Monthly Operating Rept for Nov 1986
ML20211Q435
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/30/1986
From: Climer, Will Smith, Svenson B
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8703030090
Download: ML20211Q435 (6)


Text

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 12/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period NOV 86 l notes l
3. Licensed Thermal Power (MWt) 3411 l l

4.

Name Plate Rating (Gross MWe) 1133 l l

S. Design Electrical Rating (Net MWe) 1100 l l

6. Maximum Dependable Capacity (GROSS MWe) 1100 l l
7. Maximum Dependable Capacity (Net MWe) 1060 -----------------------

8.

If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons

9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 8016.0 78144.0
12. No. of Hrs. Reactor Was Critical 720.0 4816.5 53845.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator.on Line 720.0 4645.7 52499.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 1974208 12381538 163652148
17. Gross Elect. Energy Gen. (MWH) 635860 3864850 53551440
18. Net Elect. Energy Gen. (MWH) 609242 3696366 51595635
19. Unit Service Factor 100.0 58.0 69.4
20. Unit Availability Factor 100.0 58.0 69.4
21. Unit Capacity Factor (MDC Net) 79.8 43.5 64.3
22. Unit Capacity Factor (DER Net) 76.9 41.9 62.8
23. Unit Forced Outage Rate 0.0 3.9 14.9
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Technical Specification required surveillance ouy ge. March. 1987, est.imatgd._,

2-week duration.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8703030090 86113o DR ADOCK 05000316 PDR dr

i AVERAGE DAILY POWER LEVEL (MWe-Net).

DOCKET NO.

50-316 UNIT TWO DATE 12/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 MONTH DEC 86 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1

823 17 853 2

828 18 351 3

833 19 851 4

834-20 853 5

833 21 853 6

835 22 847 7

833 23 849 8

836 24 853 9

844 25 852 10 843 26 855 11 847 27.

853 i.

12 848 28 857 i

13 850 29 855 14 853 30 857 15 854 31 0

16 852

i 50-316 IMW:KEI No.

ilNIISittifHOWNS AND POWl:.H HEDINTIONS U NII N AhlE D.C. Cook-Uni _t 2

12-8-86 DA1E November, 1986 COkiPI ETED hY B.A. Svensson NI PORT AlpN HI TEl.EPilONE 616/465-5901 "L

w c

I icensee g e,,

{'.'t

.E E

}

} y}

Cause & Cinaccsive l

No.

Dale Q

Eg P,

_c 5 g4 livene g7 f'3 n

Atn.us so Psevcsit Hcciissenice

$3 E,

  • gy, Hep <ns
  • in O b

l 6

There were no unit shutdowns or None power reductions during the month.

The unit operated at a nominal 80%

,1 power limit administrative 1y im-l posed to minimize steam generator I

tube degradation.

l l

I l

l l

l l

1 i

i 2

3 4

i l~: l'in ccJ lteason; blesluml:

Esloliis G. Instsucel.wis l

S: Sil.celulcol A 1 quipmesu l ailuse ll.aplain) 1 -klasmal fus Psepasations of Data H klaintenance os Test 2 klanual Suam.

linesy Slicess fue liensee C Ncfueling 3-Automatic Sasam.

livesis Hepius il l'HI17ile (NilHI G-D Hegulatiny Hesisiction

-l Ollies Ilimplain) 01(ii)

I' Opesatos Isaining& ikenw I xaminallan 1 Asinunisteative 5

G Opesationaal 1:ssus liixplaisil blieliel I - Same Smuce rs/11)

II Ollies liimplain)

Docket No.:

50-316 Unit Names D.C. Cook Unit 2 Completed By:

D. A. Bruck Telephone:

(616) 465-5901 Date:

December 8, 1986 Page:

1 of 1 MONTHLY OPERATING ACTIVITIES - NOVEMBER, 1986 HIGHLIGHTS:

The reporting period began and ended with the reactor at 80%

rated thermal power.

The unit operated the entire month with no significant operating problems or power reductions.

Gross electrical generator for the month of November was 635,860 MWH.

SUMMARY

There were no significant operating activities during the month of November.

~

DOCKET NO.

50 - 316 UNIT NAME D. C. Cook - Unit No. 2 DATE 12-8-86 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE NOVEMBER, 1986 There were no significant Safety-Related Maintenance Items during the month of November.

v

\\~

f.

' ( ' ;*_.

INDIANA & MICHIGAN ELEMRIC3 COMPANY

ysteer, Oonald C. Cook Nuclear Plant P.O. Box 458, Bridgman, Mch$an 49106 December 5, 1986 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear plant Unit 2 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of hovember, 1986 is submitted.

Sincerely, h/

W. G. Smith, Jr.

Plant Manager WGS:ab Attachments cc: