Georgia Fbwer Company h/2/ 8 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526 6526 Mailing Address-Post Off.ce Box 4545 Atlanta. Georgia 30302 GeorgiaPower 86 DEC 8 A10 : J i L T. Gucwa IN wot"em ewrc sy@m Manager Nuclear Safety g(,jggg and Ucensing November 26, 1986 U. S. Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement RII:

Region II - Suite 2900 50-366 101 Marietta Street, NW Technical Atlanta, Georgia 30323 Specifications ATTENTION: Dr. J. Nelson Grace Gentlemen:

\

This letter constitutes written followup of a relief request to Technical Specification Requirements. Specifically, temporary waiver of Technical Specifications requirements was requested, and subsequently granted, via telecon between Georgia Power Company (GPC) personnel, members of your staff, and a member of the NRC NRR staff on November 26, 1986. This temporary relief from compliance with Plant Hatch Unit 2 Technical Specifications pertaining to the Main Control Roon Environmental Control System (MCRECS) was granted to allow startup of Plant Hatch Unit 2 - from the current refueling outage while NRR completes review of GPC's submittal of November 10, 1986, which proposed changes to the Technical Specifications pertaining to operability and surveillance requirements of the MCRECS.

During the period for which this temporary relief is granted, Plant Hatch Unit 2 will be operated pursuant to the MCRECS Technical Specifications, including surveillance requirements, proposed in GPC's submittal of November 10, 1986.  ;

Please contact this office if you desire further information in this regard.

Sincerely, 1

0612160137BNh66 PDq ADOCK O PDR -

p L. T. Gucwa I REB /lc c: Georgia Power Company U. S. Nuclear Regulatory Commission Mr. t . P. O'Reilly Mr. D. R. Muller, NRR Mr. J. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr. Inspector - Hatch G -N RMS

/-

0944C

/ xi. Official C0 h