ML20211Q269
| ML20211Q269 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/30/1986 |
| From: | Behnke C, Lemons J BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8612190231 | |
| Download: ML20211Q269 (14) | |
Text
_ _ - _ _ _ _ _ _
e 1
tlpilT SIRffDutetS AIS) P(AGR RElltJCT109tS IIOCKET 100.
50-317
~
UlHT HAPE Calvert Cliffs 1 l
i IMTE December 7, 1986 j
CfDE'IEIED BY C. Behnke I
REltlRT DEMrfH November. 1983 TEI.F N. 301-260-4871 m
I er S
=~
es can U,n s & Correct.tve O e
- o I. i regimw-p -t i
co
+ :.
O t+n 4
?l.
u2 c
ouo I vent.
u o 2t Acts.on t.o N..
Dat c
-o Reguirt #
,g't m,j gU l'avvent Recierernce s
n-n
.) x l
y;g w
6
.w u
d5 1
1 1
I 86-10 861101 S
720 C
4 NA ZZ ZZZZZZ Continued shutdown for refueling i
and 10 year ISI
,1 J
l i
i' 8612190231 861130 PDR ADOCK 05000317 R
PDR i
I I
I I
i 1
3 4
l':
t oitwl Reawwn:
H tluxt:
Esliiliit G-Inst auctions
~
j S: Se Iwwhilevi A-lipigmw nt. l'ailiare (INplain) 1 -Munna t fon* Preparatiews of Ikit,a i
IMlaint enasw e or 'lest.
2-Runsal Scram.
Ent.ry Slicete foe I.icers-l C-Refneling 3-Aint urnat.ic Scram.
Event Regwit t, (11R) File N
D-Remilat ory Rest rict.ien 4-Of lier (Explain)
( NIRIM-0161 )
j q
I'.-thw rat or Training & l.irense I;x:wninat,ient g@
F-Ankninist rat ive 5 Exliil>it.1 - same stuure G4hx rat ional friwir (Explain) ll-Otlier (laplain)
}
i
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 Dates December 7, 1986 Completed by C.
Behnke Telephonet (301) 260-4871 NOVEMBER
- e*
Average Daily Power Level Average Daily Power Level Ra.y (MWe-Net)
Day (MWe-Net) a 1
0 17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
OPERATING DATA REPORT Docket No. 50-318 Date:
December 7, 1986 Completed by C.Behnke Telephone: (301) 260-4871 OPERATING STATUS
- e****e****
- 1. Unit Name:
Calvert Cliffs No. 2
- 2. Reporting Period:
NOVEMBER
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplata Rating (Gross MWe):
918
- 5. Design Electrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross Mwe):
860
- 7. Maximum Dependable Capacity (Net MWe):
825
- 8. Change in Capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720 8,016 84,744
- 12. Number of Hours Reactor was Critical 720.0 7,699.0 71,242.0
- 13. Reactor Reserve Shutdown Hours 0.0 35.9 1,296.6
- 14. Hours Generator On-Line 720.0 7,664.7 70,076.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,931,131 19,836,517 176,318,553
- 17. Gross Electrical Energy Generated (MWH) 648,313 6,640,497 58,162,021
- 18. Net Electrical Energy Generated (MWH) 621,906 6,357,990 55,508,247
- 19. Unit Service Factor 100.0 95.6 82.7
- 20. Unit Availability Factor 100.0 95.6 82.7
- 21. Unit Capacity Factor (Using MDC Net) 104.7 96.1 79.4
- 22. Unit Capacity Factor (Using DER Net) 102.2 93.9 77.5
- 23. Unit Forced Outage Rate 0.0 4.1 5.9
- 24. Shutdowns Scheduled Over Next Six Months (type, date and duration): Refuel-ing Shutdown:
March 14, 1987 to May 22, 1987 (69 days)
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
UNIT SIRfm0WNS AND POWER REDUCTIONS IXXXIX NO.
50-318
~~
UNIT NAPE... Calvert Cliffs 2 DATE December 7, 1986 COPFIETED BY C. Behnke REIVRT M Nill November. 1986 TElIPHONE 301-260-4871 m
L o
4 c-ei o tr u
=
oz
=
co I,icensee E
otn C4uise & C,orrective H
o "O -H c c -t C o No.
Date d"
u:
z oao I,,ven t uo Qt A<t, ton to x
eo n
. ve z%
o
$~
ii55 D(o H
L ::
o u
Regwirt #
xo Prevent, Reciarrence 8
NA No shutdowns or significant reductions to report
- /
s s
~,
w
, -l i
l
- s
.g I
r: I..rce<1 Reason hk't fy&- %
Exhil>ib G-Instnict, ions s;-
3: Sciu cliilc<l A-E<guipment. l'ai {iir e (Explain) 1 -blanimal for Preparation of Dab,a 2-Flannial Scram.
Erptry Slicet s for I.ic3nse -
[1-Maint enance or Test.
C-Refucii2g
)
^ 3-Ant <wnatic Scram.
1: vent Report, (11R) F! te ?
D-Regniator y Rest rict. ion
~4-Uther (Ex;;1ain)
-( AliREG-0161 )
E-Ogx ralor Iraining & I,irense Examination
-JA N
G-Ogwmational Error (Explain)
~
Q,,{
1'-A<lminist rat ive s 5 e Exh i h i t, 1 - Same.9 xirce m
. ~,-
x Il-Ot. hen,- (Explain) s c
x
.-~
p%
9
... u -
~
~
vi._
m m
f.
f AVERAGE DAILY UNIT POWER LEVEL s
Docket No. 50-316 Calvert Cliffs' Unit No. 2 Date:
December 7, 1986 completed by c. Behnke Telephone: (301) 260-4871 NOVEMBER s
Average Daily Power Level Average Daily Power Level Day (MWe-Net) pgy (MP's-Net )
1 864 17 869 2
862 18 871 3
860 19 870 4
861 20 869 5
862 21 870 6
862 22 871 7
863 23 872 8
864 24 872 9
863 25 871 10 863 26 871 l
11 863 27 870 l
12 865 28 872 13 866 29 872 l
i 14 865 30 872 15 857 l
16 784 l
w
-)
q t'
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE e
s.
NOVEMBER 1986 s,.
Unit 1 was shutdown for refueling throughout this reporting period.
i M
i s
v
). 1;
'i i
e
?
4 A
y,_,._m m,,.
-,7,,
,,.y.-,,,,,,.,,y, e
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE NOVEMBER 1986 11/1 Unit 2 began this reporting period at full reactor power (860 MWe).
11/15 At 2205 Unit 2 began decreasing power to 590 MWe for 21 Steam Generator Feed Pump (SGFP) testing and Condenser Waterbox cleaning.
11/16 At 0500 SGFP testing was completed and power was increased to 780 MWe.
At 1135 the Unit returned to full reactor power (860 MWe).
11/30 The Unit ended this reporting period at full reactor power (860 MWe).
December 4,1986 REFUELING INFORMATION REQUEST i
1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. I 2.
Scheduled date for next Refueling Shutdown: October 25,1986 3.
Scheduled date for restart following refueling: January 4,1987 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will not require changes to Technical Specifications.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
September 29,1986 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuelinserted into the previous cycle.
i 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 998 Spent Fuel Pools are common to Units 1 and 2 8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b)0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991 I
t i
i
December 4,1986 REFUELING INFORMATION REOUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: March 14,1987.
- 3. Scheduled date for restart following refueling: May 22,1987.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 13,1987
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuelinserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 998 Spent Fuel Poolis common to Units I and 2.
l
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
(a) 1830 (b)0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
4 April,1991 l
l 4
)
~
OPERATING DATA REPORT Docket No. 50-317 Date:
December 7, 1986 completed by C.
Behnke Telephone: (301) 260-4871 OPERATING STATUS (REVISION)
- 1. Unit Name:
Calvert Cliffs No. 1
- 2. Reporting Period:
OCTOBER
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplate Rating (Gross MWe):
918
- 5. Design Electrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross Mwe):
860
- 7. Maximum Dependable Capacity (Net MWe):
825
- 8. Change in Capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 745 7,296 100,669
- 12. Number of Hours Reactor was Critical 559.4 6,906.2 79,807.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,019.4
- 14. Hours Generator On-Line 543.0 6,856.4 78,215.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,439,508 18,206,202 195,530,395
- 17. Gross Electrical Energy Generated (MWH) 480,377 6,087,181 64,689,993
- 18. Net Electrical Energy Generated (MWH) 458,359 5,830,803 61,747,098
- 19. Unit Service Factor 73.0 94.0 77.7
- 20. Unit Availability Factor 73.0 94.0 77.7
- 21. Unit Capacity Factor (Using MDC Net) 74.6 96.9 74.7
- 22. Unit Capacity Factor (Using DER Net) 72.8 94.6 72.6 l
- 23. Unit Forced Outage Rate 5.6 3.8 8.6
- 24. Shutdowns Scheduled Over Next Six Months (type, date and duration):
None
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
01/04/87
OPERATING DATA REPORT Docket No. 50-318 Dates December 7, 1986 Completed by C.Behnke Telephone: (301) 260-4871 OPERATING STATUS (REVISION)
- 1. Unit Name:
Calvert Cliffs No. 2
- 2. Reporting Period:
OCTOBER
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplate Rating (Gross MWe):
918
- 5. Design Electrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross Mwe):
860
- 7. Maximum Dependable Capacity (Net MWe):
825 8.
Change in capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 745 7,296 84,024
- 12. Number of Hours Reactor was Critical 745 6,979.0 70,522.0
- 13. Reactor Reserve Shutdown Hours 0.0 35.9 1,296.6
- 14. Hours Generator On-Line 745 6,944.7 69,356.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,980,264 17,905,386 174,387,422
- 17. Gross Electrical Energy Generated (MWH) 657,214 5,992,184 57,513,708
- 18. Net Electrical Energy Generated (MWH) 630,025 5,736,084 54,886,341
- 19. Unit Service Factor 100.0 95.2 82.5
- 20. Unit Availability Factor 100.0 95.2 82.5
- 21. Unit Capacity Factor (Using MDC Net) 102.5 95.3 79.2
- 22. Unit Capacity Factor (Using DER Net) 100.1 93.0 77.3
- 23. Unit Forced Outage Rate 0.0 4.5 6.0
- 24. Shutdowns Scheduled Over Next Six Months (type, date and duration): Refuel-ing shutdown: March 14, 1987 to May 22, 1987 (69 days)
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 Date:
December 7, 1986 Completed by C. Behnke Telephone: (301) 260-4871 OCTOBER (REVISION)
Average Daily Power Level Average Daily Power Level
_D_ay (MWe-Net)
Day (MWe-Net) 1 849 17 846 2
848 18 712 3
848 19 781 4
850 20 836 5
847 21 838 6
848 22 853 7
852 23 859 8
852 24 859 9
853 25 857 10 854 26 859 11 855 27 859 12 858 28 858 13 857 29 857 14 843 30 860 15 850 31 862 16 859 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest while megawatt.
BALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 NUCLEAR OPERATIONS DEPARTMENT CALVERT CUFFS NUCLEAR POWER PLANT LUSBY. MARYLAND 20657 December 7, 1986 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20055 Attention:
Document Control Desk
Subject:
November Operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)
Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
If there are any questions, please contact Carl Behnke, (301) 260-4871.
Sincerely, J. R.
Lemons Manager-Nuclear Operations Department JRL/CB/jla Enclosures cc:
M. Beebe (NRC)
V.
P. O'Grady (BG&E)
E. K. Bewley (BG&E)
D. Reilly (INPO)
T.
Foley (NRC)
P. Ross (NRC)
K. Gibbard (DOE)
J. A. Tiernan (BG&E)
S. A. McNeil (NRC)
E. Wenzinger (NRC)
W. J. Lippold (BG&E)
Technical Librarian T. Magette (DNR)
File K. Gromack (CE) gM
<//
~
OPERATING DATA REPORT Docket No. 50-317 Date:
December 7, 1986 Completed by C.
Behnke Telephone: (301) 260-4871 OPERATING STATUS
- 1. Unit Name:
Calvert Cliffs No. 1
- 2. Reporting Period:
NOVEMBER
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplate Rating (Gross MWe):
918
- 5. Design Electrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross Mwe):
860
- 7. Maximum Dependable Capacity (Net MWe):
825
- 8. Change in Capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720 8,016 101,389
- 12. Number of Hours Reactor was Critical 0.0 6,906.2 79,807.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,019.4
- 14. Hours Generator On-Line 0
6,856.4 78,215.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0 18,206,202 195,530,395
- 17. Gross Electrical Energy Generated (MWH) 0 6,087,181 64,689,993
- 18. Net Electrical Energy Generated (MWH) 0 5,830,803 61,747,098
- 19. Unit Service Factor 0.0 85.5 77.1
- 20. Unit Availability Factor 0.0 85.5 77.1
- 21. Unit Capacity Factor (Using MDC Net) 0.0 88.2 74.1
- 22. Unit Capacity Factor (Using DER Net) 0.0 86.1 72.1
- 23. Unit Forced Outage Rate 0.0 3.8 8.6
- 24. Shutdowns Scheduled Over Next Six Months (type, date and duration):
None
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
01/04/87