Ente gy Operations,Inc.
Killona. LA 70C06 Tel 504 739 6242 I c. Ewing, lil ye, muen mn W3F1-97-0244 A4.05 PR October 23,1997 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 1.icense No. NPF-38 Waterford 3 Performance Improvement Plan Gentlemen:
On May 8,1997, Waterford 3 submitted in Letter Number W3F1-97-0114, the Waterford 3 Performance improvement Plan (PIP). The purpose of this letter is to update the docket regarding change requests for the following th ee Performance improvement Plan items:
CHANGE REQUEST # 1 True North Goal: 1 - Operate Waterford 3 Safely Strategy: A - Achieve excellence in human performance item: 3 - Hold quarterly Human Performance Awareness days Change Request and Basis for Change
/
When the Performance improvement Plan was written, the process for human D
performance improvement was not fully developed. As planning proceeded, the actions in this commitment were determined to be no longer needed in favor of using the more structured process provided through a contract organization, Performance improvement International. The current planned human performance improvement actions are more extensive than those originally proposed under item 1 A3 and will be tracked by PIP ltem 1 A4. Waterford 3 therefore is closing item 1 A3, Hold quarterly Human Performance Awareness days.
9710270084 971023 hfhfklllhhflflfl PDR ADOCK 05000302 P
PDR j
I
Change Request for Performance Improvement Plan 4th Quarter items W3F1-97-0244 Page 2 October 23,1997 CHANGE REQUEST # 2 True North Goal: 1 - Operate Waterford 3 Safely Strategy: D - Operate within and improve the understanding of the Design and Licensing bases-Item: 4 - Review selected sections of the Updated Final Safety Analysis Report (UFSAR) for accuracy and completeness Change Request and Basis for Change We m currently evaluating different alternatives for performing a review of the UFSAR. Our historical and currently ongoing efforts, such as the past upgrade of Design Basis Documents, Calculations, and the ongoing design basis evaluations, have confirmed the integrity and accuracy of many aspects of the UFSAR. These efforts have also given us insight about the type and nature of the discrepancies we have found in the UFSAR. Rather than embarking on a broad based UFSAR review approach, we are developing an approach which will be based on this past experience and will use the current design basis evaluation efforts. This approach will allow us to focus on confirming the mest important elements of the design basis in the UFSAR and also allow us to optimize our resources in completing important design basis work currently in progress. Because completion of our plan for the review of the UFSAR is expected to extend beyond December 31,1997 to January 15,1998 schedule extension for this item is necessary. Waterford 3 will inform you at that time of our schedule for the UFSAR review.
CHANGE REQUEST # 3 True North Goal: 4 - Expeditiously Fix Problems Once Strategy: A -Improve engineering process, including station change processes item: 1 -Implement a site-wide Engineering Request (ER) Process Change Request and Basis for Change The continuation of Refuel Outage 8 (RFO8) beyond the original scheduled completion as well as other circumstances negatively impacted Phase ll of this item.
Item extension from December 31,1997 to March 31,1998 is required due to lost time in conjunction with the extension of.<F08; preparation, support, and response m
i Change Request for Performance improvement Plan 4th Quarter items W3F197-0244 Page 3 October 23,1997 associated with the upcoming NRC Engineering and Technical Support inspection;-
support for the INPO Inspection; and holidays.
- These items were previously discussed with Mr. Phil Harrell on September 25,1997 via telephone. Please contact me at (504) 739-6242 or Tim Gaudet at (504) 739-6666 should you require any additional information.
Very truly yours, f
E.C. Ewing
- Director, Nuclear Safety & Regulatory Affairs ECE/ PRS!ssi