Northern States Power Company 414 Nicollet Mall Minneapoks. Minnesota 55401 Telephone (612) 330-5500 February 20, 1987 Prairie Island Technical Specification 4.12.E.2 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PIANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Unit 2 Inservice Inspection Summary Report Attached for your review are four copies of the report, " Prairie Island Nuclear Generating Plant - Unit 2, Inservice Inspection - Examination Summary, October 20, 1986 to November 19, 1986" This is the second inservice inspection conducted for inspection period one of the second ten year interval.
This report identifies the components examined, the examination methods used, the examination number and summarizes the examination results of each of the following areas:
1.
Pressure retaining components and supports of the reactor coolant and associated systems classified as ASME Class 1 and ASME Class 2.
2.
FSAR Augmented Examinations 3.
Eddy current examination of Steam Generator tubing.
Four tubes in No. 21 steam generator and twenty tubes in No. 22 steam generator were mechanically plugged.
The evaluation of the results from the inservice examinations indicated that integrity of these systems has been maintained.
0703030147 870220 PDR ADOCK 05000202 a
eDn N
Q go
, 2,
.o US Nuclear Regulatory Commission February 20, 1987 N SWPow W Page 2 This report is being submitted in accordance with the Prairie Island ASME Code Section XI Inservice Inspection and Testing Program. As noted in that program, submittal of the attached summary is intended to satisfy the inspection reporting requirements contained in IWA-6220 of Section XI of the ASME Code.
b e[ D Nwa, David Musolf Manager - Nuclear Support Services DHM/EFE/efe c: Regional Administrator-III, NRC (2 copies of attachment)
NRR Project Manager, NRC (1 copy of attachment)
Resident Inspector, NRC (w/o attachment)
G Charnoff (w/o attachment)
H Baron, Chief Boiler Insp., State of MN (1 copy of attachment)
S Tact, Hartford Ins. (1 copy of attachment)
Attachment
{
l l
l 1
I i
4 I
I
u FSPW PRAIRIEISLAND NUCLEAR GENERATING PLANT 9
Red Wing, Minnesota UNITS 1 AND 2 h
"'fi U.'U.
INSERVICE INSPECTION - EXAMINATION
SUMMARY
's OCTOBER 20, 1986 TO NOVEMBER 19, 1986 f4 REFUELING OUTAGE 12 INSPECTION PERIOD 1 SECOND INTERVAL NORTHERN STATES POWER COMPANY MINNE APOLIS, MINNESOTA Report Date:
Commercial Service Date:
January 20,1987 December 20, 1974 L.........