Forwards Ei Hatch Nuclear Plant Unit 2,Reactor Containment Bldg Integrated Leak Rate Test, Final Rept,Per 10CFR50,App J,Section V.B.1.Rept Includes Info Requested in IE Info Notice 85-071
ML20211M372
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/20/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211M374 List:
References
1141C, IEIN-85-071, IEIN-85-71, SL-2035, NUDOCS 8702270269
Download: ML20211M372 (2)


Text

4A

- Georgis Powcr Cornpany 333 Piedrnont Av:nue Atlanta, Georgia 30308

. Tal: phone 404 526-6526 Mailing Address:

Fbst Ofrice Box 4545

~

Atlanta, Georgia 30302 M

Georgia Power

' Mar $ age Nuclear Safety and Licensing SL-2035 1141C February 20, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 NRC DOCKETS 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST REPORT - HATCH UNIT 2 FALL 1986 MAINTENANCE / REFUELING OUTAGE Gentlemen:

Pursuant to the requirements of 10 CFR 50, Appendix J, Section V.B.1, Georgia Power Company hereby submits a summary technical report entitled

" Reactor Containment Building Integrated Leak Rate Test" (Enclosure 1) for the "as left" integrated leak rate test which was conducted at Plant Hatch Unit 2 during the Fall 1986 maintenance / refueling outage.

Included in the Enclosure 1 report is information on the reactor l

containment building "as found" condition, as requested in NRC I&E Notice i 85-71, " Containment Integrated - Leak Rate Tests", issued on August 22, 1985.

i Five copies of the report are enclosed for your convenience.

g If you have any questions in this regard, please contact this office at any time.

l Sincerely, cW Gem l L. T. Gucwa

$h p

}O s

Georgia Power d U. S. Nuclear Regulatory Comission ATTN: Document Control Desk February 20, 1987 Page Two GKM/lc Enclosure c: Georgia Power Company U. S. Nuclear Regulatory Comission Mr. i. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J.. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident Mr.11. C. Nix, Jr. Inspector - llatch G0-NORMS Mr. G. Rivenbark, Licensing Project Manager 1141C 700775 l