__-__ ___

e

=

s October 15, 1997 Mr. William E. Cummins, General Manager New Plant Projects Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230 SU3 JECT: SUBMITTAL DATES FOR INFORMATION REQUIRED TO SUPPORT THE REVIEW OF THE AP600 DESIGN

Dear Mr. Cummins:

During the September 10,1997 meeting, Westinghouse committed to provide submittal dates to the staff for several expected submittals. Since that meeting, Westinghouse has also committed to submit additionalinformation on a variety of other issues (see enclosure). These submittals are key to the staff completing its review of the AP600 in a timely manner. As discussed during the September 10,1997 meeting, the staff is developing a revised review schedule for the AP600. In order for the staff to determine the revised review schedule, Westinghouse should formally submit its planned submittal dates for the items listed in the attachment as well as other submittals that Westinghoura anticipates submitting to support the review. This should include submittal dates for all outstanding requests for additionalinformation.

We request that you submit your proposed submittal dates within one week of receipt of this letter in order to support the issuance of the revised review schedule to the Commission, if you have any questions regarding this matter, you can contact Thomas J. Kenyon at (301) 4151120.

J Sincerely, Original signed by:

Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Managemant Office of Nuclear Reactor Regulation Docket No. 52 003

Enclosure:

As stated cc w/ encl: See next page DISTRIBUTION:

Docket File PDST R/F JWRoe

.)

PUBLIC DMatthews TRQuay TKenyon WHuffman JSebrosky

\\

DScaletti JNWilson JMoore,0-15 B18 13 WDean,0 5 E23 ACRS (11)

J DOCUMENT NAME: A:\\TKSCHED.LTR To receive a copy of,tys document, Indicate in the box: "C" = Copy without attachment /enclosyrG AE" = Copy with attachment / enclosure "N" = No copy 4

l OFFICE PM:PDb":DRPM l D:PDST:DRPV,3 _

l l

NAME-TJKen)bh:sg TRQuay1]A DATE 10/F/97 104(/97

w. m u 9710220071 971015
o"

^oocko52o=3 I.l I.t l.l,l Il.l 1.ll1 ll

7 " c m s ' s+ esa w

e Mr. Brian A. McIntyre Docket No.52-003 Westinghouse Electric Corporation AP600 cc: Mr. Nicholas J. Liparuto, Manager Mr. Russ Bell Nuclear Safety and Regulatory Analysis Senior Project Manager, Programs Nuclear and Advanced Technology Division Nuclear Energy Institute Westinghouse Electric Corporation 1776 l Street, NW P.O. Jox 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006 3706 Mr. Cindy L. Haag Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sterling Franks GE Nuclear Energy U.S. Department of Enercy 175 Curtner Avenue, MC-754 NE 50 San Jose, CA 95125 19901 Germantown Road Germantown, MD 20874 Mr. Robert H. Buchholz GE Nuclear Energy Mr. Frank A. Ross 175 Curtner Avenue, MC-781 U.S. Department of Energy, NE-42 San Jose, CA 95125 Office of LWR Safety and Technology 19901 Germantown Road Barton Z. Cowan, Esq.

Germantown, MD 20874 Eckert Seamans Cherin & Mellott 600 Grant Street 42nd Floor Mr. Charles Thompson, Nuclear Engineer Pittsburgh, PA 15219 AP600 Cer1ification NE 50 Mr. Ed Rodwell, Manager 19901 Germantown Road PWR Design Certification Germantown, MD 20874 Electric Power Research Institute 3412 Hitiview Avenue Palo Alto, CA 94303 Mr. Brian A. McIntyre Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit l

Box 355 Pittsburgh, PA 15230 l

l

EXPECTED AP600 SUBMITTALS 1.

Response to the staffs concems related to the shutdown evaluation report; 2.

Response to the staff's concems related to Chapter 15 analysis; 3.

Revision to RTNSS WCAP 13856, and formal response to staffs comments on RTNSS availability controls; 4.

Response to the staffs concems related to ASME classification of the CVCS system piping; 5.

Response to the staffs concems related to testing of pressure isolation valves; 6.

Submittal of proposed design of CMT levelinstrumentation; 7.

Response to the staffs letter on safety classification of containment coatings; 8.

Pevision to Emergency Response Guidelines, and formal response to ERG discussion items; 9.

Response to the staffs concems on spent fuel pool cooling;

10. Markup of SSAR Section 9.5.1 and the fire hazards analysis;
11. Information to support the upcoming meeting on the seismic margins analysis;
12. Additional analysis supporting the basemat design referenced in a September 12,1997 letter from Westinghouse;
13. Responses to all other outstanding RAls; and
14. Remaining anticipated SSAR revisions, including tiie final SSAR revision on ITAAC.