E MEMORANDUM TO: Sturrt A. Richirds, Director september 3, 1999 Project Direct: rata IV & Decommissioning
]
Division cf Licensing Project M: nag;m:nt Office of Nuclerr R::ctor Regulation FROM:
Jack Cushing, Project Manager, Section 2 /3/
Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation SUDJECT:
MEETING WITH THE CE OWNERS GROUP ON TOPICAL REPORT CE NPSD-1167 The Nuclear Regulatory Commission (NRC) held a meeting with the CE Owners Group (CEOG) on August 19,1999, to discuss topical report CE NPSD-1167, " Elimination of Pressure Sensor Response Time Testing Requirements (CEOG Task 1070)." A list of attendees is attached.
Specifically, CEOG was asked to discuss the methodology used in the topical report.
The CEOG representative, Mr. McQuade, began the meeting with a short discussion of the proposed methodology. The Electric Power Research Institute (EPRI) report, "NP-7243 Investigation of Response Time Testing Requirements," is the basis for topical report CE NPSD-1167. The EPRI report provides two options for the methodology to determine the response time for an instrument model. The options are: (1) licensee measured response j
time, and (2) published vendor response time. The CEOG report uses licensee measured I
instrument response time data for each instrument model. The data showed discrepancies between response times for the same instrument models. The reason for the discrepancy is that some of the licensee's data included components other than the instruments, such as bi-stables. Mr. McQuade stated that the CEOG has decided to use published vendor data for Barton and Rosemont instruments. Foxboro instruments, for which there is no published vendor response time data, will use licensee measured response time data.
The CEOG will resubmit the topical report within approximately two weeks reflecting the above changes.
The effect on the review schedule of CEOG requested changes was discussed and it was concluded that the review schedule could accommodate the changes, since use of published vendor data will simplify the review.
Attachment:
Attendance List cc w/att: See next page h h MM h(
DISTRIBUTION:
Hard Coov EMail Docket File JCushing JZwolinski/SBlack AMarinos f
PUBLIC OGC SDembek PLoeser PDIV-2 Reading ACRS EPeyton GTracy j;
g(0 To receive a copy of tnis document, indicate "c" in the Dox OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME JCushing:rb$ EPeytN SDembek 4
DATE 7 / $l /99 Cl /E /99 7 / 3 /99
'Q - h - 1 DOCUMENT NAME: G:\\PDIV-2\\CEOG\\msum0819.wpd OFFICIAL RECORD COPY
,3g 9909150038 990903 PDR TOPRP ENVC-E C
- pwat, O"
4 UNITED STATES
{
,j NUCLEAR REGULATORY COMMISSION o
t WASHINGTON, D.C. 20066-0001
%,,,g #
September 3, 1999 MEMORANDUM TO; Stuart A. Richards, Director Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Jack Cushing, Project Manager, Section 2 Project Directorate IV & Decommissionin 9
Division of Licensing Project Managemen
/
Office of Nuclear Reactor Regulation
SUBJECT:
MEETING WITH THE CE OWNERS GROUP ON TOPICAL REPORT I
CE NPSD-1167 I
The Nuclear Regulatory Commission (NRC) held a meeting with the CE Owners Group (CEOG)
{
on August 19,1999, to discuss topical report CE NPSD-1167, " Elimination of Pressure Sensor Response Time Testing Requirements (CEOG Task 1070)." A list of attendees is attached.
Specifically, CEOG was asked to discuss the methodology used in the topical report.
The CEOG representative, Mr. McQuade, began the meeting with a short discussion of the proposed methodology. The Electric Power Research Institute (EPRI) report, "NP-7243 Investigathn of Response Time Testing Requirements," is the basis for topical report CE NPSD-1167. The EPRI report provides two options for the methodology to deterndr,e the responsa time for an instrument model. The options are: (1) licensee measured response time, and (2) published vendor response time. The CEOG report uses licensee measured instrument response time data for each instrument model. The data showed discrepancies between response times for the same instrument models. The reason for the discrepancy is that some of the licensee's data included components other than the instruments, such as bi-stables. Mr. McQuade stated that the CEOG has decided to use published vendor data for Barton and Rosemont instruments. Foxboro instruments, for which there is no published vendor response time data, will use licensee measured response time data.
The CEOG will resubmit the topical report within approximately two weeks reflecting the above changes.
The effect on the review schedule of CEOG requested changes was discussed and it was concluded that the review schedule could accommodate the changes, since use of published vendor data will simplify the review.
Attachment:
Attendance List cc w/att: See next page
CE Owners Group cc:
Mr. Charles B. Brinkman, Director Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330
]
Rockville, Maryland 20852 Mr. Gordon C. Bischoff, Project Director CE Owners Group ABB Combustion Engineering Nuclear Power M.S. 9615-1932 2000 Day Hill Road Post Office Box 500 Windsor, CT 06095 Mr. Ralph Phelps, Chairman CE Owners Group Omaha Public Power District P.O. Box 399 Ft. Calhoun, NE 68023-0399 i
I
LIST OF ATTENDEES NRC/CE OWNERS GROUP MEETING ON CE NPSD-1167 August 19,1999 NAME ORGANIZATION Paul Loeser NRR/DE/EElB Jack Cushing NRR/DLPM/PDIV-2 Donald McQuade ABB/CENP NRR = Office of Nuclear Reactor Regulation DE = Division of Engineering EElB = Electrical & Instrumentation and Controls Branch ATTACHMENT
.