ML20212A052

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Updated Fsar,Reflecting Changes Made During 1-yr Period Ending 860122.Chapter 17, QA Program, Revised to Reflect Organizational Changes
ML20212A052
Person / Time
Site: FitzPatrick 
Issue date: 07/22/1986
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20212A057 List:
References
JPN-86-32, NUDOCS 8607280104
Download: ML20212A052 (6)


Text

123 Main Street White Plains, New York 10601 914 681.6240

  1. > NewYorkPower P"", 0 ". n1 July 22, 1986 JPN-86-32 Mr. Harold R.

Denton Director of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 1986 Annual Final Safety Analysis Report Update

References:

1.

NYPA letter, J.

P.

Bayne to Mr.

T.

E.

Murley, dated October 22, 1984 (JPN-84-69).

Dear Sir:

In accordance with the requirements of 10 CFR 50.71(e), the annual update of the Final Safety Analysis Report (FSAR) for the FitzPatrick plant has been completed.

This update contains the information available as of January 22, 1986, and reflects changes to the plant which occurred during the one year period ending on that date.

Enclosed are thirteen (13) copies of the replacement pages reflecting these changes.

Filing instructions for making the necessary page replacements are included for your convenience.

A bold vertical line has been drawn in the margin adjacent to the portion of text actually changed.

Each r'eplacement page is also marked with the date of change and the revision number.

Those pages containing unchanged text which has been relocated, due to additions or deletions on preceding pages, are identified only by a revision bar at the bottom of the page.

The unchanged but relocated text is not identified by a vertical line adjacent to the text.

FSAR Chapter 17, " Quality Assurance Program" has been revised only to reflect a change in the Authority's organizational structure.

The organizational changes have been made only to provide focused functional area management and efficiency.

These revisions do not reduce the commitments in the program description previously approved by the NRC.

The program description demonstrates the Authority's continued compliance with Appendix B to 10 CFR 50.

The enclosure satisfies the requirement of 10 CFR 50.54(a) to submit an annual update of the quality assurance program description.

8607280104 860722 PDR ADOCK 05000333 K

PDR g

's

~

\\

Should you or your staff have any questions regarding this matter, please contact Mr.

J.

A. Gray, Jr. of my staff.

Very truly yours, hn Brons 3enior Vice President Nuclear Generation State of New York j

County of Westchester Subscribed and Sworn to before me thisJL;l day of d 1986.

BARBARA AhN McGUIRE Notary rs.:a L.:..

.; aew York No. 4851437 p res J n. 271.E g

Com on Notary Public cc:

Dr. Thomas Murley Regional Administrator, Region I U.

S.

Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Office of the Resident Inspector U.

S.

Nuclear Regulatory Commission P.O.

Box 136 Lycoming, NY 13093 l

l l

NEW YORK POWER AUTHORITY JAMES A.

FITZPATRICK NUCLEAR POWER PLANT 1986 FINAL SAFETY ANALYSIS REPORT UPDATE FILING INSTRUCTIONS The contents of this package are either new or replacement pages for New York Power Authority's Final Safety Analysis Report. Please remove and discard the superseded pages, and insert the new material.

Status of FSAR Paoes REMOVE INSERT VOLUME 1 Pages 1-23 Revised Pages 1-23 VOLUNE 2 Pages 3.2-1/2 Revised Pages 3.2-1/2 Table 3.2-1 Revised Table 3.2-1 Fig.

3.2-1 Revised Fig.

3.1-1 Page 3.5-8 Revised Page 3.5-8 Page 3.5-10 Revised Page 3.5-10 Page 3.5-11 Pevised Page 3.5-11 Page 3.5-12a Revised Page 3.5-12a Fig.

3.5-7 Re'/leed Fig.

3.5-7 Page 3.10-2 Revised Page 3.10-2 Page 4.2-7 Revised Page 4.2-7 Page 4.3-5 Revised page 4.3-5 VOLUME 3

(

Page 5-iv Revised Page 5-iv Page 5.2-7 Revised Page 5.2-7 Pages 5.2-9/10 Revised Pages 5.2-9/10 Page 5.2-17 Revised Page 5.2-17 Pages 5.2-21/22 Revised Pages 5.2-21/22 Page 5.2-23 Revised Page 5.2-23 Page 5.2-37 Revised Page 5.2-37 VOLUME 4 Pages 7-xili/xiv Revised Pages 7-xlii/xiv Page 7.1-2 Revised Page 7.1-2 Page 7.1-22 Reviced Page 7.1.-22 Pages 7.1-31 thru 34 Revised Pages 7.1-31 thru 34 l

Page 7.1-36 Revised Page 7.1-36

(

j Status of FSAR Pagna REMOVE INSERT Page 7.1-37 Revised Page 7.1-37 Table 7.1-2 sh. 2 Revised Page 7.1-2 sh. 2 Page 7.2-2 Revised Page 7.2-2 Pages 7.2-11/12 Revised Pages 7.2-11/12 Page 7.2-14 Revised Page 7.2-14 Page 7.2-16 Revised Page 7.2-16 I

Page 7.2-17 Revised Page 7.2-17 Table 7.2-1 Revised Table 7.2-1 Fig.

7.2-1 sh. 2 Revised Fig.

7.2-1 sh. 2 Page 7.3-19/20 Revised Page 7.3-19/20 Page 7.3-23/24 Revised Page 7.3-23/24 Table 7.3-1 sh. 1-9 Revised Table 7.3-1 sh. 1-16 Table 7.3-2 sh. 1,2 Revised Table 7.3-2 sh. 1,2 Fig.

7.3-4 sh. 2 Revised Fig.

7.3-4 sh. 2 Fig.

7.3-6 Revised Fig.

7.3-6 j

Fig.

7.3-8 Revised Fig.

7.3-8 Page 7.4-4 Revised Page 7.4.-4 l

Page 7.4.-5 Revised Page 7.4-5 Page 7.4-13 Revised Page 7.4-13 Table 7.4-1 sh. 1,2 Fevised Table 7.4-1 sh. 1,2 1

Table 7.4-2 Revised Table 7.4-2 1

Table 7.4-3 Revised Table 7.4-3 Table 7.4-4 sh. 1 Revised Table 7.4-4 sh. 1 Fig.

7.4-2 sh. 1 Revised Fig.

7.4-2 sh. 1 Fig.

7.4-3 sh. 1-3 Revised Fig.

7.4-3 sh. 1-3 Fig.

7.4-6 Revised Fig.

7.4-6 Fig.

7.4-7 sh. 1 Revised Fig.

7.4-7 sh. 1 Fig.

7.4-8 sh. 1 Revised Fig.

7.4-8 sh. 1 Fig.

7.4-9 sh. 1 Revised Fig.

7.4-9 sh. 1

{

VOLUME 5 Page 7.5-20 Revised Page 7.5-20 Page 7.5-22 i

Revised Page 7.5-22 Fig.

7.5-18 Revised Fig.

7.5-18 f

Pages 7.8-3/4 Revised Pages 7.8-3/4 Page 7.8-6 Revised Page 7.8-6

(

Fig.

7.8-2 Revised Fig.

7.8-2 l

Pages 7.9-3/4 Revised Pages 7.9-3/4 New Tab 7.18 New Pages 7.18-1/2 VOLUME 6 Page 8.3-1 Revised Page 8.3-1 l

Page 8.3-4 Revised Page 8.3-4 Pages 8.3-5/6 Revised Pages 8.3-5/6 Fig.

8.3-2 Revised Fig.

8.3-3 Fig.

8.3-3 i

Revised Fig.

8.3-3 Fig.

8.3-5 Revised Fig.

8.3-5 l'

Page 8.7-1 Revised Page 8.7-1 _ _ _ _ _ _

1

Simtus of FSAR Paaes REMOVE INSERT l

Fig.

8.7-1 sh. 1,5 Revised Fig.

8.7-1 sh. 1,5 Page 8.10-1 Revised Page 8.10-1 Pages 9.8-3/4 Revised Pages 9.8-3/4 s

Page 9.8-7 Revised Page 9.8-7 I

Fig.

9.8-1 Revised Fig.

9.8-1 Pages 9.1-3/4 Revised Pages 9.1-3/4 Page 9.9-5 Revised Page 9.9-5 Pages 9.9-7 thru 14 Revised Pages 9.9-7 thru 14 Table 9.9-1 Revised Table 9.9-1 Fig.

9.10-2 Revised Fig. 9.10-2 Page 9.15-6 Revised Page 9.15-6 VOLUME 7 Page 11-11 Revised Page 11-11 Page 11-vi Revised Page 11-vi Fig.

11-1 Revised Fig.

11-1 Pages 11.2-2 thru 12 Revised Pages 11.2-2 thru 12 Fig.

11.2-1 Revised Fig.

11.2-1 Fig.

11.2-4 Revised Fig.

11.2-4 Fig.

11.2-5 Revised Fig, 11.2-5 Fig.

11.2-6 sh. 1,2 Revised Fig.

11.2-6 sh. 1,2 Pages 11.3-2,3,4 Revised Pages 11.3-3,2,4 Fig.

11.3-1 Revised Fig.

11.3-1 Pages 11.4-3 thru 6 Revised Pages 11.4-3 thru 6 Fig.

11.4-1 sh. 2 Revised Fig.

11.4-1 sh.2 i

Fig.

11.4-5 (Deleted)

VOLUNE 8 1

Page 12-1 Revised Page 12-1 l

Page 12.2-1 Revised Page 12.2-1 Page 12.2-3 Revised Page 12.2-3 Fig.

12.2-4 Revised Fig.

12.2-4 Page 12.3-9 Revised Page 12.3-9 Fig.

12.3-2,3 Revised Fig.

12.3-2,3 Fig.

12.3-5 Revised Fig.

12.3-5 Page 13-1 Revised Page 13-1 Page 13-vi Revised Page 13-vi Pages 13.2-1 thru 5 Revised Pages 13.2-1 thru 5 Fig.

13.2-1 thru 6 Revised Fig.

13.2-1 thru 6 Page 13.10-1 Revised flg.

13.10-1 i n

Status of FSAR Pr_Sita REMOVE INSERT 4

l VOLUME 9 I

Page 14-111 Revised Page 14-111 Page 14.5-22 Revised Page 14.5-22 1

Page 14.9-2 Revised Page 14.9-2 Page 15.1-1 Revised Page 15.1-1 Page 16.1-19 Revised Page 16.1-19 VOLUME 10 Page 16.4-1 Revised Page 16.4-1 Pages 17.2-1 thru 5 Revised Pages 17.2-1 thru 5 j

Page 17.2-8 Revised Page 17.2-8 Page 17.2-10 Revised Page 17.2-10 t

Page 17.2-31 Revised Page 17.2-31 Page 17.2D-1 Revised Page 17.2D-1 Fig.

17.2-1 thru 4 Revised Page 17.2-1 thru 4 i

l l

]

k I

i l

l l

i I

l

(

i l !

l lt

?

- --