O v*t, UNITIO bi Ait &
g
,7,
\\
NUCLL AH H[GUL ATORY COMMISSION k \\(Ma((
3 a
ni c. ion w m av as n An onwt suis t 400 4.,
AntaNotoN, it u As nm co64
...,+
October 8,1997 John R. McGaha, Vice President Operations River Bond Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Loulciana 70776
SUBJECT:
SENIOR REACTOR ANALYST (SRA) INTERFACE VISIT
Dear Mr. McGahn:
On August 10,1995, the Commission published its final policy statement on the use of probabilistic risk assessment (PRA) technology in regulatory matters. The Commission stated that the use of PRA should be increased in all regulatory matters to the extent supported by the state of the art and in a manner which complements the NRC's current
}
regulatory approach. One element of this initiative has been the development and certification of Senior Reactor Analysts (SRAs) whose responsibilities include the coordination of risk informed regulatory issues for the NRC's regional offices.
The SRAs in Region IV have completed all the required qualifications and training and are now assisting the Region in implementing programs, which will fulfill the objectives that are outlined in the Commission's policy statement. The Region IV SRAs are William D.
Jones and Jeffrey L. Shackelford. Messrs. Jones and Shackelford are assigned to the Division of Reactor Safety. The Region proposes that Mr. Jones and Mr. Shackelford visit your f acility to provide information related to the region's use of risk informed approaches in regional programs. Additionally, such a visit would allow an opportunity for your staff to provide any insigtits vvhich you might have regarding your f acility's use of PRA information in plant operations, engincoring, maintenance, and any other related activities. We anticipate that this visit would primarily involve the members of your stafI who are responsible for PRA related activities and would last for approximately one day. It would
[/k, also be desirable for the SRAs to visit briefly and introduce themselves to plant L/
management.
The proposed discussion topics for this visit would include: the plant specific risk profile; plant specific risk informed initiatives (potential / planned initiatives, modifications, etc.),
pilot activities, and issues; and, any perceived impact of deregulation on grid reliability.
The SRAs would be able to provide an overview of risk insights in Region IV activities, the consideration of risk in enforcement actions, and an overview of NRC risk-informed Regulatory Guides and Standard Review Plans. Finally, we would like to discuss with your staff the means by which the Region may obtain a controlled copy of your current risk analysis. as well as providing a mechanism for obtaining any future revisions.
- ^ ^ *
- 9710140201 97toog gDR ADOCK 05000458 PDR h
s.,
Entergy Operations, Inc.
2 4
We request that the appropriate members of your staff contact Mr ~ Jones or Mr. Shackelford directly in order to coordinate the prc,70 sed visit. Mr. Jones can j
- be reached at (817) 860 8147, and Mr. Shackelford can be reached at (817) 860 8144..
j i
F neerel%
1
[
y Arth r T. Howell lil, Director i
Division of Reactor Safety Docket No.: 50 458 j
License No.: NPF 47 r
cci-Executive Vice President and Chief Operating Officer l
Entergy Operations,1lnc.
j P.O. Box 31995 Jackson, Mississippi 39286 1995
[
Vice President Operations Support-i Entergy. Operations, Inc-P.O. Box 31995
' Jackson, Mississippi 39286 1995 iGeneral Manager.
Plant Operations River Bond Station Entergy Operations, Inc.
P.O. Box 220 a
St. Francleville, Loulslana 70775 Diroctor... Nucleer Safety:
River Bond Station L
Entergy_ Operations, Inc.
' P.O. Box 220 D
St. Francisville, Louisiana 70775 I~
_ Wise, Carter, Child & Caraway-L
' P.O. Box 651
. Jackson, Mississippi 39205 i-f1 5
)
p L
Entergy Operations, Inc.
3-Mark J. Wetterhahn, Esq.
Winston & Strawn 1401 L Street, N.W.
Washington, D.C. 20005-3502 Manager Licensing River Bend Station Entergy Operations, Inc.
l P.O. Box 220 St. Francisville, Loulslana 70775 The Hanotable Richard P. leyoub Attorney General P.O. Box 94095 Baton Rouge, Loulslana 70804 9095 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Loulslana 70806 Presiant of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Joint Ownership Manager Cajun Electric Power Coop. Inc.
_ P.O. Box 15540 Baton Rouge, Louisiana 70895 William H. Spell, Administretor Loulslana Radiation Protection Division P.O. Box B2135 Baton Rouge, Louislana 70884-2135
o.
! f 1. '
Entergy Operations, Inc.
4-bcc to DCD (IE01)
..bec distrib, by RIV:
- Regionel Administrator Senior Resident inspector (Grand Gulf)
L-
. Branch Chief (DRP/G).
MIS System
. Project Engineer (DRP/G)
RIV File
- Branch Chief (DRP/TSS)
' Resident inspector L
l l
1 l
1 i
1 4,-
o 1DOCOMENT NAMEi R:\\ RB\\RGLT1006.0*HA To recelvo copy of f
., inslicate in bes: "c" = Copy ethout enclosures "E" a Copy wth enclosures "N"
- No copy SRA SRA D:DRRtKd j BJones/imb--
JShackelford-A T H d W hil f 09/04/97 09/04/97 10/08/97 '
OFFICIAL RECORD Col'Y 1
i
4
'4 e
l Entergy Operations, Inc.
4, l
bec to DCD (IE01).
l bco distrib. by RIV:
Regional Administrator Senior Resident inspector (Grand Gulf)
DRP Director DRS-PSB J
Branch Ch_lef (DRP/G)
MIS System Project Engineer (DRP/G)-
RIV File; l
Branch Chief (DRP/TSSI Resident inspector i
.)
DOCUMENT NAME: R:\\_RB\\RBLT1006.SRA-
= To receive copy of document, Indicate in box: "C" = copy weout enclosures
- E" Copy with enclosures *N" a No copy SRA SRA D:DR$yJJ j BJones/Imb JShackelford ATHdWMI f 09/04/97-09/04/97 10/08/97 '
OFFIClAL RECORD col'Y