Mod 13 to Contract NRC-26-96-265
ML20211Q011
Person / Time
Issue date: 08/30/1999
From: Barnes B, Pool S
NRC OFFICE OF ADMINISTRATION (ADM), SIMULATION, SYSTEMS & SERVICES TECHNOLOGIES CO.
To:
References
CON-FIN-R-9900, CON-NRC-26-96-265 NUDOCS 9909140164
Download: ML20211Q011 (3)


Text

.. .e .

C. D

' AMENDMENT CF SOLICITATi3N/ MODIFICATION CF CONTRACT

"'"^''" "' "^

2. AMENDMENT / MODIFICATION NO.

I .l3

3. EFrECTIVE DATE 4. REQUISITION / PURCHASE REQ. NO. s. PROJECT NO. (if appheabl.1 13 8-25-1999 AED-96-265/EDO99309
s. ISSUED BY 7. ADMINISTERED BY lit oth.t than fteen si (LS. Nuclear Regulatory Commission Division of Contracta and Property Mgt.

Attna T-7-I-2

/ M shington DC 20555' O. NAME AND ADDRESS OF CONTRACTOR (No., .tr..t. county, state and ZIP Codel (X) SA. AMENDMENT OF sOLICITAflON NO.

~

GSE Power Systema, Inc. 9B. DATED ISEE ITEM 10 9189 Red Branch Road 10A. MOOlFICATION OF CONTRACT / ORDER NO, Con # NRC-26 96-265 10e. DATED (SEE (TEM 13)

CODE lFACILtTY CODE I 06-12-1996 11.' THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS j O The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, Cis not extend Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation Or as amended, by one of the following methods:

(1) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the eff t submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECElVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY l

' RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to ch nge an offer already submitted, such change may be made by telegram or letter. provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND AFPROPRIATION DATA (tr e.qu6r.dl EDO99309 97M40401440 R9900 RS.1 252A $233,604

\

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

C3 A. THis CHANGE ORDER Is ISSu!D PURSUANT TO: ($p. city autherttyi THE CHANGES SET FORTH fN ITEM 14 AftE MADE IN THE CONTRACT ORDER NO IN ITEM 10A.

S. THE ASOVE NUM0ERED CONTr SCT/OftDER ts MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paving office, appropnotion data, etcJ SET FOflTH IN ITEM 14. PURSUANT TO THE AUTHORITY OF FAR 43.103tbl.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FAR 52.243-2 Changes - Coat Reimbursement x .

D. OTHER ($pwfy type of modificahon and authontyt E. IMPORTANT: Contractor Ois not, x is required to sign this document and return two copies to the issuing office.

14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organised by UCF sechen headings. Including ochcatahon/ contract subsect matter where feasibl.)

SIe attached continuation sheeta.

I N000 . .

E .c.pt p.o_ t .n. . o, _ nt t.te_.~.. . .r , . .a - t.,0 c.,... r a _h., .n. . .u. o.c. .n. ..t .

1sA. NAME AND TITLE Or slGNER (Type or pant) 1sA. NAME AND TITLE OF CONTRACTING OFFICER (Typ. or pnnt}

Brian E. Barnes gg RACTOR/ OFFEROR 1sC DATE stGNED Lam -  :: - NRICA 16C. DATE slGNED

,si L

t.re of 10.., M, qnn e

,Y -

h f'M,m.a..otC.t-i, .

l.n , ..-,.,,,,

\

l 9909140164 990830 5'^"o^" ' ** ia" ' " 8' PDR CONTR NRC-26-96-265 PDR

m NRC-26-96-265 13 CONTINUATION PAGE I The purpose of this contract _ modification is (1) to incorporate a within ecope change:for travel support GAN personnel to attend SAT at St.

Petersburg, (2) to provide an equitable adjustment in cost and fee to the contractor for a performance delay caused by the lack of government funding, (3) to adjust the contract estimated cost for the definitization of the subcontract.to provide facilities modifications to the St. Petersburg site

for analytical simulator, (4) and to provide the final allotment of funds to complete funding of the contract. Accordingly, the contract is hereby modified as follows:
1. The-contract estimated cost is increased by $20,659 and the fixed fee is increased by $1,549.for the contractor to provide travel support including the payment for all allowable travel expenses for 2 GAN engineers and one operator from the Kursk NPP to travel to GAN St. Petesburg site for 30 days for SAT. In addition, The Contractor will provide travel support for 3 additional GAN engineers to travel from Moscow to St. Petersburg for SAT for 7 days.
2. The NRC hereby provides the contractor with an increase to the estimated cost in the amount of $41,439 and in the fixed fee in the amount of $3,108 due to the additional time required for shutting down and restarting performance due to delays in the Government's allotment of funds to this contract.
3. The contract estimated cost is hereby increased by $16,926 ($24,926 less

$8,000 in original proposal) for the final firm fixed subcontract price egreed upon for the facilities modification work to be completed at GAN St.

Petersburg, Russia for the analytical simulator.

4. As a result of items nos. 1, 2, and 3 above, the estimated cost and fixed fee of the contract is increased as shown below:

Thru Mod 12 Increased by Mod 13 New Contract Totals Est Cost- $4,630,663 $79,024 $4,709,687 Fixed Fee $ 343,447 $ 4,657 $ 348,104 CPFF $4,974,110 $83,681 $5,057,791

5. In support of items nos. 1, 2 ans 3 above and to fully fund this contract, $233,604 is hereby hereby allotted to this contract. As a result of this allotment of funds and item no. 4 above, Section B.3 " Consideration and Obligation" is hereby replaced by the revised Section B.3 below:

B.3 CONSIDERATION AND OBLIGATION--COST PLUS FIXED FEE (JUN 1988)

(a) The total estimated cost to the Government for full performance of the contract (basic contract and all exercised options) is'$5,057,791 of which the sum of $4,709,687 represents the estimated reimbursable costs, and of which $348,104 represents the fixed fee.

(b) There shall be no adjustment in the amount of the Contractor's fixed fee by reason of differences between any estimate of cost for performance of the work under this contract and the actual cost for performance of that work.

(c) The amount currently obligated by the Government with respect to this contract is $5,057,791.

Paragraphs (d) and (e) for the Rovno options are deleted.

Page 2

)

  • ' " 1 NRC-2 6 2 65 -

13

6. Section F.6~ Duration of Contract is hereby replaced by the following paragraph.

This contract shall commence on' June 12, 1996 and'will expire on September

- 30, 1999.

7. A summary'of obligations for this contract from award date through the date of this action is provided below:

l Total FY96' Obligation Amount: $2,588,168.00 1 Total FY96~Deobligation Amount: $ 34,106.00 Total FY97 Obligation Amount: $1,115,903.00 Total FY98 Obligation Amount: $ 756,800.00 Total FY99 Obligation-Amount: $ 632,376.00 Cumulative Total of NRC Obligations:$5,057,791.00

- 8. All other_ terms'and conditions remain unchanged.

6' 9

Page 3

.