Text
-
Mr..Neil S. Carns October 15, 1997 Senicr-Vice President
-and Chief Nuclear Officer Northeast Nuclear Energy Company c/o Ms.. Patricia A. Loftus-Director - Regulatory Affairs P.O. Box 128 Waterford, CT 06385
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT 3 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. M99132)
Dear Mr. Carns:
By letter dated June 30, 1997, you applied for an amendment to the Millstone Nuclear Power Station, Unit 3 Facility Operating License No. NPF-49.
Technical Specifications (TSs) 4.6.1.1, 3/4.6.1.2, and 3/4.6.1.3 require the testing of the containment to verify leakage limits at a specified test pressure. The proposed amendment would have (1) modified the list of valves that can be opened in Modes 1 through 4, (2) added a footnote on procedure controls, (3) removed a footnote on Type A testing, and (4) made editorial changestotheTSsandassociatedBasessections.
Subsequently, by letter dated October 7, 1997, you withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sin re]y, 1
dn
'd,imes
.Anderse,n,NojectManager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosure:
Notice of Withdrawal cc w/ encl: See next page DISTRIBUTION:
Q\\
Docket File:
\\"
PUBLIC SP0-L Reading SP0 Reading WTravers g
PMcKee i
LBerry JAndersen 0GC ACRS JDurr, RI DOCUMENT NAME:
G:\\ MCDONALD \\M93955. WIT-M To t?ctive a copy of this document, huecate in the box: "C"
- Cony without attachmeprplaisure "E"
Copy with attachment / enclosure
- N' = No copy 0FFICE SPO-L:PM SP0-L:LA i ( C/ SP0fLfDD' l
l NAME JAndersen /24.N LBerrty A(f PMc(ee
- DATE 10// f/97 Fe 10/ll}/97 l
10/ L/97 10/ /97 10/ /97 4
'\\
OFFICIAL RICORD COPY
'U 5' I' C M""wg NY 9710230219 9'7101S
"""'Ab l
a cx o'ooss#
.Lll, Ll 1]l',
1 psat:vqk i
UNITED STATES p
g j
NUCLEAR REGULATORY COMMISSION
\\.....p*
WASHINGTON. D.C. soseHoot 8
October 15, 1997 Mr. Neil S. Carns Senior Vice President and Chief Nuclear Officar Northeast Nuclear Energy Company c/o Ms. Patricia A. Loftus Director - Regulatory Affairs P.O. Box 128 Waterford, CT 06385
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT 3 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. M99132)
Dear Mr. Carns:
By letter dated June 30, 1997, you applied for an amendment to the Millstone Nuclear Power Station, Unit 3 Facility Operating Licer.se No. NPF-49.
Technical Specifications (TSs) 4.6.1.1, 3/4.6.1.2, and 3/4.6.1.3 require the testing of the containment, verify leakage limits at a specified test pressure. The proposed amendment would have (1) modified the list of valves that can be opened in Modes 1 through 4, (2) added a footnote on procedure controls, (3) removed a footnote on Type A testing, and (4) made editorial changes to the TSs and associated Bases sections.
Subsequently, by letter dated October 7, 1997, you withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/
, e,q James W. Andersen, Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosure:
Notice of Withdrawal cc w/ encl: See next page