ML20211M448

From kanterella
Jump to navigation Jump to search
Requests That Appropriate Members of Staff Contact Wb Jones or Jl Shackelford to Coordinate Proposed Visit to Facility to Provide Info Re Region Use of risk-informed Approaches in Regional Programs.Required Qualifications Completed
ML20211M448
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/08/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
NUDOCS 9710140209
Download: ML20211M448 (5)


Text

- 4 g '%

UMTL D $T ATES

- f-.

. 4. -

NUCl. EAR REGULATORY COMMISSION f,

1 R EGloN IV

>se e

3,

,4 till R Y A N l'LAZA DRtVL, SUIT E 400

'y-...../

AR LINGT ON, T E X As 76011 8064 October 8,1997 Garry L. Randolph, Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251

SUBJECT:

SENIOR REACTOR ANALYST (SRA) INTERFACE VISIT

Dear Mr. Randolph:

On August 16,1995, the Commission published its final policy statement on the use c.f probabilistic risk assessment (PRA) technology in regulatory matters. The Commission stated that the use of PRA should be increased in all regulatory matters to the extent supported by the state-of the art and in a manner which complements the NRC's current

[

regulatory approach. One element of this initiative has been the development and certification of Senior Reactor Analysts (SRAs) whose responsibilities include the coordination of risk-informed regulatory issues for the NRC's regional offices.

The SRAs in Region IV have completed all the required qualifications and training and are now assisting the Region in implementing programs, which will fulfill the objectives that are outlined in the Commission's policy statement. The Region IV SRAs are William B.

Jones and Jeffrey L. Shackelford. Messrs. Jones and Shackelford are assigned to the Division of Reactor Safety. The Region proposes that Mr. Jones and Mr. Shackelford visit your facility to provide information related to the region's use of risk-informed approaches in regional programs. Additionally, such a visit would allow an opportunity for your staff to provide any insights whicn you might have regarding your f acility's use of PRA informa' tion l

in plant operations, engineering, maintenance, and any other related activities. We

()

anticipate that this visit would primarily involve the members of your staff who are responsible for PRA related activities and would last for approximately one day. It would also be desirable for the SRAs to visit briefly and introduce themselves to plant management.

The proposed discussion topics for this visit would include: the plant-specific risk profile; plant specific risk-informed inibatives (potential / planned initiatives, modifications, etc.),

pilot activities, and issues; and, any perceived impact of deregulation on grid reliability.

The SRAs would be able to provide an overview of risk insights in Region IV activities, the consideration of risk in enforcement actions, and an overview of NRC risk-informed Regulatory Guides and Standard Review Plans. Finally, we would like to discuss with your staff the means by which the Region may obtain a controlled copy of your current risk analysis, as well as providing a mechanism for obtaining any future revisions.

numijnltgL1g,g..g. lg 9710140209 971000 l

lHll Idlll,

1 PDR ADOCK 05000483 P

PDR

n N

.j 4

.3

Union' Electric' Company - - We request that the appropnate membeis of your staff contact Mr.' Jones or Mr. Shackelford ~directly in order to coor
iate the proposed visit. Mr = Jones can be reached at (817) 860-8147, and Mr.~5nackelford can be reached at (817) 860-8144.-
incerely, f

f 1

L Art r T. Howell lil, Director Division of Reactor Safety Docket No.: 50 483

- License No.:. NPF-30 cc: -

Professional Nuclear Consulting. Inc.

-190*

iines Drive 1

l Derwt Maryland 20855 Gerald Cnarnoff, Esq.

- Thomas A. Baxter, Esq.-

. Shaw, Pittman,.Potts & Trowbridge 2300 N.' Street, N.W.

Washington, D.C.-- 20037 -

- H.~ DiBono. Supervising Engineer -

Site Licensing 1

- Union Electric Company :

P.O. Box 620; J Fulton,.Missotri 65251 Manager - Electric Department

. Missouri Public Service Commission 301 W. High' LP.O. Box 360:

0 Jefferson City, Missouri 65102

(. Ronald AJ Kucera, Deputy Director:-

Department of Natural Resources-P.O. Box 176

Jefferson City, Missourl 65102

Union Electric Company -

' Otto L. Maynard, President and

Chief Executive ~ Officer-

. Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlingto'n, Kansas 66839 -

Dan 1. Bolef, President-1 Kay Drey, Representative l

Board of Directors Coalition

. for the Environment 6267 Delmar Boulevard University City,- Missouri 63130

- Lee Fritz, Presiding Commissioner Callaway County Court House (f

10 East Fifth Street Fulton, Missourl = 65151 Alan C. Passwater. Manager Licensing and Fuels.

' Union Electric Company -

P.O. Box 66149

St. Louis, Missouri ~ 63166-6149

=-J.-V. Laux, Manager

- Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251

.C s

~

Union _ Electric Company.-

4-bec to DCD (IE01)

~

- bec.distrib. by RIV:.

. Regional Administrator

' Resident inspector

-: DRP Director-DRS-PSB Branch Chief (DRP/B).

. MIS System Project Engineer-(DRP/B)-

- RIV File Branch Chief (DRP/TSS) i I

~!

DOCOMENT NAME: R:\\_CW\\CWLT1006.SRA -

~

To receive copy of document, indicate in box: "C" = Copy without enclosures :"E" = Copy with enclosures "N" = No copy SRA.

SRA.

D:DF${p 3

BJones/Imb JShackelford ATHWtti IF 09/04/97-09/04/97-10/08/97 OFFICIAL RECORD col3Y

-l 4

  • n
1

":Urt!on Electric Companyj 4-

...g

.'bec to DCD (IE01)-

bec distribc.by RIV:.

.j Regional' dministrator-Resident inspector.

l A

.DRP Director /

DRS-PSB t Branch Chief (DRP/8).

MIS System l

Project Engineer (DRP/B)

RIV File.-

l Branch Chief (DRP/TSS) -

i j

- r u-t-

4 2

=;E

DOCUMENT NAME: < R:\\_CW\\CWLT1006.SRA =
To receive copy of en_, Indicate in tai "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy

..4-SRA-SRA-D:D17pfp

,4 BJones/imb c JShackelford ATHW Hi IF-

[09/04/97H 09/04/97 10/08/97

~

OFFICIAL RECORD COY

.,.