ML20211M676
| ML20211M676 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/08/1986 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Kammerer C NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA) |
| References | |
| NUDOCS 8612180018 | |
| Download: ML20211M676 (4) | |
Text
_
E DEC %
MEMORANDUM FOR:
Carlton C. Kamerer, Director Office of Congressional Affairs FROM:
Harold R. Denton, Director Office of Nuclear Peactor Regulation
SUBJECT:
BROOKHAVEN NATIONAL LARORATORY (RNL) DRAFT PEPORT OF THE SEARR00K EMERGENCY PLANNING SENSITIVITY STUDY The enclosed RNL draft report has been made available to all parties to the Seabrook proceedings. Members of Congress representing the State of New Hampshire and the Commonwealth of Massachusetts have shown a great deal of interest in this subject. Will you please make the report available to the appropriate members of Congress as soon as possible. To help you expedite the distribution, fifteen copies of the report are enclosed.
Origin 3g signed BD Richard H. Vo"mer Harold R. Denton, Direc. tor Office of Nuclear Reactor Regulation 4txxkxsomxwithout/ enclosure Draft Technical Evaluation of the EPZ Sensitivity Study for Seabrook Technical Report A-3852 DISTRIRTUTION
' Docket Files NRC PDR LDPR PD#5 VNoonan DFioravante AD/PWRA VNerses MRushbrook HRDenton k
DI :.
/'
PD#5 DIR:PD#5 PWRA:AD N
VNerses:ss VNoonan TNovak P ollmer P
ton 12/ /86 12/ /86 12/ /86
/ /86 IP/ /P6 8612180018 861208 PDR ADOCK 05000443 P
\\
0B DEC 986 1
MEMORANDUM FOR:
Carlton C. Kammerer, Director Office of Congressional Affairs FROM:
Harold R. Denton, Director Office of Nuclear Reactor Regulation
SUBJECT:
BROOKHAVEN NATIONAI. LABORATORY (BNI.) DRAFT PORT ON INITIAL TECHNICAI. REVIEW OF THE SEABROOK E GENCY Pl.ANNING SENSITIVITY STUDY
~
The attached BNI. draft report has been made available t all parties to the Seabrook proceedings. Members of Congress represent ing the State of New Hampshire and the Commonwealth of Massachusetts ve shown a great deal of interest in this sub.iect. Wil. u please ma the report available to the
. members of Congress from New Hamps ire and assachusetts as soon as possible.
To help you expedite the distributi fteen copies of the report are enclosed.
Harold R Denton, Director Office of uclear Reactor Regulation
Enclosure:
1.
Draft Technical Evalu ion of the EP7 Sensitivity Stud for Seabrook Technical Report A-52 See previous concurr ce Distribution Docket or Central ile NRC PDR*
l.ocal PDR*
PD#5 R/F V. Noonan AD/BWR, PWR-A
\\
V. Nerses
\\
M. Rushbrook s
D. Denton s
PD#5 DIR:PD#5 DIR:DIV N
s VNerses:ss VNoonan HDenton 12/ /P6 12/ /86 12/ /86 s
08 DEC E MEMORANDUM FOR:
Carlton C. Kammerer, Director Office of Congressional Affairs FROM:
Parold R. Denton, Director Office of Nuclear Reactor Reoulation
SUBJECT:
BROOKHAVEN NATIONAL. I.ABORATORY (BNI.)
RAFT REPORT ON INITIAL TECHNICAL. REVIEW 0F TPE SEA 00K EMERGENCY Pl.ANNING SENSITIVITY STUDY l
l The attached BNI. draft report has been made availa e to all parties to the j
Seabrook proceedings, Members of Congress repre entating the State of New
"+nshire and the Commonwealth of Massachuset have shown a great deal of interest in this subject.\\Will you please ake the report available to the
~
members of Congress from New agpshire d Massachusetts as soon ae. possible.
To help you expedite the distributter fifty copies of the report are enclosed.
l N xN Parold R. Dent Director Office of Nuclea eactor Regulation Distribution I
Docket or Central F e NRC PDR*
h I.ocal PDR*
I PD#5 R/F
/
s V. Noonan
/
\\
AD/BWR, PWR- '
V. Nerses 5'
Rushbr D. Denton' PDf5) f, DIR:PD#5 DIR:DIV VNet'ses:ss VNoonan PDenton 12/5 /86 12/ /86 12/ /86
e pM E %q'*,
UNITED STATES
[.
g NUCLEAR REGULATORY COMMISSION L
j WASHINGTON, D. C. 20555 8
w,,,,,+
DEC %
MEMORANDtlM FOR:
Carlton C. Kammerer, Director Office of Congressional Affairs FROM:
Harold R. Denton, Director Office of Nuclear Reactor Regulation
SUBJECT:
BROOKHAVEN NATIONAL LABORATORY (BNL) DRAFT REPORT OF THE SEABROOK EMERGENCY PLANNING SENSITIVITY STUDY The enclosed BNL draft report has been made available to all parties to the Seabrook proceedings. Members of Congress representing the State of New Hampshire and the Commonwealth of Massachusetts have shown a great deal of interest in this subject. Will you please make the report available to the appropriate members of Congress as soon as possible. To help you expedite the distribution, fifteen copies of the report are enclosed.
.gubA
-~
arold R. Denton, Director Office of Nuclear Reacto"r Regulation
Enclosure:
Draft Technical Evaluation of the EPZ Sensitivity Study for Seabrook Technical Report A-3852
[
t