ML20211P047

From kanterella
Jump to navigation Jump to search
Forwards Additions to Millstone Unit 2 Independent Corrective Action Verification Program Staff,Per Project Procedure PP-06
ML20211P047
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/10/1997
From: Curry D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUM2-PPNR-0664, NUM2-PPNR-664, NUDOCS 9710200039
Download: ML20211P047 (2)


Text

- - _ _ - - - - - - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _.

c, S

PARSONS

~

i Daniel L Curry, Vce President, Nuclear Serva;es Prsons Pcwer Group inc_

2675 Morgantown Road + Reading. Pennsylvama 19G07 + (610) B55-2366 + Far (610) 855-2602 October 10,1997 Docket No. 50-336 Parsons NUM2-PPNR-0664-L U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 2

~+ Independent Corrective Action Verification Program (ICAVP)

Gentlemen:

In accordance with Project Procedure PP-06 " Substitution or Addition of Personnel", the personnel noted on Attachment I are proposed as additions to the Millstone Unit 2 ICAVP Staff. Attachment 1 includes a briefd.. dption of the assigned task / role on the Millstone Unit 2 ICAVP. " Conflict ofInterest Forms" and resumes of these personnel have been previously fonvarded.

Sincerely, amY Daniel L. Curry b~

Parsons ICAVP Project Director DLC:cvb Attachments: - Proposed Additions to the Millstone Unit 2 ICAVP cc:

E. Imbro (2) - USNRC H. Eichenholz-USNRC R. Laudenat - NNECo J. Fougere - NNECo Rep. Terry Concannon - NEAC

/ { py 9710200039 971010 p

PDR ADOCK 05000336 PDR P

s e, a c' o 1 lil.lll.lll.lilllilll4111LIllllll g

ATTACllMENT 1 a

ADDITION OF PERSONNEL - MILLSTONE UNIT 2 ICAVP NAME ICAVP ASSIGNED TASK / ROLE Boutros, Fayez 1

Mechanical Clemenson, William 1

IIVAC - Tier 1 Jackson, Gary 1

Structural - Tier 1 Mauchline, Roger 1

Structural-Tier 1 Mscichowski, Louis 1

Mech:.nical - Tier i Nguyen, flung i

Structural-Tier 1 Mayer, Bert 1

Mechanical-Tier 1 O'Connor, Andrew 1

Fire Protection Pasquarello, Joseph 1

Fire Protection Stricklin, flerbert 1

Mechanical-Tier i Vaux, George 1

Regulatory Review l

Clark, George Site Site - Electrical

)

_ _ _ _ _ _ _ _ _