ML20211M503

From kanterella
Jump to navigation Jump to search
Forwards Updated Listing of Set of Data Points Provided in Data Point Library for ERDS for Units 2 & 3
ML20211M503
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/06/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9710140265
Download: ML20211M503 (5)


Text

_ - - _ - - _ - - _ _ - - - - - .-

St; tion Cupport Department

,A 10CFR50, Appendix E

=f

. PECO NUCLEAR nco ~ c-Nuclear Group Heackpwrters A Umr or /YCO htta 965 CtestertmxA Boulevard Wayne. FA 19o87 5691 October 6,1997 Docht Nos 50 277 50-278 License Nos, DPR-44 DPR 56 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 l

Emergency Response Data System Data Point Library Changes Gentlemen:

Enclosed is an updated listing of the set of data points provided in the Data Point Library for the Emergency Re:ponse Data System (ERDS) for Peach Bottom Atomic Power Station (PBAPS),

Units 2 and 3. ERDS is a direct, near real-time, electronic data link between PEAPS and the NRC's Operations Center which provides for the transmission of selected process computer data for monitoring various plant parameters.

10CFR50, Appendix E, Section VI.3.a requires that any changes in computer hardware or software that affect the transmitted data points identified in the Data Point Library must be submitted to the NRC within 30 days after the changes are completed. PECO Energy implemented changes to the PBAPS ERDS that modified the set of data points contained in the Data Point Library. The NRC was made aware of these changes and is currently receiving the ERDS data for the plant parameters identified in the enclosure to this letter. However, the changes were not formally submitted to the NRC via docketed correspondence within 30 days as required by 10CFR50, Appendix E. Therefore, this letter serves as the required notification regarding the changes in the Data Point Library for the PBAPS ERDS. We apologize for any inconvenience this may have caused, if you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, 0' o .

George A. Hunger, Jr.

Director - Licensing D Enclosure cc: H. J. Miller, Administrator, Region I, USNRC (2 copies of enclosure)

USNRC Senior Resident inspector, PBAPS (w/ enclosure) k 9710140265 PDR 971006 F

ADOCK 05000277 kh i

PDR l

l Unit 2 EPDS_ERDS points.xis

? Point IDF :U2ERDS sU3ERDS. -

M+n 4#DescriptionE JM~ "

Erf.cc.h9 Units m Component ID -- L PlantSystem '

SYS010 FALSE TRUE UNIT 3 ERDS LINK STATUS ACT 59A D524 TRUE FALSE A1 CH MSL HI RAD RIS-251A 60F D525 TRUE FALSE B1 CH MSL HI RAD RIS-251B 60F D526 TRUE FALSE A2 CH MSL HI RAD RIS-251C 60F D527 TRUE FALSE B2 CH MSL HI RAD RIS-251D 60F H004 TRUE FALSE A RX PRESS PSIG PT2-2 28 H005 TRUE FALSE B RX PRESS PSIG PT2-2 2B H037 TRUE FALSE D/W FLR DRN SUMP LVL 20A H050 TRUE FALSE CST LVL FEET LT-2217 27A H053 TRUE FALSE HPCIFLO GPM FT-2 23 H054 TRUE FALSE RCIC FLO GPM FT-2 13 H055 TRUE FALSE A CS LOOP FLO GPM FT-2 14 H056 TRUE FALSE B CS LOOP FLO GPM FT-2 14 J154 TRUE FALSE MAIN STACK WRGM LO RANGE UC1/CC J155 TRUE FALSE MAIN STACK WRGM MID RANGE UCI/CC J156 TRUE FALSE MAIN STACK WRGM HI RANGE UCl/CC J158 TRUE FALSE VENT STACK WRGM LO RANGE UCl/CC 59 J159 TRUE FALSE VENT STACK WRGM MID RANGE UCl/CC 59 J160 TRUE FALSE VENT STACK WRGM HI RANGE UCl/CC 59 M002 TRUE FALSE OG RAD (SJAE DISH) MR/HR RIS-2-17 638 M004 TRUE FALSE RADWASTE LIO EFFLUENT RAD CPS RIS-0-17 63M R006 TRUE TRUE TOVER 2 WIND DIR 320' DEG 00S389 94 R007 TRUE TRUE TOWER 2 WIND SPEED 320' MPH 00S389 94 R008 TRUE TRUE TOWER 2 SIGMA THETA 320' DEG 00S389 94 SPDS0030 TRUE FALSE AVG TORUS TEMP DEGF 7H SPDS0200 TRUE FALSE AVG NON-BYPASSED APRM PWR  % PWR 60A SPDS0201 TRUE FALSE AVG RPV LVL COMPENSATED INCHES 28 SPDS0202 TRUE FALSE AVG D/W PRESS RANGE SELECTED PSIG 7 SPDS0222 TRUE FALSE AVG INSERTED SRM COUNT RATE CPS 60D SPDS0223 TRUE FALSE AVG TORUS LVL NR OR WR FEET 7 SPDS1274 TRUE FALSE IPCI LOOP A FLO GPM 10 SPDS1275 TRUE FALSE L. Cl LOOP B FLO GPM 10 SPDS1276 TRUE FALSE TORUS CAD HYDROGEN  % H2 7C SPDS1277 TRUE FALSE TORUS CAD OXYGEN  % O2 7C Page 1

Unit 2 EPDS_ERDS points.xis l I

SPDS1278 TRUE FALSE D/W CAD HYDROGEN  % H2 7C {

SPDS1279 TRUE FALSE D/W CAD OXYGEN  % O2 7C I SPDS1287 TRUE FALSE AVG MN STACK RAD-NRW/ WIDE RNG UCt/CC 63F SPDS1288 TRUE FALSE AVG VNT STACK RAD-NRW/ WIDE RNG UCUCC 63E SPDS1289 TRUE FALSE AVG D/W BULK AVG TEMP DEGF 7 SPDS1293 TRUE FALSE TOTAL F/W FLO Ms/HR 6C T061 TRUE FALSE D/W HI RAD CH 2 REM /HR RE-8103C 63D T062 TRUE FALSE D/W HI RAD CH 3 REM /HR RE-81038 63D T063 TRUE FALSE D/W HI RAD CH 4 REM /HR RE-8103D _

63D T081 TRUE FALSE D/W HI RAD CH 1 REM /HR RE-8103A i 63D Page 2 l

l Un'd wiFRERDS points.xis I tC Point ID W TU2ERDS4 V U3ERDS ' %@7% DesonptionWNSWCPN g Engmeenna Units

  • Component ID Plant System D824 FALSE TRUE A1 CH MSL HI RAD R1S-251 A 60F  :

D825 FALSE TRUE B1 CH MSL HI RAD RIS-2518 60F D826 FALSE TRUE A2 CH MSL HI RAD RIS-251C 60F D827 FALSE TRUE B2 CH MSL HI RAD R1S-251D 60F H304 FALSE TRUE A RX PRESS PSIG PT3-2-3-404A 28 H305 FALSE TRUE B RX PRESS PSIG PT3-2-3-404B 2B H337 FALSE TRUE D/W FLR DRN SUMP LVL 20A H350 FALSE TRUE CST LVL FEET LT-3217 27A H353 FALSE TRUE HPCIFLO GPM FT-3-23-82 23 H354 FALSE TRUE RCIC FLO GPM FT-3-13-58 13 H355 FALSE TRUE A CS LOOP FLO GPM FT-3-14-40A 14 H356 FALSE TRUE B CS LOOP FLO GPM FT-3-14-408 14 J654 FALSE TRUE MAIN STACK WRGM LO RANGE UCl/CC J655 FALSE TRUE MAIN STACK WRGM MID RANGE UCl/CC J656 FALSE TRUE MAIN STACK WRGM HI RANGE UCl/CC  !

J658 FALSE TRUE VENT STACK WRGM LO RANGE UC1/CC 59 J659 FALSE TRUE VENT STACK WRGM MID RANGE UCl/CC 59 J660 FALSE TRUE VENT STACK WRGM HI RANGE UCl/CC 59 M302 FALSE TRUE OG RAD (SJAE DISH) MR/HR RIS-3-17-150A 6?B M304 FALSE TRUE RADWASTE LIO EFFLUENT RAD CPS RIS-0-17-350 63M SFDS0330 FALSE TRUE AVG TORUS TEMP DEGF 7H  ;

SPDS0500 FALSE TRUE AVG NON-BYPASSED APRM PWR %PWR 60A SPDS0501 FALSE TRUE AVG RPV LVL COMPENSATED INCHES 2B SPDS0502 FALSE TRUE AVG D/W PRESS RANGE SELECTED PSIG 7 l SPDS0522 FALSE TRUE AVG INSERTED SRM COUNT RATE CPS 60D SPDS0523 FALSE TRUE AVG TORUS LVL NR OR WR FEET 7 SPDS1574 FALSE TRUE LPCI LOOP A FLO GPM 10 SPDS1575 FALSE TRUE LPCI LOOP B FLO GPM 10 SPDS1576 FALSE TRUE TORUS CAD HYOROGEN  % H2 7C l SPDS1577 FALSE TRUE TORUS CAD OXYGEN  % O2 7C [

SPDS1578 FALSE TRUE D/W CAD HYDROGEN  % H2 7C  ;

SPDS1579 FALSE TRUE D/W CAD OXYGEN  % O2 7C SPDS1587. FALSE TRUE AVG MN STACK RAD-NRWPWIDE RNG UCI/CC 63F SPDS1588 FALSE TRUE AVG VNT STACK RAD-NRW/ WIDE RNG UCl/CC 63E 4

Page 1 i

~

Unit 3 EPDS._ERDS points.x!s .

SPDS1589 FALSE TRUE AVG D/W BULK AVG TEMP DEGF 7 SPDS1593 FALSE TRUE TOTAL F/W FLO M#/HR 6C SYS009 TRUE FALSE UNIT 2 ERDS LINK STATUS ACT 59A T361 FALSE TRUE D/W HI RAD CH 2 REM /HR RE-9103C 63D T362 FALSE TRUE D/W HI RAD CH 3 REM /HR RE-91038 63D T363 FALSE TRUE D/W HI RAD CH 4 REM /HR RE-9103D 63D T381 FALSE TRUE D/W HI RAD CH 1 REM /HR RE-9103A 63D Page 2