHINGTON, D. C. 20555 8 5 .

% ,\j,, # E 2 S fg86 Docket No. 50-423 Mr. R. A. Wiesemann, Manager Regulatory and Legislative Affairs Westinghouse Electric Corporation Post Office Box 355 Pittsburgh, Pennsylvania 15230

Dear Mr. Wiesemann:

SUBJECT:

WESTINGHOUSE SETPOINT METHODOLOGY FOR PROTECTION SYSTEMS, MILLSTONE NUCLEAR POWER STATION, UNIT 3 - CAW-85-059 -

WITHHOLDING FROM PUBLIC DISCLOSURE By Northeast Nuclear Energy Company letter, dated September 24, 1985, and

- Westinghouse Electric Corporation letter, dated September 20, 1985, and '

- affidavit, dated December 2,1976, you submitted the " Westinghouse Setpoint
  • Methodology For Protection Systems, Millstone Nuclear Power Station Unit 3" and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790.

You stated that the submitted infomation should be considered exempt from mandatory public disclosure for the following reasons:

The information submitted is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. It consists of supporting data, including test data, relative to a process, the

! application of which data secures a competitive economic advantage or improved marketability. The use of such infonnation gives Westinghouse a competitive advantage over its Westinghouse competitive position.

We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and, on the basis of the Westinghouse statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary comercial information.

We have determined that the " Westinghouse Setpoint Methodology for Protection Systems, Millstone Nuclear Power Station, Unit 3," should be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

We therefore approve your request for withholding pursuant to 10 CFR 2.790 and are withholding the subject document from public inspection as proprietary.

8608060258 DR 860729 ADOCK 05000423 PDR

Withholding from public inspection shall not affect the right, if any of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this infomation to our consultants working in this area. We will, of course, insure that the consultants have signed the appropriate agreements for handling proprietary infomation.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, such as if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC needs additional information form you or makes a determination adverse to the above, you will be notified in advance of any public disclosure Sincerely,

.{. n .

L' ' '

jV .

I Elizabeth . Doolittle, Project Manager PWR Project Directorate #5 Division of PWR Licensing-A cc: Mr. J. F. Opeka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

e Docket No. STN 50-601 (WAPWR) RESAR-SP/90 Mr. E. P. Rahe, Jr., Manager Nuclear Safety Department Westinghouse Electric Corporation Water Reactor Divisions, Box 355 Pittsburgh, PA 15230 Dr. Rober Bari Brookhaven National I.aboratory Building 130.

Upton, NY 11973 asum e

4 t $

e f

I

' WL 2 9 g 2

Withholding from public inspection shall not affect the right, if any of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, insure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, such as if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC needs additional information form you or makes a determination adverse to the above, you will be notified in advance of any public disclosure Sincerely, Elizabeth L. Doolittle, Project Manager PWR Project Directorate #5 Division of PWR Licensing-A cc: Mr. J. F. Opeka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 270 bu on:

Hartford, Connecticut 06141-0270 , , M. Rushbrook Do NRC PDR' F. Burrows Local PDR E. Shomaker PD#5 R/F ACRS (10)

T. Novak OELD J. Partlow B. Grimes E. Jordan E. Doolittle Ul , . -

0FC :PDf5 :PDfjl/ :BWEI :0GT# :D t  :  :

_ . _ _ . _ _ _ _ _ : _ _ _ _ _ _ _ _ _ _ _ _ : _g _ . .__:____________:___________

. . _ _ _ : _[_)_

NAME:MRushb/ohk:es Ddo dtle :24;4 F, fkrrasf:E5homaker :VSNoona  :  : :

_____;_____..____:____7.._____:____________:__h_86 DATE Vi/c,\/86 :1 A6/86 :7 /M/86 :l/ :7/d/86 - -

r y a 0FFICIAL RECORD COPY

\

- _- __