Clarifies Re Intentions to Use Reduced Duration Type a Testing.Test Acceptance Criteria for Reduced Duration Testing Based on Bechtel Rept BN-TOP-1 Criteria
ML20212A019
Person / Time
Site: Beaver Valley
Issue date: 07/21/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Tam P
Office of Nuclear Reactor Regulation
References
NUDOCS 8607280096
Download: ML20212A019 (2)


Text

- _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

G

'Af

%uestie Ugfit rerepnone (412) 393 8000 July 21, 1986 Nuclear Group P.o. Box 4 Shippingport, PA 15o77. con 4 DJrector of Nuclear Reactor Regulation

41. S. Nuclear Regulatory Commission Attn: Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555

- Mail Stop 340 -

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Reduced Duration Type A Testing Requirements Gentlemen:

On May 16, 1986, we submitted our intentions to use the reduced l

duration Type A testing.

Due to questions raised by the NRC reviewer, this letter is provided to clarify and supercede our previous submittal.

f In accordance with the Beaver Valley Power Station Unit No. 1 Technical Specifications 3/4.6.1.2, the provisions and methods of Appendix l

J to 10CFR50 and ANSI N45.4-1972 govern the duration of Type A testing.

ANSI N45.4-1972, Section 7.9, Computation of Leakage Rate-The Absolute

Method, states that " Leakage rates shall therefore be calculated on at least an hourly basis for 24 consecutive hours (or other agreed upon period)".

Provisions for reduced duration Type A testing have been approved by the NRC. These provisions are contained in the Bechtel Topical Report BN-TOP-1, Revision 1,

November 1972.

Beginning with the fifth refueling outage, it is our intent to use the reduced duration test acceptance criteria at Beaver Valley Power Station Unit No. 1, until the ANS 56.8 Standard Committee develops new criteria for reduced duration testing based on the Mass Point Analysis Method.

Beaver Valley's test acceptance criteria for reduced duration testing is based on the BV-TOP-1 criteria.

If, however, the full 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration is performed, only the Absolute Method criteria would apply.

If you have any additional questions regarding our intention, please contact us at your convenience.

Very truly yours, LJ4 e607280096 860721 J

J. Care L?#

dh PDR ADOCK 05000334 P

PDR

'/d

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Reduced Duration Type A Testing Requirements Page 2 cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Branch 1

Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666 One James River Plaza Richmond, VA 23261 l