Text
I Georgia Power Company Post Offica Box 282 Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Company Services,Inc.
Fbst Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 gp gg December 10, 1986 Director of Nuclear Reactor Regulation File: X7BLO1 Attention:
'Mr. B. J. Youngblood Log:
GN-1227 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER OPEN ITEM 1: EQUIPMENT QUALIFICATION
Dear Mr. Denton:
As requested during a conference call with your staff on December 8,1986, Georgia Power Company is providing clarification on the Auxiliary Feedwater Pumphouse temperature. The clarifications are annotated on the attached sheet from FSAR subsection 9.4.8.
The environmental conditions in FSAR table 3.ll.B.1-1 are correct as shown on sheet 69 of 84 for the Auxiliary Feedwater Pumphouse. The clarifications on the attached sheet will be incorporated into the next FSAR amendment.
If your staff requires any additional information, please do not hesitate to contact me.
Sincerely,
~
l'J. A. Bailey Project Licensing Manager JAB /sm Attachment xc:
R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. A. McManus M. A. Miller (2)
L. T. Cucwa B. Jones, Esquire Vogtle Project File g
G. Bockhold, Jr.
d 09217 g\\
8612190272 861210
{DR ADOCK 05000424 PDR I
VEGP-FSAR-9
)
9.4.8.1.2 Power Generation Design Bases The auxiliary feedwater pumphouse normal HVAC system maintains the turbine-driven auxiliary feedwater pump room below a maximum temperature of 120*F during-ncrm:1 plant operation and=
l29 m a i n t : :_r r e_;.
U O
W HEM THE TURBIME PRtvetJ A UXILI ARY FeroWATeR Foup i s oPERATIPri. PURtN4 b)ORMA L-TLAtJr OPeRATiotJ u)HEA) TH E j
TOR 8:WE PRiVErJ fvMP is 007 oPERADV6; THE Mhitna)M TEMPEP-AToRE IS M A'OTAI N ED DElos) 104 *F.
i O
Q i
l
\\
\\
I l
Amend. 14 2/85 l
9.4.8-la Amend. 29 11/86