Letter Sequence Other |
---|
|
|
MONTHYEARML19232A2332019-09-0404 September 2019 Letter Requesting EPRI MRP 2019-002 Project stage: Other ML19291A0062019-10-28028 October 2019 Request for Materials Reliability Program: MRP-230, Flexible Operations Technical Basis Report Project stage: Other ML20017A3452020-02-10010 February 2020 Request for MRP-60 Rev 5 and MRP-189, Rev 3 Project stage: Other ML20022A1732020-03-0202 March 2020 U.S. Nuclear Regulatory Commission Proprietary Determination Letter for Materials Reliability Program: Functionality Analysis for Flexible Operations of Westinghouse-Design Representative PWR Internals (MRP-230, Revision 2-Supplement 2) Project stage: Other ML20211L6822020-08-25025 August 2020 Request for MRP-230 Revision 3 Project stage: Other 2020-02-10
[Table View] |
|
---|
Category:Letter
MONTHYEARML20211L6822020-08-25025 August 2020 Request for MRP-230 Revision 3 ML20142A3802020-06-10010 June 2020 Memo to ACRS - Transmittal of Safety Evaluation Revision 2 for EPRI Triso Topical Report ML20091L0912020-05-11011 May 2020 U.S. Nuclear Regulatory Commission Proprietary Determination Letter for MRP-189, Revision 3 and MRP-60, Revision 5 (EPID L- 2020-TOP-0007) ML20086M8272020-04-0707 April 2020 Letter to EPRI - Transmittal of Draft Safety Evaluation for EPRI Triso Topical Report ML20022A1732020-03-0202 March 2020 U.S. Nuclear Regulatory Commission Proprietary Determination Letter for Materials Reliability Program: Functionality Analysis for Flexible Operations of Westinghouse-Design Representative PWR Internals (MRP-230, Revision 2-Supplement 2) ML20006D1522020-02-19019 February 2020 U.S. Nuclear Regulatory Commission Verification Letter for Electric Power Research Institute Topical Report MRP 227, Revision 1, - Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluations Guideline -(L-2 ML20017A3452020-02-10010 February 2020 Request for MRP-60 Rev 5 and MRP-189, Rev 3 ML19291A0062019-10-28028 October 2019 Request for Materials Reliability Program: MRP-230, Flexible Operations Technical Basis Report ML19232A2332019-09-0404 September 2019 Letter Requesting EPRI MRP 2019-002 ML19198A1792019-08-0606 August 2019 Request for Materials Reliability Program: MRP 2019-009, Interim Guidance Regarding MRP-227-A and MRP-227, Revision 1 PWR Core Barrel and Core Support Barrel Inspection Requirements ML19200A2002019-08-0505 August 2019 Electric Power Research Institute, Inc. - Acceptance of Uranium Oxycarbide (Uco) Tristructural Isotropic (Triso) Coated Particle Fuel Performance Topic Report ML19081A0012019-04-25025 April 2019 Final Safety Evaluation for Electric Power Research Institute Topical Report MRP-227, Revision 1, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluations Guideline ML18275A0692019-02-28028 February 2019 MRP-227 Rev 1 Draft SE Transmittal Letter ML19028A0132019-02-0707 February 2019 Request for Materials Reliability Program: Inspection Standard for Pressurized Water Reactor Internals - 2018 Update (MRP-228, Rev. 3) ML19002A0982019-01-23023 January 2019 Request for Materials Reliability Program: Screening, Categorization, and Ranking of Reactor Internals Components for Westinghouse and Combustion Engineering PWR Design (MRP-191, Revision 2) ML18176A1882018-07-12012 July 2018 Operating Experience Request for Additional Information for Electric Power Research Institute Topical Report MRP-227, Revision 1 (CAC No. MF7223; EPID L-2016-TOP-0001) ML18072A1342018-03-23023 March 2018 Request for Materials Reliability Program: Evaluation of Carbon Macrosegregation in Class 1 Reactor Coolant System Forgings (MRP-428) ML18016A0082018-01-29029 January 2018 Final Safety Evaluation of Action Items 1 and 7 from Topical Report MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluations Guideline ML16238A1332018-01-0303 January 2018 Letter on Draft SE for MRP-227 Action Items 1 and 7 2020-08-25
[Table view] |
Text
August 25, 2020 Brian Burgos MRP Program Manager Electric Power Research Institute 3420 Hillview Avenue Palo Alto, CA 94304
SUBJECT:
REQUEST FOR MRP-230 REVISION 3 (EPID L-2019-PMP-0095)
Dear Mr. Burgos:
The purpose of this letter is to request that the Electric Power Research Institute provide Materials Reliability Program: Functionality Analysis for Westinghouse and Combustion Engineering Representative PWR [Pressurized Water Reactor] Internals (MRP-230, Revision 3).
In the nonproprietary version of the report, EPRI should redact only that information that is proprietary and not entire pages or sections.
If you have any questions, please do not hesitate to contact me at (301) 415-7297 or by electronic mail at Joseph.Holonich@nrc.gov.
Sincerely,
/RA/
Joseph J. Holonich, Senior Project Manager Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 99902021
ML20017A345 *via e-mail OFFICE NRR/DORL/LLPB/PM* NRR/DORL/LLPB/LA* NRR/DORL/LLPB/BC* NRR/DORL/LLPB/PM*
NAME JHolonich DHarrison DMorey JHolonich DATE 07/29/2020 08/04/2020 08/07/2020 08/25/2020