ML20211N088

From kanterella
Jump to navigation Jump to search
Informs That Us NRC Contractors at CNWRA Have Completed Review of Rept Entitled Draft Landscape Evolution Modeling of Western Ny Nuclear Svc Ctr, Dtd 990305.NRC Staff Endorses Encl Comments
ML20211N088
Person / Time
Issue date: 09/03/1999
From: Camper L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Mazurowski B
ENERGY, DEPT. OF
Shared Package
ML20211N093 List:
References
REF-PROJ-M-32 NUDOCS 9909100060
Download: ML20211N088 (3)


Text

Ms; Btrb:ra A. Mazurowski, Dirrctor_

September 3, 1999 i

U.S. Dep:rtmsnt of Energy _

. West Valley Area Office P.O. Box 191 1

West Valley, NY 14171-0191 De'ar Ms. 'Mazurowski:

The U.S. Nuclear Regulatory Commission's (NRC) contractors at the Center for Nuclear Waste 1

Regulatory Analysis (CNWRA) have completed their review of the report entitled " Draft Landscape Evolution Modeling of the Westem New York Nuclear Service Center," dated March 5,1999; The NRC staff endorses the Center's comments which are enclosed.

. NRC is a cooperating agency in the Environmental Impact Statement for completion of the West Valley Demonstration Project and closure or long-term management of facilities at the Western New York Nuclear Service Center. NRC is also authorized to prescribe decommissioning -

)

. criteria for the West Valley Demonstration Project, and will regulate the project facilities at some

{

point in the future. Therefore, NRC staff recommends that these comments be considered in any revisions to the report or subsequent related documents.

I If you have any questions, please contact Jack Parrott, of my staff, at 301-415-6700.

Sincerely,

[ Original signed by:]

Larry W. Camper, Chief Decommissioning Branch j

Division of Waste Management Office of Nuclear Material Safety and Safeguards Project No. M-32

Enclosure:

As stated cc: P. Piciulo, NYSERDA P. Merges, NYSDEC This' docume oul s uld not be made available to the PUBLIC k

/ [/ h fiditials)

(date) i TICKET: LLDP-9111 gg g5 DISTRIBUTION: NRC File Center DCB r/f NMSS r/f JHolonich TCJohnson TJackson, RI PMackin, CNWRA

  • SEE PREVIOUS CONCURRENCE

' DOCUMENT NAME:S:\\DWM\\DCB\\JDP\\WVLE11.WPD

[

f 'T

,h OFC DCB*

DCB*

D rs f

h NAME JParrott/cv TCJohnson 4

9N/99

/ p~ \\

9/[/99 DATE 8/31/99 9/1/99 k

OFFICIAL RECORD COPY ACNW:

YES NO r n'1 9909100060 990903 POR PROJ M-32 PDR

Ms. B:rb:rs A. Mazurowski, Dir:ctor U.S. D:pirtmcnt of En:rgy West Valley Area Office P.O. Box 191 West Valley, NY 14171-0191

Dear Ms. Mazurowski:

The U.S. Nuclear Regulatory Commission's (NRC) contractors at the Center for Nuclear aste Regulatory Analysis (CNWRA) have completed their review of the report entitled " Draft -

Landscape Evolution Modeling of the Western New York Nuclear Service Center," datM March 5,1999. The NRC staff endorses the Center's comments which are enclose NRC is a cooperating agency in the Environmental Impact Statement for comple on of the West Valley Demonstration Project and closure or long-term management of f ilities at the Western New York Nuclear Service Center. NRC is also authorized to presc e

decommissioning criteria for the West Valley Demonstration Project, and w' regulate the project facilities at some point if the future. Therefore, NRC staff recom ends that these K

comments be considered in any revisions to the report or subsequent r ated documents.

If you have any questions, please contact Jack Parrott, of my staff, 301-415-6700.

Sincerely,

[ Original signed y:]

Larry W. Camp, Chief Decommissiofng Branch Division of aste Management Office of clear Material Safety and Sa guards Project No, M-32

Enclosure:

As stated cc:

P. Piciulo, NYSERDA P. Merges, NYSDEC Thl3 documen be made available to the PUBLIC eJd 9///49 is not r lated to the HLW pro /

(Mltfals)

(date)

Thl3 docume gram. If it is related to HLW, it should/should not be placed in y/ Ahy the LSS.

/

TICKET: LLDP-9111 DISTRIBUTION: Central File DCB r/f NMSS r/f PSantiago TCJohnson TJacksor)(RI PMackin, CNWRA PUBLIC

/

l DOCUMENT NAME:S \\DWM\\DCB\\JDP\\WVLE11.WPD OFC DCB DClll\\

DCB gr T y NAME JParrdIt TCJohison LCamper h1h /99 k/

/99

/

/99 DATE OFFICIAL RECORD COPY ACNW;j'YES LSS:

NO YES NO I -

IG: [

YES NO Delete file after distribution YES NO l

/

]

L

i e*#

Q l

j g

y-

,4' UNITED STATES l

, j NUCLEAR REGULATORY COMMISSION

'C WASHINGTON, D.C. 20555 0001 4

,o 9.....

September 3, 1999 Ms. Barbara A. Mazurowski, Director U.S. Department of Energy West Valley Area Office l

P.O. Box 191 West Valley, NY 14171-0191 I

Dear Ms. Mazurowski:

The U.S. Nuclear Regulatory Commission's (NRC) contractors at the Center for Nuclear Waste l

Regulatory Analysis (CNWRA) have completed their review of the report entitled " Draft Landscape Evolution Modeling of the Western New York Nuclear Service Center," dated March 5,1999. The NRC staff endorses the Center's comments which are enclosed.

i NRC is a cooperating agency in the Environmental Impact Statement for completion of the West Valley Demonstration Project and closure or long-term management of facilities at the Western j

New York Nuclear Service Center. NRC is also authorized to prescribe decommissioning criteria for the West Valley Demonstration Project, and will regulate the project facilities at some i

point in the future. Therefore, NRC staff recommends that these comments be considered in l

any revisions to the report or subsequent related documents.

l If you have any questions, please contact Jack Parrott, of my staff, at 301-415-6700.

Sincerely, M

Ow/

Larry W. Camper, Chief Decomn(issioning Branch l

Division 6f Waste Management Office of Nuclear Material Safety 1

and Safeguards 1

l

(

Project No. M-32 l

i l

Enclosure:

As stated i

cc: P. Piciulo, NYSERDA P. Merges, NYSDEC l

!