ML20212B128
| ML20212B128 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/18/1986 |
| From: | Salyards L BALTIMORE GAS & ELECTRIC CO. |
| To: | Thadani A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8612290176 | |
| Download: ML20212B128 (3) | |
Text
g kN BALTIMORE GAS AND ELECTRIC
\\/
CHARLES CENTER. P.O. BOX 1475 BALTIMORE. MARYLAND 21203 NUCLEAR ENGlNEERING SERVICES DEPARTMENT CALVERT CUFFS NUCLEAR PC/NER PLANT LU$8Y, MARYLAND 20857 December 18,1986 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 ATTENTION:
Mr. Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Information to Demonstrate Compliance with ATWS Rule,10 CFR 50.62, Schedule for Submitting AdditionalInformation for Amendment
REFERENCES:
(a)
Letter from Mr. S. A. McNeil (NRC), to Mr. J. A. Tiernan (BGRE),
dated December 3,1986 Gentlemen:
You asked that we submit the information requested in Reference (a) by January 8,1987 or submit a schedule within 15 days of receipt of the request. We have determined that it is not possible to submit the requested information by January 8.
At this time, we estimate that we can provide the information you requested by June 1,1987.
This date is a preliminary estimate based on:
the current workload for the engineers who must provide the information, the extensive amount of information that you requested, and a conversation with the technical reviewer, Rick Kendall, to clarify some of the requested information.
We may find that we can respond before June 1,1987, but we need more time to scope out the request in full before committing to an earlier date.
We are committed to implement the ATWS rule on Unit 2 during the spring 1987 refueling outage. This is based on having a complete NRC review prior to our final design so that any changes can be incorporated in the final design.
8612290176 861218 0
PDR ADOCK 05000317 lki9 P
i\\
~ Mr. Ashok C. Thadani December 18,1986 Page 2 Since your review and our final design and installation will be working in parallel, we may ask for some form of relief from our current commitment for Unit 2 at a later date.
Should you have any questions regarding this matter, please do not hesitate to contact us.
Very truly yours, C
W L. E. Satyards Principal Engineer Licensing and Operational Safety Unit LES/ WPM /dtm cc:
D. A. Brune, Esquire
- 3. E. Silberg, Esquire S. A. McNeil, NRC T. Foley, NRC l
i
,s Mr. Ashok C. Thadani December 18, 1986 Page 3 bcc R. F. Ash /R. C. L. Olson C. H. Cruse /P. E. Katz R. E. Denton/S. A. Mihalcik R. M. Douglass/T. N. Pritchett Dr. M. Gavrilas/E. I. Bauereis
- 3. R. Lemons /R. P. Heibel W. 3. Lippold/A. R. Thornton F. 3. Munno R. B. Pond /R. E. Cantrell L. B. Russell /3. T. Carroll R. E. Lapp C. M. Rice R. G. Staker W. R. Horlacher, Ill W. P. McCaughey B. E. Hollan P. E. McGrane M. E. Bowman L. E. Saiyards M. D. Patterson/3. D. Palank C. R. Mahon/R. B. Sydnor