Monthly Operating Rept for Nov 1986
ML20211P614
Person / Time
Site: Farley 
Issue date: 11/30/1986
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8703020399
Download: ML20211P614 (6)


Text

,_-

(-

T 1

-JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SLEWARY OF OPERATIONS November, 1986 During the month'of November, there were no unit shutdowns or significant power reductions.

The following major safety-related maintenance was performed in: the month of November:

1.~. The 2B charging pump was returned to service followirig -

maintenance.

2.

The 2B pressurizer-heater group was repaired and returned.to service.

The problem was due'to grounded' circuits in the containment electrical penetration.

'3.-

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

/fD

/

\\y kDjO 399 86113o R

OCK 05000364 PDR

-- =

_,c l

OPERATING DATA REPORT DOCKET NO.

50-364 DATE 12/2/86 COMPLETED BY J. D. Woodard TELEPHONE (205) 899-5156-OPERATING STATUS

1. Unit Name:-

Joseph M. Farley - Unit 2 Notes 1)

Cumulative data since

2. Reporting Penod.

Nnvomhor. 14R6

3. LWH Thermal Power (MWt):

2652 7/30/81, date of 860 commercial operati.on.

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

872.2 829.2

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A N/A

10. Reasons For Restrictions,if Any:

s This Month Yr..to-Date Cu$mlative

~ ~~

11. Hours la Reportmg Period 7?n 9 _n1A AA Rn1
12. Number Of Hours Reactor Was Critical 720.0 6,805.6 45,612.2 0.0 0.0 138.0
13. Reactor Reserve' Shutdown Hours
14. Hours Generator on.Line 720.0 6.714.4 40.106.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,905,245 17.113.036 101,347,586
17. Gross Electncal Energy Generated (MWH) 626.694 5.634.476 33.357.164
18. Net Electncal Energy Generated (MWH) 597.394 5.338.268 31.627.508
19. Unit Service Factor' 100.0 83.8 Rs 7
20. Unit Availability Factor 100.0 83.8 85.7
21. Unit Capacity Factor (Using MDC Net) 100.1 80.3 83.1
22. Unit Capacity Factor (Using DER Net) inn.i 80.3 81.5
23. Unit Forced Outage Rate 0.0 2.7 4.s
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

N/A 2S. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 08/01/81 07/30/81 COMMERCIAL OPERATION (9/77)

DOCKET NO.

50-364

+

UNIT -

Two DAR 12/02/86 J.D. Woodard COMPLETED BY T71rpHONE (205) 899-5156 St0NTl!

November j

DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5tWe Net)

(5tWe-Net) 823 832 g7 t.

833 gg 820 2

-.._833-3 g9 -.

832 l

4' 830 20 827 837 827 21 3

838 6

824 y,

832 7

821 23 g

825 24 825 9

828 23-823 gg 8_28 26 828 3g 824 27 835 831 828 3

g2 837 830 33 y

841 829 14 30 l.

838 33 I

15 832 16 INSTRUCTIONS On this form:t. list the aversge dsity unit power icvet in MWe Net for c:ch d:y in the reporting month. Campute to

, the neare:t whole rne;2 watt.

(9(77)

O O

O UNITSilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

S'0-364 UNIT NAME J.M. Farley-Unit 2 DATE December 2.

1986 REPORTMONTil November COMPLETED BY T-TL Woodard TELEPilONE (205T 899-5156

% sa 5 f

c ce

"'""S# "

5.,

g4 Cause & Connective i

No.

Date E.

'h I k

3)5U

~

N,"3 b**"'

j[

g Action to N

O :'$

li U

5

$M h E"'I #

PICvent Hecurlence l

f I

i l

4 THERE WER.

NO l lNIT SHU1 DOWNS OR SIG! IFICANT POWER tEDUCTI 3NS DURING THE MONTH OF NOVEMBER.

7 i

1 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S Stheduled A Equipment Failure (Explain, I Manual for Prepasallem of D.asa 1141aintenance of Test 2 Manual Scram.

Ent:y sheets for I.icensee C Refueling 3-Aulumatic Scram.

Event ReporI(l.ER) File (NUREG-D-Regulatiny Resiniction 4-Oaher (Explain) 0161)

E Operator Training & license Examination F Adminisisalive 5

G Opciational Eison (lixplain)

Exhibit ! Same Source p>/D) ll Othes (E xplain)

r g

6 Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1P15 AlabamaPower -

R. P. Mcdonald the southem ekttrcsystem

^

Senior Vice President December 9, 1986 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operatina Data Report Attached are two (2) copies of the November 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours tr y

/

hu/

R. P. Mcdonald i

RPM /BCE:pmm/1.70 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy)

+

~.. - - <, -,.

_~

7-

-.-----,_--,_-,.---.--_,__-w

,,y--

,v.

, -.., -.., - ~ - - - -,

?

l l

bc: Mr. J. M. Farley Mr. W. O. Whitt Mr. R. P. Mcdonald Mr. W. G. Hairston, III Mr. J. D. Woodard (G9.03 & A4.05)

Mr. L. S. Williams Mr. D. L. Whitson Mr. J. A. Ripple Ms. B. C. English Mr. J. M. Elliott Mr. J. R. Crane Mr. B. E. Hunt Mr. L. B. Long Mr. C. L. Whatley Ms. Sylvia Schoel Mr. C. Eiche1dinger Ms. M. D. Freeman Mr. S.' D. Hogge INPO Records Center ANI Library File: Binder Copy A-2.1 i