4
0CTOBER 16,1997
EA 97-453
Mr. Donald A. Reid
Senior Vice President, Operations
Vermont Yankee Nuclear Power Corporation
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
SUBJECT:
NRC INSPECTION REPORT 50-271/97 80 AND EXERCISE OF DISCRETION
Dear Mr. Reid:
This letter refers to the engineering inspection conducted from July 28,1997, to
August 22,1997, at the Vermont Yankee Nuclear Power Station. The purpose of the
inspection was to determine whether activities authorized by the license were condacted
safely, and in accordance with NRC requirements. At the August 22,1997, exit meeting,
,
the findings were discussed with Mr. Greg Maret and other members of your staff.
The inspection was directed toward areas important to public health and safety. The areas
!
examined during this inspection included: 1) your corrective actions in response to the
identification of Appendix R program issues; 2) your corrective actions regarding fire barrier
penetration seals; and 3) your evaluations of four previously identified NRC inspection
items.
We re.<iewed the circumstances surrounding your identification and corrective actions
regarding Appendix R issues bund in 1995 and 1996. Issues were identified by your staff
during a comprehensive Appendix R program review, started upon your discovery of similar
'
-
probierrs in 1995.
The probiams were violations of NRC requirements of 10 CFR Part 50.48, Appendix R,
Section Ill.G, which would normally be considered for escalated enforcement and subject
to a civil penalty. However, after consultation with the Director, Office of Enforcement,1
- have been authorized to not issue a Notice of Violation and not propose a civil penalty in
this case in accordance with the provisions of Section Vll.B.4 of the NRC's Enforcement
Policy. This decision was made after consideration that: (1) the violations were identified
by your staff as part of the corrective action for the previous Appendix R related issues
-with the RCIC, ADS and EDG systems; (2) they had the same root cause as the previous
issue; (3) they did not substantially change the safety significance or the character of the
regulatoy concern arising out of that finding; and (4) corrective actions, both taken and
planned, were comprehensive and reasonable. The exercise of discretion acknowledges
your effort to identify and correct subtle violations, that would not be readily identified by
routine efforts, before the degraded safety systems are called upon,
h
hlllllllllll N
kk
9710230008 971016
ADOCK 0500027*
- '>*
-
G
\\
.
-
.
..
. . .
-
.
. .
. - -
.-
.-
. _ _ __ j
-
.
.
..
.
.
.
..
.
-c
>-
.
Mr. Dona d Reid
2
Based on the results of this inspection, your corrective actions for four violations regarding
Appendix R program and fire barrier penetration seals were appropriately resolved and
-these items are closed. Your response to three related unresolved items were found
~
satisfactorily resolved and these items were closed, in addition, three unresolved items
associated with the electrical systems were found adequately resolved, and these items
-.were also closed.
No reply to this report is necessary and your cooperation with us is appreciated.
.
l-
Sincerely,
Hubert J. Milier
Regional Administrator
Enclosure: - NRC Inspection Report 50 271/97-80
- Docket No. 50-271
,
1
s
- _ _ _
.
.
.
.. ..
.
Mr. Donald Reid
3
cc w/ encl:-
R. McCullough, Operating Experience Coordinator - Vermont Yankee
R. Wanczyk, Director, Safety and Regulatory Afftirs
G. Maret, Plant Manager
J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts
D. Lewis, Esquire
G. Bisbee, Esquire
J. Block, Esquire
'
T. Rapone, Massachusetts Executive Office of Public Safety
State of New Hampshire, SLO Designee
State of Vermont, SLO Designee
Commonwealth of Massachusetts, SLO Designee
D. Katz, Citizens Awareness Network (CAN)
i
!
_
M
_ _ _ _ _ _ _
c:
=
. Mr. Donald Reid
4
-
' Distribution w/ encl:
Region i Docket Room (with concurrences)
PUBLIC
Nuclear Safety Information Center (NSIC)
NRC Resident inspector .
H. Miller, RA
W. Axelson, DRA
G. Morris, DRS -
C. Cowgill, DRP
l_
D. Bearde, DRP.
R. Bhatia, DRS
S. West, NRR/DSSA/SPLB
J. Lieberman, OE (EA No. 97 453, Section F8.4 and 8.5)
B. Summers, OE (EA No.97-453, Section F8.4 and 8.5)
D. Holody, ORA (EA No.97-453, Section F8.4 and 8.5)
D. Vito, ORA (Section E8.2 anc' 4)
'
C. Miskey,- DRS
J. Wiggins, DRS & L. Nicholson, DRS
Distribution w/enci (VIA E-MAIL):
R. Zimmerman, ADPR, NRR
F. Davis, OGC
A. Nicosia, OGC
J. Lieberman (OEMAIL)
D. Holody, OE
W. Dean, OEDO
K. Jabbour, NRR
S. Bajwa, NRR
R. Correia, NRR
F. Talbot, NRR -
Inspection Program Branch,'NRR (IPAS)
-
DOCDESK
-
q1
ff
NP*
/
b
W
O
yd N
6VAp\\
[ DOCUMENT NAME: A:WY9780. INS
T3 receive a ecq.y of this document. Indieses in the boa: 'C' = Copy without attach,nent/ enclosure
'E' = C
th attac
rpenclosure
- N* = No copy
OFFICE -
Rl/DRS '
]
Rl/DRS / h JId;; Rl/DRP [f4-l
Rl/DRS/ 'f6 l
Rl/R$@ :l
'
-
NAME-
RBhatia : %
WRuland9 %
CCowgill'
JWiggfrfs
HMill40 y
DATE
10/14/97--
10/W/97
10/t F/97
10/fe/97
10//f/97 '
OFFICIAL RECORD COPY
hhhl
u