Forwards Revised Unit Shutdown & Power Reduction Pages to Monthly Operating Repts for May 1986.Revs Reflect Decrease in Number of Reported Power Reductions,Per NRC Guidelines
ML20211P272
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/17/1986
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20211P278 List:
References
NUDOCS 8607230070
Download: ML20211P272 (2)


Text

r*

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA, PA.19101 21si e4i.4ooo July 17, 1986 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement U.S.

Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk SUBJLCT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Enclosed are revised unit shutdown and power reduction pages of the Monthly Operating Report for Peach Bottom, Units 2 and 3, for the month of May, 1986, forwarded pursuant to Technical Specification 6.9.1.d.

The number of reported power reductions has been reduced as a result of more closely adhering to the NRC instructions for completing the Operating Data Reports.

Although not identified on this form, power reductions of a lesser magnitude have been addressed in the Operations Summary of each unit.

Copies of this revision have been Federal Expressed to P. A.

Ross, NRC - RM/BC, in order to allow publication of this revised data in the appropriate Grey Book.

I i

8607230070 860717 PDR ADOCK 0500027 7 R

PDR rG 2-y f

Ijf

/*

Document Control Desk July 17, 1986 Page 2 If you have any questions regarding the enclosed material, please contact me at (215) 841-5022.

Very truly yours, W. M. Alden Engineer-In-Charge Licensing Section Nuclear Services LLM:vdw Enclosures cc:

Dr. T.

E. Murley, NRC Mr. T.

P. Johnson, Resident Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)

G.

E. Gears, NRC Project Manager Mr. Thomas Magette, Maryland Power Plant Siting INPO Records Center 1