Forwards Insp Rept 50-346/97-10 on 970904.No Violations Noted.Unresolved Item Was Noted Pertaining to Protection Required for Vehicle Barrier Sys
ML20211P219
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/11/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20211P223 List:
References
50-346-97-10, NUDOCS 9710200103
Download: ML20211P219 (2)


See also: IR 05000346/1997010

Text

.,

_ .~ _ _

.

90A

e

',

October 11, 1997

Mr. John K. Wood

Vice President Nuclear

Davis Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Harbor, OH 43449

SUBJECT:

NRC SECURITY INSPECTION REPORT NO. 50 346/97010(DRS)

Dear Mr. Wood:

On September 4,1997, the NRC completed an inspection at your Davis Besse facility. The

onsite inspection was conducted August 6 7,1997. The documents requested from your

security staff were received September 3,1997, and the in office review of the documents was

completed on September 4,1997. The enclosed report presents the results of that inspection.

Areas examined within your security program are identified in the report. Within these areas,

the inspection consisted of a selective examination of procedures and representative records,

observations of activities, and Interviews with staff. The objective of the inspection effort was to

determine whether activities authorized by the license wece conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, no violations of NRC requirements were identified.

Other findings, not involving violations, were identified and are provided for your information

and review. An unresolved item was noted pertaining to the protection required for a vehicle

barrier system (VBS) gate. This issue will be forwarded to NRC Headquarters for review and

the results will be addressed by separate correspondence. No further actions are required of

your staff until the issue is resolved. Additionally, an Inspection Followup Item was identified

pertaining to some weaknesses noted with the VBS related procedures. The procedure

deficiencies are primarily administrative in nature and do not decrease the effectiveness of the

VBS. Our inspection has concluded that the VBS design, construction, and installation meets

NRC requirements.

$2ASbSSNoSh6

0

!Llil,1!B,l?llll,1!!!Illli

_.

.

- _ _ _ _ - _ _ _ _

,

.

.

J. K. Wood

2

October 11, 1997

,

In accordance with 10 CFR 2.700 of the NRC's * Rules of Practice," a copy of this letter and

enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

Original Signed by John A. Grobe

John A. Grobe, Acting Director

Division of Reactor Safety

Docket No. 50 346

License No. NPF 3

Enclosure:

Inspection Report 60 346/97010(DRS)

cc w/ encl:

John P. Stetz, Senior

Vice President - Nuclear

J. H. Lash, Plant Manager

J. L. Freels, Manager

Regulatory Affairs

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio,

Public Utilities Commission

Distribution:

Docket File w/enct

Rill PRR w/enci

Rlli Enf. Coordinator v.! encl

PUBLIC IE 01 w/ encl

SRI, Davis Besse w/ encl

TSS w/enct

OC/LFDCB w/ encl

LPM, NRR w/enct

CAA1 w/ encl

DRP w/enct

A. B. Bepch, Rlll w/ encl

DRS w/encI

J. Caldwell, Rlli w/enci

DOCUMENT NAME: G\\DRS\\DAV97010.DRS

y.

c.~. . ..,, .e is

.

.

en.

. e . e.,, . nooi .

.~.aei *r . copy w,th .t acN.nct *N" . N. eo >y

OFFICE

Rlll

6

RRI ,, g

h

/

Rill

Rlli

m,A

,

N

Jbd

GWright fW

JGrothe

U

NAME

GPirtle:Jp

DATE

09/2307

09/ I /97

09/ 6 /97

f0/ llf97

OFFICIAL RECORD COPY

..

.

_