ML20211L832

From kanterella
Jump to navigation Jump to search
Response to Request for Regulatory Conference (EA-20-057; Inspection Report 05000281/2020090)
ML20211L832
Person / Time
Site: Surry Dominion icon.png
Issue date: 07/02/2020
From: Mladen F
Dominion Energy Co, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
20-255, EA-20-057 IR 2020090
Download: ML20211L832 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 2, 2020 U. S. Nuclear Regulatory Commission Serial No.: 20-255 Attention: Document Control Desk SPS: SCN Washington, D. C. 20555-0001 Docket No.: 50-281 License No.: DPR-37

Subject:

Surry Power Station Response to Request for Regulatory Conference (EA-20-057; Inspection Report 05000-281/2020090)

By letter dated June 26, 2020, the Nuclear Regulatory Commission (NRC) transmitted its preliminary determination of a white finding and apparent violation associated with the Unit 2 turbine-drive auxiliary feedwater system discharge check valve failure that occurred at Surry Power Station on November 20, 2019. Contained in that letter was a request that Dominion Energy (DE) provide its intention whether DE intended to request a regulatory conference on the preliminary determination from the letter.

DE personnel have worked closely with the Staff's risk assessment personnel in order to characterize the event; consequently, a regulatory conference is not requested, and it is acknowledged that the DE's right of appeal of the final significance determination and enforcement decision will be waived.

If you have any additional questions, please contact Richard Philpot at (757) 365-2647.

})

  • f'c,(l, f'U.I\ M\.ADW F. Mia en Site Vice President Surry Power Station Commitments contained in this letter: None cc: U.S. Nuclear Regulatory Commission, Region II Marquis One Tower, Suite 1200 245 Peachtree Center Ave., NE Atlanta, GA 30303-1257 NRC Senior Resident Inspector Surry Power Station